adSec Test

This page contains background material related to the live test with LN GWS commanding the LBT adaptive secondary
The test is planned for sometime during I-8 (early June)
A test of the fiber run to the tree house is being considered for latter half of I-6 (approx. 23-April)

Relevant material from the similar test done during PF/T2:
I Attachment Action Size Date Who Comment
MOV_0957.mp4mp4 MOV_0957.mp4 manage 7 MB 11 Apr 2016 - 19:59 AlbertConrad  
T2travel.gifgif T2travel.gif manage 19 K 11 Apr 2016 - 19:59 AlbertConrad  
caT2report09apr2013.pdfpdf caT2report09apr2013.pdf manage 82 K 11 Apr 2016 - 20:27 AlbertConrad  
caT2report10apr2013.pdfpdf caT2report10apr2013.pdf manage 77 K 11 Apr 2016 - 20:27 AlbertConrad  
caT2report11apr2013.pdfpdf caT2report11apr2013.pdf manage 95 K 11 Apr 2016 - 20:27 AlbertConrad  
caT2report12apr2013.pdfpdf caT2report12apr2013.pdf manage 106 K 11 Apr 2016 - 20:27 AlbertConrad  
slopeTest_03.pdfpdf slopeTest_03.pdf manage 556 K 11 Apr 2016 - 20:27 AlbertConrad  
Topic revision: r1 - 11 Apr 2016, AlbertConrad
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback