Unit B: 29 Ago 2011, Telescope Activity Log
Installation of Mirror Unit B on the telescope (SX side)
Connection to Power (from Robert's information)
Three-phase 208V: Panel 62A, Breaker #13,15,17
Single-phase 120V: Panel 62C Breaker #4
Connection of fibers in the cabinet (connected following Joe's schematics):
Bundle-1 fiber pair Blue/Orange (Net-1) in the Trunk port of the Cisco Ethernet Port
Bundle-1 fiber pair Slate/White (Trig-1), fiber Slate in the trigger port of the BCU-Switch board
Bundle-2 fiber pair Blue/Orange (Fastlink-1) to In1 port of the BCU-Switch board (FLAO slopes)
Bundle-3 fiber pair Blue/Orange (Fastlink-3) to out1 port of the BCU-Switch board (LBTI slopes)
Bundle-3 fiber pair Green/Brown (Fastlink-4) to in2 port of the Switch-BCU board (ARGOS slopes)
--
ArmandoRiccardi
- 30 Aug 2011
E
dit
|
A
ttach
|
P
rint version
|
H
istory
: r2
<
r1
|
B
acklinks
|
V
iew wiki text
|
Edit
w
iki text
|
M
ore topic actions
Topic revision: r2 - 31 Aug 2011,
ArmandoRiccardi
FLAO
Log In
Toolbox
Create New Topic
Index
Search
Changes
Notifications
RSS Feed
Preferences
Users
Groups
Webs
ARGOS
AdaptiveOptics
Commissioning
Engineering
FLAO
Instrumentation
LBTI
Main
MountainOperations
Operators
PartnerObserving
ProjectManagement
Safety
Sandbox
Software
SummerShutdown
System
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki?
Send feedback