Membrane Gluing at ADS
Gluing procedure started (membrane insertion with glue) at 18:43: data saved with drift_test procedure.
from 18:43 to 19:35 data set "a" in meas/drift/2009_10_14: sampling 0.5s
from 19:38 to 00:28 data set "b" in meas/drift/2009_10_14: sampling 10s
time to leave the sistem unattended for the night: drift_test procedure stopped to enable the ADAM watchdog
enabling the watchdog the shell reset. The shell has been set again recovering the same position as before within -110/+680nm
the monitoring restarted at 00:47 with data set "c" in meas/drift/2009_10_15: sampling 10s with the ADAM watchdog enabled
--
ArmandoRiccardi - 2009-10-14