TCS SW Test Reports

  • November 17, 2014 - 2014D Test Report: Passed. Put into Science Operations. The major changes were the addition of IT severity codes, and an improved oacserver.

  • June 13, 2014 - 2014C Test Report: Passed. Put into Science Operations. The major changes were the use of severity codes for GUI color control and the Alarm Handler.

  • May 5, 2014 - 2014B Test Report: Passed. Put into Science Operations. The regression testing was shallow, but there were not many changes in the build, and they were checked out.

  • Nov 15, 2013 - 2013D Test Report: Passed. Put into Science Operations. All testing done later by John Hill due to weather.

  • Sep 6, 2012 - 2012G Not tested due to weather.

  • May 9, 2012 - 2012E Test Report: Not passed because could not open.

  • Apr 1, 2012 - 2012D Test Report: Failed.

  • P8 Test Report Not put into science operations. Science will continue with:
    - AO5 for monocular and/or master/slave observing with LBC.
    - BP7 for Gregorian instrument observing.

  • BP7 Test Report: Passed monocular telescope performance for Gregorian instruments. Put into operations for monocular Gregorian operations. Should not be used with the LBC instrument.

TCS Test Plan Template

  • Note: The scripts for the TCS static and dynamic LST tests are located in ~telescope/BuildTests/scripts

-- NormCushing - 04 March 2010
Topic revision: r41 - 18 Nov 2014, ChrisBiddick