aLogBook20100825

LogBook20100826Mag

LogBook20100827Mag

LogBook20110520Mag

LogBook20110524Mag

LogBook20110525Mag Mappatra fibre e fault (fibre rotte - PT non funzionanti)

LogBook20110606Mag Riaccensione unita' dopo intervento di Roberto

LogBook20110614Mag Miniskirt e test sw,

LogBook20110615 Miniskirt installed + retention ring. software tests

LogBook20110616Mag system test

LogBook20110617Mag actuators replacement

LogBook20110620Mag actuators replacement

LogBook20110621Mag RB torsion

LogBook20110622Mag electrical tests

LogBook20110623Mag electrical tests before installation in ATT

LogBook20110627Mag tower setup

LogBook20110628Mag tower setup

LogBook20110629Mag dyn measures

LogBook20110704Mag ff matrix and new data set for KL modes

LogBook20110705Mag new data set for KL modes (bad measurements repetition and another set acquired)

LogBook20110706Mag obscured modes

LogBook20110707Mag fernando analysis

LogBook20110708Mag KL verification

LogBook20110718Mag Tower alignment, first closed loop 200 mode, LAST HEXAPOD POSITION

LogBook20110719Mag Full calibration with 400 modes

LogBook20110720Mag Closed loop test, modalplot, pupil magnification test

LogBook20110721Mag SR measurement @ bin1

LogBook20110722Mag

LogBook20110801Mag

LogBook20110929Mag Startup after Summer: problem with DSP board.

LogBook20111014Mag

LogBook20111024Mag

LogBook20111025Mag AO loop test

LogBook20111108Mag DSP board substitution.

LogBook20111118Mag

LogBook20111125Mag

LogBook20120209Mag

LogBook20120210Mag

LogBook20120213Mag

LogBook20120214Mag

LogBook20120215Mag

LogBook20120216Mag bin4 calibration

LogBook20120309Mag MG fixing

LogBook20120308Mag MG fixing

LogBook20120308Mag MG fixing

LogBook20120524Mag COMMISSIONING RUN : Shell installation + slew

LogBook20120525Mag COMMISSIONING RUN : slew + tests

LogBook20120526Mag COMMISSIONING RUN : TSS

LogBook20120527Mag COMMISSIONING RUN : TSS

LogBook20120528Mag COMMISSIONING RUN : windscreen + ff

LogBook20120529Mag COMMISSIONING RUN : ff

LogBook20120530Mag COMMISSIONING RUN : final data

LogBook20120531Mag COMMISSIONING RUN : final data

LogBook20121118Mag COMMISSIONING RUN #2: asm install and test

LogBook20121119Mag COMMISSIONING RUN #2: asm test on sky

LogBook20121120Mag COMMISSIONING RUN #2: asm test on sky (2)

LogBook20121121Mag COMMISSIONING RUN #2: w allineamento

LogBook20121122Mag COMMISSIONING RUN #2: primo close loop - problema pupilla

LogBook20121123Mag COMMISSIONING RUN #2: secondo close loop

LogBook20121124Mag COMMISSIONING RUN #2: nuovi modi di fernando

LogBook20121126Mag COMMISSIONING RUN #2:

LogBook20130325Mag COMMISSIONING RUN #3: ASM mount

-- MarcoXompero - 25 Aug 2010