Day operations
Mounting
Mounted the unit on the telescope
REMAIND: formal request to LBTO about mount the Swagelock of the telescope cooling lines on the swing-arm interface
Removed the mirror cover (M2 retracted)
gap has no contamination: TSS enabled (switch in the swing-arm cabinet)
at zenith tested set_and_flat: OK
Night
Dome opened at about 01:40UT
No mirror cover: Software started to handle TSS (checked communication between
AdSec
Arbitrator and AOS for windspeed data)
M2 is retracted: no setting of the shell is allowed during the night
Temperature cooling oscillation:
there is about 1.5C
PtV
oscillation, about 100s period
The oscillation is not always present. See for instance from 01:30UT to 04:00UT
The temperature variation induces a correlated oscillation on the reading of capacitive sensor (possibly because of mechanical deformation)
--
ArmandoRiccardi
- 19 Sep 2010
E
dit
|
A
ttach
|
P
rint version
|
H
istory
: r3
<
r2
<
r1
|
B
acklinks
|
V
iew wiki text
|
Edit
w
iki text
|
M
ore topic actions
Topic revision: r3 - 20 Sep 2010,
ArmandoRiccardi
FLAO
Log In
Toolbox
Create New Topic
Index
Search
Changes
Notifications
RSS Feed
Preferences
Users
Groups
Webs
ARGOS
AdaptiveOptics
Commissioning
Engineering
FLAO
Instrumentation
LBTI
Main
MountainOperations
Operators
PartnerObserving
ProjectManagement
Safety
Sandbox
Software
SummerShutdown
System
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki?
Send feedback