Prev Next

SW&IT Meeting Minutes 2021-04-26

Attendees: David, Matthieu, Michael, Paul, Stephen, Xianyu, Yang

Outlook

Labor Reporting

Report auto-generated every Monday at 6:30am, Do not edit this table, Update your entries in smartsheets.

20210419
LR20210419 - Bec, Matthieu 40.0
LR20210419 - Edmeades, David 0.0
LR20210419 - Sizemore, Michael 0.0
LR20210419 - Grenz, Paul 0.0
LR20210419 - Hooper, Stephen 80.0
LR20210419 - Zhang, Yang 40.0
LR20210419 - Zhang, Xianyu 40.0

News from management

Previous Action Items

Owner Action Due Date Completion Date

Open topics

  • MaxB interview
  • MS outboarding, laptop
  • Summer power maintenance

Team reports

MB

  • Last week
    • OC, Management
    • DMS zwgd ready
    • s/w interview
    • AO wbs
  • This week
    • s/w job ad #2
    • tcs refmem recorder for E night?
    • GMT M1 review

YZ

  • Previous:
    • MODS 64-bit transition work (also worked with Olga on this)
    • TMS bino-mode software.
  • Next:
    • MODS 64-bit transition work to continue.
    • TMS bino-mode software (I said I would release a version this week).

DE

  • Last week
    • Office trip for ports
      • Specific to Mark: His office ports were shut off. UITS engaged one of the two (!) available infrastructure switch ports to reactivate. Mark will verify early this week
      • More broadly: Lots of ports shut off, e.g. 507. One more in 507 is re-enabled
      • Have spreadsheet regarding ports, will peruse and report on its usefulness
    • Backblaze monitoring
      • Going well; I do think that I'm going to pull back on the Vault backups. Given Stephen's point about it being a self-contained revision history I think we can save resources there
    • Hardware repair dropoff
    • Cisco training complete!
    • Ordered DVI extension cable to see if we can connect KVM and console. Part arrived.
  • Next:
    • Pick up repaired hardware
    • Investigate options for CCNA test
    • Aforementioned work on network ports
    • Aforementioned work on backup cadence
    • Cobbler on my mind
    • Storage whitepaper

PSG

  • Last week
    • Had Covid shot, no work done.
  • This week
    • Coordinating with Gustavo with setting up D425 in lab.
    • Downloading & reuploading configuration as a test.
    • Testing new code on UMAC in lab.

XZ

  • Last week
    • Improve ASM flat analysis routine with Guido
    • Improve the ASM actuator analysis with Guido
    • Data analysis for SX and DX actuator analysis with Guido
    • Worked with Guido and Doug to get UAO version of SX software operating properly for ARGOS daytime test
    • Meeting with Arcetri and other LBTO personnel on PB software development
    • AO support
  • This week
    • Improve ASM flat analysis routine with Guido
    • SX and DX flat analysis
    • Safety training
    • AO support

SH

  • Replacement PEPSI solar switch
  • Ao-analysis
  • DIMM work (CentOS 8, Fedora 33)
  • DNS kickstart

next:

This topic: Software > MeetingMinutes20210426
Topic revision: 26 Apr 2021, MatthieuBec
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback