Notes on procedures after experience at Commissioning

Shell installation

  • add to unplug fiber, flux-meter and hub-temperature cables at the beginning
  • add to plug fiber, flux-meter and hub-temperature cables at the end
  • add to collect refsignal cables before pushing the shell below the unit
  • add reference to color codes for refsignal connections

Shell flipping

  • mark with red and green the brakes

-- ArmandoRiccardi - 28 Feb 2010