SW&IT Meeting Minutes 2018-09-10
Attendees: David, Igor, Kellee, Matthieu, Petr, Stephen, Xianju, Yang
Outlook
News from management
- s/w recruitment
- finance committee cybersecurity report
- Peter G moving in 508e
Previous Action Items
- Vsphere (DE)
- power plan update draft (DE)
- Luci H/O doc (IS)
- Luci telemetry - web-io cold heads state for vibration (IS)
Transition plan
Handover steps
-
primary + secondary do self learning, gather information, read wiki
-
primary organize teamviewer/zoom walk through with Kellee and secondary
-
primary draft techtalk w. input from secondary
-
techtalk review by Kellee
-
primary does a team presentation
Please update this table to indicate progress.
Application(s) |
Primary |
Secondary |
Week |
OAC |
AC (2) |
Petr (2) |
1 |
AzCam |
AC (2) |
Petr (2) |
2 |
DIMM |
AC (2) |
Petr (2) |
2 |
Weatherstation |
AC |
Petr |
3 |
FACSUM,WEATHERSTATION |
AC |
Matthieu |
4 |
ALH |
Igor(1/2) |
Matthieu (2) |
1 |
INDI |
Igor |
Matthieu |
3 |
GCS |
Petr (2) |
Matthieu (2) |
1 |
Telemetry |
Petr (1) |
Matthieu (1) |
2 |
OVMS |
Petr (2) |
Matthieu (2) |
3 |
Status Server |
Stephen (1) |
Matthieu |
2 |
Telemetry cleanup |
Stephen |
Petr |
3 |
LBC |
Yang (1) |
Igor(1/2) |
2 |
MODS |
Yang |
Igor |
2 |
Telem-VIZ |
Yang |
Stephen |
3 |
particle monitors |
Yang |
Petr |
4 |
Open topics
Bring any topics you want for discussion at the meeting here. Use <topic>[<name>] formatting.
- UA time
- Telescope time, mountain managers
This week in github
Team reports
MB
- management OC, WPC chair
- Handover activities
- Science Archive digging into sciops
- s/w interview
- cyber security report for finance committee
- nightwriter discussion with Shane Walsh
next:
- IT to github issues
- TMT ESW review
- jumbo / Soul
YZ
- Working on transition to Kellee's LBC responsibility.
- Met with Kellee, Igor, and Olga.
- Editing notes with Igor.
- Will meet with Kellee again sometime.
- LBC is complicated so takes longer time (will start MODS learning afterwards).
- Working on collimation software.
- Continue working on documenting pointing and collimation procedures.
- Continue working on Python package and modules.
- Need to start gather more info on Al's AO project.
PK
- Chasing two TCS problems - left WFS not converging and LBC NS tracking
- Upgraded GCSGUI, working on more updates (replacing QLabel with proper QGraphicsView,..)
- AZCam, OAC and DIMM HO meetings
- Edited OVMS kernel update wiki
next:
- Further chasing (and hopfully solving) TCS problems
- Telemetry and Weatherstation HO
- GCS, OVMS presentation
KS
Last week
- Weatherstation issue - not reading wind data. LeRoy found the media converters in a bad state and one fiber broken. Rear is still not reading.
- Transition meetings - ALH, OAC, AzCam, LBC, DIMM.
- Wiki updates for OAC telemetry and new build dependencies.
- LBC blue tech controller reading bad voltages - a little delving into the code to see how it's checking.
This week
- Continue handover meetings as they come up.
- Walk through LBC log with Yang/Igor.
SH
Last week:
- Jumbo frames switch configuration, CRA configuration, LBTI computer changes.
- clean-up of rm507 computers.
- Cindy e-mail change (Google makes this really easy)
- obs1 running VNC for mirroring
- jet issues on Thursday
This week:
- Statserv handover
- Jumbo frames meeting and network changes continued.
- Mountain on Thursday to make sure SOUL jumbo frames ready to go.
- Changes to networking for MGIO in utility building.
IS
Last Week:
- HandOver
- ALH:
- Going through documents and code. Had meeting with Keelee and Mathieue
- LBC:
- Went through some highlevel documentation and view some of the code, part because of handover and part because of #7380
- PIT
- Revisit PIT table and send a test release to science operations.
- OT/LBC #7380
- Possible issue with proper motion units/amounts in LBC scripts. As part of the investigation had to generate a spreadsheet with all the observations done since proper motion was added to the OT and grab the LBC XML generated. Also started to look a little bit into the LBC code to understand how proper motion is handle.
This Week:
- LUCI development of AFC RTD
- Handover
- PIT point release.
DE
Last week:
- Followup on DIN switches. Should ship today, Perle upgraded us to overnight shipping
- VMWare upgrade consult
- Direct path to 6.5 U2
- Latest is 6.7, but I don't see a reason to double-update right now
- Handholding Ketiv with Vault credentials
- Changed setting for Groups access at Christian's request to allow external committee members to use Groups
- Peter Gray setup tweaks
- Should have his LBT computer this week
- Meeting with UPS vendor moved to Tuesday, should have good info then
This week:
- Go through VMWare upgrade docs to double-check for gotchas, though I think we are okay
- Set up Peter's computer/office
- Meeting with Tripp-Lite re: 3-phase UPS
- OAC telemetry sync script