Software Progress Report - March 2010

In march 2010 continued the activity to support to the commissioning of the AO system on Mt. Graham. Most of the effort was devoted to test at the telescope. The following page contains a resume of the activity which is described in more details in the commissioning logs and reports.

AdSec Software

  • The tracking of elevation to drive bias currents has been implemented and tested.
  • More bug fixing

WFS Software

  • More work on the engineering procedures.
  • Many small enhancements to the engineering GUI's
  • Improved CCD temperature control
  • More bug fixing

AO Software

  • The diagnostic data path between the WFS server and the AdSec server has been tested successfully.
  • Small modifications made to diagnostic software
  • Many bug fixes were done as result of tests.

AOS

  • The support for elevation and windspeed communication to the AO Supervisor (to be used to ensure the safety of the shell) has been tested
  • The logging procedures have been revised.

Miscellaneous

  • Fixed some bugs in the logging software
  • Some housekeeping procedures added
  • Some work on the interferometer support.