You are here:
Foswiki
>
FLAO Web
>
TowerLab
(07 Jul 2011, EnricoPinna)
Edit
Attach
Tower downtime log
TowerDowntimeLog
Tower Test Logs
FLAO #1
TowerTest20090420
TowerTest20090424
TowerTest20090518
Cloop con disturbo
TowerTest20090521
TowerTest20090525
TowerTest20090528
TowerTest20090529
TowerTest20090601
TowerTest20090603
TowerTest20090605
TowerTest20090608
TowerTest20090609
TowerTest20090610
Kalman test I
TowerTest20090611
TowerTest20090612
TowerTest20090615
Kalman test II
TowerTest20090616
TowerTest20090617
TowerTest20090618
Kalman test III -failed
TowerTest20090619
TowerTest20090622
TowerTest20090623
TowerTest20090625
TowerTest20090626
no data acquired. software test.Pupil acquisition procedure
TowerTest20090629
test sinusoidal rec.acquired psf. Change fibre to 5.8um
TowerTest20090630
test PSF working wiht the ADC.
TowerTest20090701
Sinusoidal and TT calibration
TowerTest20090702
TT calibration and ADC removing
TowerTest20090703
ADC substitution
TowerTest20090706
PSF 47 test
TowerTest20090707
???
TowerTest20090709
???
TowerTest20090710
Cloop bin 1
TowerTest20090713
Cloop bin 2
TowerTest20090714
test bin 1,bin 2 CLOSE BIN 3, 4.
TowerTest20090715
TowerTest20090716
TowerTest20090717
Mount IRTC dichroic.
TowerTest20090720
aligning IRTC
TowerTest20090721
moving IRTC
TowerTest20090722
again moving IRTC
TowerTest20090723
Remounting Lucifer window + Kalman
TowerTest20090724
Kalman
TowerTest20090727
push-pull matrix
TowerTest20090727b
Kalman
TowerTest20090728
psf measurements with dichroics and filters
TowerTest20090728b
Kalman
TowerTest20090729
IRTC PSF / Dismounting FLAO
TowerTest20090730
LBT672a software/hardware preliminary test
TowerTest20090731
LBT672asw/hw preliminary test and hw setting
TowerTest20090806
W#1 Ron test with insulating mount
TowerTest20090808
Optical Influence Functions measurements, part 1
TowerTest20090810
Optical Influence Functions measurements, part 2
TowerTest20090811
Chopping optical test
TowerTest20090812
Optical Influence Functions measurements, part 3 (KL)
TowerTest20090814
Lucifer window test on bench
TowerTest20090817
Optical Influence Functions measurements, part 4 (KL)
TowerTest20090827
Optical Influence Functions measurements, part 5 (KL), failed
TowerTest20090828
TowerTest20090829
Data analysis log and additional KL measurements
TowerTest20090831
ron test W1 and start optical alignment of W2
TowerTest20090901
optical alignment W2
TowerTest20090902
optical alignment W2
TowerTest20090903
optical alignment W2,improve the performance
TowerTest20090904
optical alignment W2,improve the performance
TowerTest20090907
Ron test W2 in the solar tower
TowerTest20090908
preparing W2 forinstallation
TowerTest20090909
Camera lens DAY!
TowerTest20090910
W2 mounted on solar tower
TowerTest20090911
ADSEC chiller fails, pupil re-rotator stuck: decreased speed!Porting W2 sw to aoserver
TowerTest20090914
chiller reparing, alternative coling implementation
TowerTest20090915
Test KL Fernando in closed loop; LBT board DEMO
TowerTest20090916
Mirror standard and KL Modal bases (Recs acquired).Amplitude file optimized.
TowerTest20090917
Fine wfs alignment: magnification check. New strategy for cloop pupil identification
TowerTest20090918
Fine wfs alignment: tuning rotation and shift
TowerTest20090921
pic board changed, CCD47 focused, W2 remounted
TowerTest20090922
irtc mounted and cooling implemented, first IRTC alignment with W2
TowerTest20090923
IRTC alignment and CLOSED LOOP on with 80% Strehl
TowerTest20090924
Re-check IRTC PSF and revising pupil acquisition procedure
TowerTest20090925
IRTC CLOOP bin 1 old disturbance. Automatic GAIN optimization test.
TowerTest20090928
IRTC PSF,FIRST AND SECOND BASELINE POINTS (high & low flux),new disturbance applied.
TowerTest20090929WUNIT
:
TowerTest20090929b
: Solar tower conditionig system failure
TowerTest20090930
BIN3 PUPIL AND RECONSTRACTOR DONE. PROBLEM WITH THE BCU47, the w unit off. stop operations
TowerTest20091001
PROBLEM WITH CH3 OF THE TT. REMOUNT AT 18:30.
TowerTest20091002
BIN3 BASELINE POINTS.STARTING BIN 4 not finished.
TowerTest2009
1005
TowerTest20091006
TowerTest20091007
TowerTest20091008
TowerTest200910009
Deep
AdSec
diagnostic session, MArco, Runa, Armando
TowerTest20091013
BIN3 LOW FLUX, SEEING 1" AND 0.8". old logic control back
TowerTest20091014
TowerTest20091015
bin 1 and bin 2 disturbance 1" and 0.6"
TowerTest20091016
RON measurements
TowerTest20091020
take off the W UNIT
TowerTest20091021
STARTING COLD TEST AGW#2
TowerTest20091022
COLD TEST...
TowerTest20091023AdSec672a
lab testing, session2
TowerTest20091023W2
very cold test (-21C
TowerTest20091028
New HP alignment
TowerTest20091029
TowerTest20091030
Kalman and H-infinity tests
TowerTest20091103
TowerTest20091104
TowerTest20091105
working on the bin 2 and 4. new REC for bin 2 good performances 13.7 mag- SR 31% baseline(simul+TS 27%)
TowerTest20091106
TowerTest20091110
TowerTest20091112
TowerTest20091116
TowerTest20091117
TowerTest20091118
TowerTest20091119
TowerTest20091120
TowerTest20091123
PSF measurements
TowerTest20091124
PSF measurements BIN 3 new REc Rec_20091124_172104, good performance.
TowerTest20091125
TowerTest20091126
TowerTest20091127
AOS commands and lamp settings to simulate magnitudes.
TowerTest20091130
TowerTest20091201
TowerTest20091202
Software work, new start up and setup procedure.
TowerTest20091203
Software work, Error handling.
TowerTest20091204
TowerTest20091207
TowerTest20091208
system process start up, shutdown,..Decondary Flat measurements.acquire different star magnitude, NEW REC BIN 3, NEW MODAL BASE KL_v2
TowerTest20091209
TowerTest20091210
TowerTest20091214
TowerTest20091222
TowerTest20091223
TowerTest20100115
TowerTest20100118
TowerTest20100119
TowerTest20100120
LabTest20100422
LabTest20100423
LabTest20100429
LabTest20100505
LabTest20100507
LabTest20100728
LabTest20100803
LabTest20100804
LabTest20100805
LabTest20100810
LabTest20100825
FLAO #2
LabTest20101223
AGW#1 mounted on the tower, defined hexapod position
LabTest20101227
LabTest20101228
LabTest20110103
LabTest20110104
Cambiata la PIRAMIDE cambiato il LINEARE
LabTest20110105
Redefined Wboard fine alignment
LabTest20110107
LabTest20110110
W fine pupil alignement
LabTest20110111
Pupil distance fine adjustement
LabTest20110112
Mount / unmount AGW for pupil align
LabTest20110113
Misura magnification con coppie di attuatori: pup ASM 2% troppo grandi
LabTest20110114
LabTest20110117
Test dalla FLAO control room
LabTest20110118
Pupil Magnification correct w/ASM, pupil side 36.2
LabTest20110119
BNC cables CCD39 adjusted, pyramid position adjusted, CORRECT PUPIL GEOMETRY achieved
LabTest20110120
Montata lucifer window.
Nuove posizioni esapodo.
Loop di lente di camera ripristrinato (assi scambiati rispetto al W#2!)
LabTest20110121
IRTCL2 stage problem
LabTest20110125
IRTC fixed!
LabTest20110126
SR 80% measured without disturbance
LabTest20110127
Pupil clock and shift adjusted. New Pupil acquired and hottization. Intmat 600 modes. Cloop 1kHz 83% no dist
LabTest20110128
SR BIN1 Test 400 modi vs 600 modi
LabTest20110131
Calib & SR BIN2, plottone
SRvsMAG
v1
LabTest20110201
Calib Bin3
LabTest20110203
Bin4 Rec and cloop test - ND filters installed in the Aux FW - IRTC dismount for Aux intallation - FLAO progress meeting
LabTest20110204
Aux FW mounted and cabled - Cloop mag 14.7 Bin4
LabTest20110207
Aux FW remotizzata con VNC/ Cloop bin 3
LabTest20110208
Solved issue on CCD39 RO Speed selection- RON test with AO table speed -Vibration found!!!
LabTest20110209
Virbrazione <- pompa tubone, misure a bin3 a mag 14.2->15.2 buone ma con ADC rirot e FW spenti
LabTest20110210
Bin 4 SR measured, Bin2 SR measured, No modulation test. SR_ESPOSITO warning on flux introduced
LabTest20110211
Bin 2 SR measured at various mags. SR_ESPOSITO upgraded
LabTest20110214
Problems with TCS...
LabTest20110215
Problema con IRS etc... BIN1 mag 9.3
LabTest20110216
bin2 faint, bin 1 faint, first test pyr+LGS
LabTest20110217
defocus 4 LGS tests
LabTest20110218
LGS test - IRTC dismounted
LabTest20110221
LGS defocus + 300u fiber - AGW dismounted - PITSTOP start
LabTest20110223
PIT STOP - ADSEC dismounted - RON investigation
LabTest20110224
PIT STOP - AGW#1 RON investigation
LabTest20110225
PIT STOP - AGW#1 board grounding upgrade
LabTest20110228
PIT STOP - LJ39 input board changed back - Flowerpot connector modified - Linear power supply installed (mechanic)
LabTest20110303
PIT STOP - check BCU47 - PIC controller installed and modified - other minors
LabTest20110304
PIT STOP - Linear power supply cooling pipes - AGW in the fridge
LabTest20110307
COLD TEST
LabTest20110309
COLD TEST
LabTest20110310
COLD TEST
LabTest20110311
LabTest20110314
Flowerpot problems
LabTest20110315
Flowerpot problems
LabTest20110316
Flowerpot problems - flowerpot back in operations
LabTest20110318
LabTest20110321
Flowerpot PIC board substituted w spare corrected
LabTest20110322
Flowerpot working properly - RON problem w Rerot ADC FW
LabTest20110323
LabTest20110324
LabTest20110325
AGW remounted on tower, new hexapod position, Probema con riga su pup: filo o cubo?
LabTest20110328
Lucwin dismounted - Bar w/ mirror mounted - Pupil vignetting investigation w/ laser
LabTest20110329
Lucwindow re-mounted - Rec Bin1 500modes - Check low flux w/ auxfw
LabTest20110330
AOS test - AGW unmounted
LabTest20110331
LabTest20110401
Carbone @Arcetri
LabTest20110404
AGW mounted on the tower - Check RON
LabTest20110406
LJ39 input connector SOLVED
LabTest20110407
New IM and Cloop SR @BIN1 e BIN2
LabTest20110408
RON test w/various lab plugs; Cloop SR @Bin2 w Bin3
LabTest20110411
Cloop SR @bin4
LabTest20110412
AOS test. AGW dismounted
LabTest20110413
Skytech
LabTest20110414
Skytech
LabTest20110415
Skytech (Misure RON anche in montagna AGW#2)
LabTest20110418
AGW mounted - Motor disable: RON OK!!
LabTest20110419
IRTC flange mounted - Lamp intensity meas - Script for performance
LabTest20110420
LabTest20110421
Automatic procedure bin1&2
LabTest20110426
LabTest20110427
LabTest20110428
Autogain iterativo, Cloop seeing 1.2 mag 8.5; Chiller failure
LabTest20110429
SR @ seeing 0.4, 0.6, 1.2, 1.5"
LabTest20110502
NCP aberration
LabTest20110503
NCP aberration bin1 and bin2
LabTest20110504
Acceptance script test
LabTest20110505
Acceptance script test
LabTest20110509
Acceptance day 1
LabTest20110510
LabTest20110511
LabTest20110512
LabTest20110513
FLAO#2 accepted
LabTest20110516
Fibra 0.33" e 0.1"
LabTest20110517
Fibra 0.6"
LabTest20110518
Fibra 1mm = 1.67"
LabTest20110519
No Modulation Tests!
LabTest20110520
Problema fibra fast link
LabTest20110523
Problema fast link risolto
LabTest20110525
AGW dismounted - W Electronic AI solving
LabTest20110526
W Electronic AI solving
LabTest20110530
W Electronic AI solving - Sensirion restored
LabTest20110531
Zeppe alle box sx e dx - Pesatura AGW
LabTest20110601
Visita sarta - styrodur lineare
DATArecordFORMS
TowerConfigurations
TiPs
Miscellaneous
Solar Tower Optical Bench Status
IDL Related pages
IDLSoftwareTODO
Software TODO list
SoftwareTODOlist
AdsecDiagnosticsTODOlist
Photo
20 Jan 2010
DeliveryFromArcetriW
WeigthingW
E
dit
|
A
ttach
|
P
rint version
|
H
istory
: r266
<
r265
<
r264
<
r263
|
B
acklinks
|
V
iew wiki text
|
Edit
w
iki text
|
M
ore topic actions
Topic revision: r266 - 07 Jul 2011, EnricoPinna
FLAO
Log In
Toolbox
Create New Topic
Index
Search
Changes
Notifications
RSS Feed
Preferences
Users
Groups
Webs
ARGOS
AdaptiveOptics
Commissioning
Engineering
FLAO
Instrumentation
LBTI
Main
MountainOperations
Operators
PartnerObserving
ProjectManagement
Safety
Sandbox
Software
SummerShutdown
System
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki?
Send feedback