-- RunaBriguglio - 09 Feb 2012

System restart after autumn shutdown

Cooling system restart

ATT restarted on 20120206. bench set at 10°, mirror at 13°

last dewpoint value was 11°, that's why we set mirror at 13°

we let the mirror thermalize slowly with the air inside ATT at 10°

System power-on

power on: 20120209102400

dew point=5°

act478 jumped 2.1m. after 30 minutes warmup it is still saturated, and is removed from position

after 2.5 hours (13:00) the dsp board is still not working. several reset (fsm_fault_recovery) commanded, with no effect

the system temperature is moved to 15° mirror and 12° bench