  • Some code for the control of the interferometer to support solar tower tests has been developed.

  • The AO Supervisor startup procedure has been revised to allow unattended startup of required components.

  • The hexapod code has been reviewed and tested with some optical measures.

  • Some scripts for the test of optical components (e.g.: rerotator) have been added.

  • Several bugs in the python software interface have been fixed.

  • The software to manage the technical viewer has been debugged and instabilities have been solved.

Most of the above activity is the result of work at the solar tower test bed.

  • The first tests of the secondary mirror code have been performed against the real thing at Microgate.

  • The feed-forward matrix and coils related code has been debugged. The code for housekeeping and testing of the secondary mirror has been ugraded.