19-20May2008
Commissioning Notes from 18 19 May 2008 MST Observers: Doug M on mountain and Andrew R in Tucson. T.O.: Randy G. Summary Rotated WFS by the correct amount, veri...
NEW - 20 May 2008 - 03:21 by AndrewRakich
200905FieldAberationmeasurementDetails
Field Aberration measurements with AGw and IRTC Summary Two separate tests for field aberration measurement described below Details *Prerequisites: stable tele...
NEW - 29 Apr 2009 - 03:27 by AndrewRakich
200905PlanDetails
Bent Gregorian Technical Observing Plan: April/May 2009 Daytime/Closed Dome TCS SW Tests (B24): * Day 1, 09:00 to 15:30: This will involve changing aspects o...
200906PlanDetails
Bent Gregorian Technical Observing Plan: Jun 2009 Execute TCS startup checklist every night * Complete by sunset 1hr * Include mount encoder resets each...
AGwEngineering
Operating the AGw Guider and WFSC Image Acquisition Douglas Miller 10 April 2008 The acquisition of Guider and WFSC images can be accomplished via several com...
AGwSpiralSearch
Script for AGw Spiral Search to Find Unknown Guiding Hotspot Overview This wiki page is the starting point for a suggestion from SWG to make a script that automa...
AGwStages
Operating the AIP AGw Units and oacontrol See MountainOperations/AGWCheatSheet for quick reference. The following only applies to AIP AGWs. The MODS AGWs have...
AOwithIDL
Active Optics with IDL Routines This LBTO package of IDL routines for Active Optics and Focal Station Commissioning has been created by D. L. Miller. This wiki pa...
AcquiringGuiderAndWFSCimages
Operating the AGw Guider and WFSC Image Acquisition Douglas Miller 10 April 2008 The acquisition of Guider and WFSC images can be accomplished via several com...
AdSecInstructions
Adaptive Secondary Mirror Instructions This contains instructions for starting, running, and shutting down the adaptive secondary mirror for seeing limited. Tele...
AzCamServer
Operating the AzCam Guider and WFS units in the AGWs. See MountainOperations/AGWCheatsheet for quick reference. This document summarizes configuration and com...
BGTechProcedures
Some Procedures for (Bent/Direct) Gregorian Technical Observing with IRTC and AGW Overview of AGW Instrument Telescope Alignment (JMH following an IQ Group...
BeginningOfTheNightIRTC
Beginning of the Night Cookbook for IRTC and AGw Commissioning Startup on Instrument Operator's Workstation 1 Start IRAF xgterm on lbtmu05 (see LBTtoolsIRTC) ...
BeginningOfTheNightLUCIFER
Beginning of the Night Cookbook for LUCIFER or MODS Observing from the Telescope, Guiding and Active Optics perspective Summary Normal observers should only hav...
BeginningOfTheNightOperator
Beginning of the Night Cookbook for LUCIFER Observing from the Telescope, Guiding and Active Optics perspective This page is now mostly obsolete. Startup on the...
BinocularObserving
Binocular Observing with Mixed Instrument Pairs at LBT Introduction This wiki page is intended to collect the present and possibly arcane knowledge about binocul...
BinocularTesting
Binocular TCS Testing Roadmap Introduction The purpose of this document is to layout the overall plan for testing the Binocular version(s) of the Telescope Contr...
Binodal20130520
LFBG: Data from 20100921 Initial: = Field Data Results Change needed to remove bi nodal astigmatism initial Fro...
CollimationModel
Simple Instructions for How to Make a Collimation Model to be used by the PSF Subsystem at LBT These steps were extracted from a 20 Nov 2007 email by J. Hill. (J...
Com20080412
Commissioning Notes 20080412 UT Observer: J. Hill and a cast of dozens others both in the control room and in Tucson Telescope Operator: D. Huerta Summary We fix...
r5 - 16 Apr 2008 - 06:47 by NormCushing
Com20080413
Commissioning Notes 20080413 UT Observer: J. Hill, R. Green, R. Zhelem, I. Foppiani in the control room and a gaggle of programmers in Tucson Telescope Operator: ...
r8 - 16 Apr 2008 - 06:48 by NormCushing
Com20080414
Commissioning Notes 20080414 UT Observers: J. Hill, R. Green, R. Zhelem, I. Foppiani in the control room and a flock of programmers in Tucson Telescope Operator: ...
Com20080415
Commissioning Notes for 20080415 UT Observers: J. Hill, R. Green, I. Foppiani and a small pod of programmers in Tucson Telescope Operator: A. Ceranski Summary An...
Com20080416
Commissioning Notes 20080416 UT Observers: J. M. Hill, R. M. Wagner, R. F. Green (first half), I. Foppiani (first half) Telescope Operator: A. Ceranski Summary T...
Com20080417
Commissioning Notes 20080417 UT Observers: J. M. Hill, R. M. Wagner Telescope Operator: A. Ceranski Summary There was very little observing due to high winds. W...
Com20080418
Commissioning Notes for 20080418 UT Observers: J. Hill, M. Wagner plus T. Sargent, P. Grenz, M. Gusick at the beginning. and D. Miller for the second half Telesco...
Com20080419
Commissioning Notes for 20080419 UT Observer: D. Miller Telescope Operator: A. Ceranski Summary Of Evening After a bit of collimation practice, the AGw unit was ...
Com20080420
Commissioning Notes for 20080420 UT Observer: D. Miller Telescope Operator: A. Ceranski Summary Of Evening 30 to 35 mph sustained winds with gust over 40 (48 mph...
Com20080421
Commissioning Notes for 20080421 UT Summary: The only reliable result tonight was re measurement of the rotator center. Used M53, a globular, with 9 stars in co...
Com20080422
Commissioning Notes for 20080422 UT Summary: LBTtools/IRTC * startup and shutdown scripts made. * takepic, takeseq, and takeEFpair now properly read IRTC...
Com20080423
Commissioning Notes for 20080423 UT Summary: LBTtools/IRTC * center script allows interactive positioning of source on detector * takepic, takeseq, and ta...
Com20080424
Commissioning Notes for 20080424 UT Summary: Running Notes/Log (UTtimes): Open at sunset. Problems with air for SX M1, MCSPU 03:35 Everything up and running......
Com20080425
Commissioning Notes for 20080425 UT Summary: Observer: Dave Thompson; TO: Randy Grashuis; Technical Support: John Hill; SW Support: Chris, Michele, Stephen, Jose...
r6 - 25 Apr 2008 - 14:03 by NormCushing
Com20080426
Commissioning Notes for 20080426 UT Summary: This will be the Friday night log which is tonight and thus has not happened yet. If you want the Thursday night lo...
Com20080426SW
Commissioning Notes for 20080426 Software Activities UT Summary: Observer: Dave Thompson; TO: Randy Grashuis; Technical Support: John Hill; SW Support: Chris, Mi...
NEW - 26 Apr 2008 - 09:31 by NormCushing
Com20080427
Commissioning Notes for 20080427 UT Observers: D. Thompson (on mountain), plus J. Hill and D. Miller (in Tucson) Telescope Operator: R. Grashuis Summary: We coll...
Com20080512
Commissioning Notes from 11 12 May 2008 MST Observers: J. Hill and J. Storm on mountain, plus Biddick, Delapena, Grenz, Hooper, Cushing in Tucson Telescope Operat...
Com20080513
Commissioning Notes from 12 13 May 2008 MST Observers: J. Hill and J. Storm on the mountain, plus D. Miller and A. Rakich from Tucson Telescope Operator: R. Gras...
Com20080514
Commissioning Notes from 13 14 May 2008 MST Observers: J. Hill and J. Storm on the mountain, plus D. Miller and A. Rakich from Tucson Telescope Operator: R. Gras...
Com20080515
Commissioning Notes from 14 15 May 2008 MST Observers: J. Hill, J. Storm and N. Cushing on the mountain, plus D. Miller and A. Rakich from Tucson Telescope Opera...
Com20080517
Commissioning Notes from 16 17 May 2008 MST Observers: Doug M on mountain. John H and Andrew R in Tucson. T.O.: Randy G. Summary After a few stops and starts, c...
Com20080518
Commissioning Notes from 17 18 May 2008 MST Observers: Doug M on mountain and Andrew R in Tucson. T.O.: Randy G. Summary Highlight: Achieved "closed loop" activ...
r4 - 19 May 2008 - 07:13 by AndrewRakich
Com20080519
Commissioning Notes from 18 19 May 2008 MST Observers: Doug M on mountain and Andrew R in Tucson. T.O.: Randy G. Summary Rotated WFS by the correct amount, veri...
r17 - 20 May 2008 - 03:16 by AndrewRakich
Com20080521
Commissioning Notes from 20 21 May 2008 MST Observers: D.Thompson at the LBT and A.Rakich, D.Miller in Tucson. OSA: David G. H. Summary A night plagued by high ...
Com20080522
Commissioning Notes from 21 24 May 2008 MST D.Thompson @ LBTO, A.Rakich on call in Tucson (night of the 21st). OSA: David G. H. Summary Growing fire at the 4000...
Com20080610
Commissioning Notes from 9th 10th June 2008 MST Observers: A.Rakich, D.Miller, J.M. Hill, T. Leibold, N. Cushing and S. Hooper in Tucson. OSA: David G. H. Summa...
Com20080611
Commissioning Notes from 10th 11th June 2008 MST Observers: none (at LBT) D. Miller, J. Hill, A. Rakich (in Tucson). OSA: D. Gonzalez Huerta Summary Just starte...
r4 - 11 Jun 2008 - 10:55 by AndrewRakich
Com20080612
Commissioning Notes from 11th 12th June 2008 MST Observers: D. Miller (in Tucson). OSA: David G. H. Summary Wind kept the chamber closed for all but an hour at...
Com20080613
Commissioning Notes from 12th 13th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson). OSA: David G. H., J. M. Hill Software: T. Leibold, S. Hooper, N. C...
r7 - 24 Jun 2008 - 23:32 by AndrewRakich
Com20080614
Commissioning Notes from 12th 13th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson). OSA: David G. H., J. M. Hill Software: T. Leibold, S. Hooper Summ...
Com20080615
Commissioning Notes from 14th 15th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson). OSA: David G. H., J. M. Hill Summary It was another beautiful pho...
Com20080616
Commissioning Notes from 15th 16th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson). OSA: David G. H., J. M. Hill Summary Night time Activities (Time...
Com20080617
Commissioning Notes from 16th 17th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson). OSA: A. Ceranski Summary Night time Activities (Times are in MS...
r6 - 18 Jun 2008 - 03:30 by AndrewRakich
Com20080618
Commissioning Notes from 17th 18th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson). OSA: A. Ceranski Summary First part of the night sorting out a b...
NEW - 19 Jun 2008 - 03:53 by AndrewRakich
Com20080619
Commissioning Notes from 18th 19th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson). OSA: A. Ceranski Summary Night time Activities (Times are in MS...
r3 - 19 Jun 2008 - 11:29 by AndrewRakich
Com20080620
Commissioning Notes from 19th 20th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson). OSA: A. Ceranski Summary Night time Activities (Times are in MS...
Com20080621
Commissioning Notes from 20th 21th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson), J. Storm (at LBTO). OSA: A. Ceranski Summary Night time Activiti...
Com20080622
Commissioning Notes from 20th 21th June 2008 MST Observers: D. Miller, A. Rakich (in Tucson), J. Storm (at LBTO). OSA: A. Ceranski Summary Night time Activit...
Com20080623
Commissioning Notes from 22th 23th June 2008 MST Observers: D. Miller, J. Storm (in Tucson). OSA: A. Ceranski Summary Night time Activities (Times are in MST...
Com20080624
Commissioning Notes from 23th 24th June 2008 MST Observers: D. Miller, J. Storm (in Tucson). Michele and Torsten (software support) OSA: A. Ceranski Summary N...
Com20080625
Commissioning Notes from 25th 26th June 2008 MST Observers: D. Miller, J. Storm (in Tucson). Torsten (software support) OSA: D. Gonzalez Huerta Summary Night ...
Com20080830
Commissioning Notes from 29th 30th August 2008 MST Observers: John H. and a whole load of people at the LBT OSA: David G. H. Summary Wake Up Telescope Never op...
Com20080831
Commissioning Notes from 30th 31th August 2008 MST Observers: A.Rakich, D.Miller, J.M. Hill, T. Leibold, N. Cushing and S. Hooper in Tucson. OSA: David G. H. Su...
Com20080901
Commissioning Notes from 31th August 1st September 2008 MST Observers: A.Rakich, D.Miller, J.M. Hill, T. Leibold, N. Cushing and S. Hooper in Tucson. OSA: Davi...
Com20080902
Commissioning Notes from 1st 2nd September 2008 MST Observers: J. Hill plus A.Rakich, D.Miller in Tucson, and for the second half J. Storm in Potsdam (our first ...
Com20080903
Commissioning Notes from 2nd 3rd September 2008 MST Observers: D.Miller, T.Leibold for a couple hours in Tucson, and for the second half J. Storm in Potsdam OSA: ...
r7 - 13 Oct 2008 - 03:44 by NormCushing
Com20080904
Technical Observing for 3 4 September 2008 MST Observers: D. Miller, A. Rakich and J. Hill in Tucson Telescope Operator: A. Ceranski Summary Lost the first 2 hou...
Com20080905
Technical Observing for 4 5 September 2008 MST Observers: D. Miller, A. Rakich and J. Hill in Tucson plus J. Storm in Potsdam for the second half Software: Torste...
Com20080906
AGw and GCS Commissioning Observing on 05/06 September 2008. Observers: D. Miller, A. Rakich and J. Hill in Tucson, and J. Storm in Potsdam for the second half So...
Com20080907
AGw and GCS Commissioning Observing on 06/07 September 2008. Observers: D. Miller, A. Rakich and J. Hill in Tucson, and J. Storm in Potsdam for the second half Te...
r4 - 07 Sep 2008 - 11:52 by AndrewRakich
Com20080908
AGw and GCS Commissioning Observing on 07/08 September 2008. Observers: D. Miller, A. Rakich and J. Hill in Tucson. A herd of Lucifer people on the mountain Tele...
Com20080909
AGw and GCS Commissioning Observing on 08/09 September 2008. Observers: D. Miller, A. Rakich, N Cushing and J. Hill in Tucson. A gaggle of Lucifer people on the ...
Com20080910
AGw and GCS Commissioning Observing on 09/10 September 2008. Observers: D. Miller, N Cushing, T. Leibold and M De La Pena in Tucson. A pod of Lucifer people on t...
Com20080911
AGw and GCS Commissioning Observing on 10/11 September 2008. Observers: N Cushing, M. De La Pena, C Biddick in Tucson. A pack of Lucifer people on the mountain T...
Com20080912
AGw and GCS Commissioning Observing on 09/10 September 2008. Observers: A covey of Lucifer people on the mountain Telescope Operator: D. Huerta, W. Wack and J. Hi...
Com20080913
AGW Commissioning and LUCIFER Commissioning on 12 13 September 2008 Observers: J. Hill, N. Ageorges, W. Seifert, and numerous other LUCIFERians on mtn More Observ...
Com20080914
AGW Commissioning and LUCIFER Commissioning on 13 14 September 2008 Observers: J. Hill, N. Ageorges, W. Seifert, M. Pedani and numerous other LUCIFERians on mtn M...
Com20080915
LUCIFER Commissioning and AGw Commissioning for 14 15 September 2008 Observers: J. Hill, N. Ageorges, W. Seifert, and numerous other LUCIFERians (Peter, Kai, Marc...
Com20080916
LUCIFER Commissioning (1a) and AGw Commissioning for 14 15 September 2008 (Day 18) Observers: N. Ageorges, W. Seifert, and numerous other LUCIFERians (Peter, Kai,...
Com20080917
LUCIFER Commissioning (1a) and AGw Commissioning for 16 17 September 2008 (Day 19) Observers: N. Ageorges, W. Seifert, and numerous other LUCIFERians (Peter, Kai,...
Com20080918
LUCIFER Commissioning (1a) and AGw Commissioning for 17 18 September 2008 (Day 19) Observers: N. Ageorges, W. Seifert, and numerous other LUCIFERians (Peter, Kai,...
Com20080919
LUCIFER Commissioning (1a) and AGw Commissioning for 18 19 September 2008 (Day 21) Observers: N. Ageorges, W. Seifert, and numerous other LUCIFERians (Peter, Kai,...
Com20080920
LUCIFER Commissioning (1a) and AGw Commissioning for 19 20 September 2008 (Day 22) Observers: Nancy, Walter, Kai, Volker, Andre, Andreas on mtn, D. Thompson. So...
r8 - 10 Oct 2008 - 21:55 by TorstenLeibold
Com20080929
AGw Commissioning for 29 30 September 2008 (Day 1) Observers: Andrew (and Doug on call) J. Hill in Tucson Software Support: N. Cushing, P, Grenz in Tucson Telesc...
NEW - 01 Oct 2008 - 02:45 by NormCushing
Com20080930
AGw Commissioning for 30th September 2008 1st October 2008 (Day 2) Observers from Tucson: Doug Miller, John Hill, Andrew Rakich (with a couple Kiwi) Software Su...
Com20081003
02 03 October 2008 Alignment of the New WFS Camera Observers: D. Thompson and J. Hill in Tucson Instrument Support: (Working hard on the platform above the primar...
Com20081004
Commissioning Software Testing of Build 12 03 04 October 2008 Summary Weather is bad. So we are running closed dome software tests on new TCS build 12 Nightti...
Com20081005
04 05 October 2008 Lost to bad weather Observers: D. Thompson, LUCIFER folks Instrument Support: Tim Shih Software Support: M De La Pena in Tucson Telescope Opera...
Com20081006
05 06 October 2008 On sky TCS SW testing, AGw recalibration (N.Ageorges,W.Seifert, et al) Observers: D. Thompson, LUCIFER folks Instrument Support: Tim Shih Softw...
Com20081007
06 07 October 2008 On sky TCS SW testing, M1 Collimation Observers: D. Thompson, J.Hill (Tucson), LUCIFER folks (N.Ageorges,W.Seifert, et al) Software Support: C....
Com20081008
07 08 October 2008 On sky TCS SW testing, Pointing Model Observers: D. Thompson, J.Hill (Tucson), LUCIFER folks (N.Ageorges,W.Seifert, et al) Software Support: C....
Com20081009
08 09 October 2008 Rotator repair. Observers: D. Thompson, J.Hill (Tucson), LUCIFER folks (N.Ageorges,W.Seifert, et al) Software Support: C.Biddick, D. Cox in Tuc...
Com20081010
09 10 October 2008 Observers: D. Thompson, J.Hill (Tucson), LUCIFER folks (N.Ageorges,W.Seifert, et al) Software Support: C.Biddick, D. Cox in Tucson Telescope O...
Com20081011
10 11 October 2008 Observers: , LUCIFER folks (N.Ageorges,W.Seifert, et al) Software Support: in Tucson Telescope Operators: D.Gonzalez Huerta, W.Wack Summary ...
Com20081012
11 12 October 2008 Observers: , LUCIFER folks (N.Ageorges,W.Seifert, et al) Software Support: in Tucson Telescope Operators: D.Gonzalez Huerta, W.Wack Summary ...
Com20081013
12 13 October 2008 Observers: J. Hill, V. Knierim, W. Seifert, N. Ageorges and other LUCIFER folks, plus J. Schmidt working on DIMM Software Support: M. Delapen...
Com20081014
AGw Commissioning with LUCIFER 13 14 October 2008 Observers: J. Hill , with LUCIFER folks (N.Ageorges,W.Seifert, et al) and DIMM folks (J.Schmidt,T.Herbst) Softw...
Com20081015
AGw Commissioning with LUCIFER 14 15 October 2008 Observers: J. Hill , with LUCIFER folks (N.Ageorges,W.Seifert, et al) and DIMM folks (J.Schmidt,T.Herbst) and A...
Com20081016
15 16 October 2008 Observers: , DThompson, DMiller, ARakich, JHill (Tucson), LUCIFER folks (N.Ageorges,W.Seifert, et al) Software Support: TSargent in Tucson Tel...
Com20081017
16 17 October 2008 Observers: DThompson, ARakich, JHill (from Tucson), LUCIFER folks (N.Ageorges,W.Seifert, et al) Software Support: PGrenz, TEdgin (from Tucson)...
Com20081018
17 18 October 2008 Observers: DThompson, JHill, ARakich in Tucson, LUCIFER folks (N.Ageorges,W.Seifert, et al) Software Support: PGrenz, TEdgin in Tucson Telesco...
Com20081019
AGw Commissioning with IRTC on 18 19 October 2008 Observers: J. Hill on mountain and A. Rakich in Tucson plus J. Schmidt working on DIMM Software support: C. Bidd...
Com20081029
AGw Commissioning with IRTC 28 29 October 2008 MST Observers: J. Hill on mtn and A. Rakich in Tucson. Software Support: N. Cushing, J. Borelli, S. Hooper in Tuc...
Com20081030
AGW Commissioning with IRTC 29 30 October 2008 MST Observers: J. Hill on mtn and A. Rakich in Tucson Software Support: N. Cushing and J. Borelli in Tucson Teles...
Com20081031
AGw Commissioning with IRTC and TCS Software Testing 30 31 October MST Observers: J. Hill on mtn, A. Rakich in Tucson, N. Ageorges in Garching Software Support:...
Com20081101
AGw Commissioning with IRTC 31 October 01 November 2008 MST Observers: J. Hill on mtn and A. Rakich in Tucson Software Support: N. Cushing in Tucson plus P. Gr...
Com20081102
AGw Commissioning with IRTC 01 02 November 2008 MST Observers: D.Thompson, J. Hill on mtn at beginning, J.Storm from Potsdam Software Support: S.Hooper, N. Cushin...
Com20081103
AGw Commissioning with IRTC 02 03 November 2008 MST Observers: D.Thompson at LBT, J.Storm from Potsdam Software Support: S.Hooper, N. Cushing C.Biddick on call as...
Com20081107
AGw Commissioning with IRTC 06 07 November 2008 MST Observers: Hill (at beginning), Miller, Rakich in Tucson, J.Storm from Potsdam Software Support: on call as n...
Com20081108
AGw Commissioning with IRTC 07 08 November 2008 MST Observers: A. Rakich, D. Miller and J. Hill (at beginning) in Tucson, Nancy in Germany Operator: A. Ceranski ...
Com20081109
AGw Commissioning with IRTC 08 09 November 2008 MST Observers: A. Rakich, D. Miller (at beginning) in Tucson, Nancy in Germany Operator: A. Ceranski Summary Det...
Com20081111
AGw Commissioning with IRTC on 10 11 November 2008 Observers: J. Hill (at beginning) and A. Rakich in Tucson Telescope Operator: W. Wack Summary Lost the first 4...
r7 - 13 Nov 2008 - 11:16 by AndrewRakich
Com20081112
AGw Commissioning with IRTC 11 12 November 2008 Observers: J. Hill (at beginning) and A. Rakich in Tucson plus J. Storm (at end) in Potsdam Telescope Operator: ...
Com20081113
AGw Commissioning with IRTC 12 13 November 2008 Observers: J. Hill (first half), D. Miller and A. Rakich in Tucson plus J. Storm (second half) in Potsdam Softwa...
Com20081114
AGw Commissioning with IRTC 13 14 November 2008 MST Observers: J. Hill Software Support: T. Sargent Telescope Operator: W. Wack Summary Details Some time at b...
Com20081115
AGw Commissioning with IRTC 14 15 November 2008 MST Observers: A. Rakich, J. Hill, N. Ageorges in Tucson Telescope Operator: W. Wack Summary Ran acquisition te...
Com20081116
AGw Commissioning with IRTC 15 16 November 2008 MST Observers: A. Rakich, D. L. Miller later, J. M. Hill at times, N. Ageorges in Tucson Telescope Operator: W....
Com20081117
AGw Commissioning with IRTC 16 17 November 2008 Observers: D.Thompson, J. Hill (at beginning) in Tucson, with N.Ageorges, W.Seifert, and J.Brynnel Telescope Op...
Com20081118
BG performance verification with IRTC 17 18 November 2008 Observers: D.Thompson, J. Hill (at beginning) in Tucson, with N.Ageorges, W.Seifert, J. Brynnel Teles...
Com20081119
Supplemental Test of irs/IIF interactions without any observing Observer: J. Hill in Tucson Telescope Operator: D. Gonzalez Huerta Trying purposefully abusive th...
Com20081204
Telescope/TCS Checkout for LUCIFER Com2 UT 2008 December 04 Observers: D.Thompson (@LBT) with N.Ageorges, W.Seifert, P.Buschkamp, M.Juette, V.Naranjo, several ot...
r20 - 09 Oct 2009 - 22:27 by NormCushing
Com20081205
LUCIFER Com2 UT 2008 December 05 Observers: N.Ageorges, W.Seifert, P.Buschkamp, M.Juette, V.Naranjo, several others from LUCIFER team. D.Thompson (@LBT) Telescop...
Com20081206
LUCIFER Com2 UT 2008 December 06 Observers: N.Ageorges, W.Seifert, P.Buschkamp, M.Juette, F.Eisenhauer, several others from LUCIFER team. D.Thompson (@LBT) Teles...
Com20081207
LUCIFER Com2 UT 2008 December 07 Observers: N.Ageorges, W.Seifert, M.Juette, F.Eisenhauer several others from LUCIFER team. D.Thompson (@LBT) Telescope Operator:...
r13 - 10 Dec 2008 - 00:04 by NormCushing
Com20081208
LUCIFER Com2 UT 2008 December 08 Observers: N.Ageorges, W.Seifert, M.Juette, F.Eisenhauer, D.Thompson Telescope Operator: D.Gonzalez Huerta SW Support: T.Edgin, ...
Com20081209
LUCIFER Com2 UT 2008 December 09 Observers: N.Ageorges, W.Seifert, M.Juette, F. Eisenhauer. J. Hill (@LBT) Telescope Operator: A. Ceranski SW Support: T. Edgin o...
Com20081210
LUCIFER Commissioning 2008 December 10 UT Observers: W. Seifert, N. Ageorges, M. Jutte, J. Hill (on mtn) Telescope Operator: A. Ceranski Software Support: T. Sa...
Com20081212
LUCIFER Commissioning 2008 December 12 UT Observers: W. Seifert, N. Ageorges, M. Jutte, J. Hill (on mtn) Telescope Operator: W. Wack Software Support: P. Grenz ...
Com20081214
LUCIFER Com2 UT 2008 December 14 Observers: N.Ageorges, W.Seifert, M.Juette from LUCIFER team. D.Thompson (in Tucson) Telescope Operator: W.Wack SW Support: N.Cu...
Com20081215
LUCIFER Com2 UT 2008 December 15 Observers: N.Ageorges, W.Seifert, M.Juette from LUCIFER team. D.Thompson (in Tucson) Telescope Operator: W.Wack SW Support: N.Cu...
Com20081216
LUCIFER Com2 UT 2008 December 16 Observers: N.Ageorges, W.Seifert, M.Juette from LUCIFER team. D.Thompson (in Tucson) Telescope Operator: W.Wack SW Support: N.Cu...
Com20090103
2 3 January 2009 Observers: J.Hill (Tucson) and A. Rakich (standing by) Software Support: C. Biddick (Tucson) Telescope Operator: J.Rousseau (mtn) plus J. Hill (T...
Com20090104
3 4 January 2009 Observers: J.Hill, A.Rakich (Tucson) Software Support: C. Biddick (Tucson) Telescope Operator: J.Rousseau (mtn) plus J. Hill (Tucson) Summary D...
Com20090105
4 5 January 2009 Observers: Doug Miller, Joar Brynnel (Tucson) Telescope Operator: J.Rousseau (mtn) Summary Closed dome testing Details All times are from lbtmu...
Com20090107
6 7 January 2009 Telescope/TCS Checkout for LUCIFER Com3 UT 2009 January 07 Observers: D.Thompson (@LBT) A.Rakich with N.Ageorges, W.Seifert, M.Juette (Tucson) ...
Com20090108
7 8 January 2009 Telescope/TCS Checkout for LUCIFER Com3 UT 2009 January 08 Observers: D.Thompson, N.Ageorges, W.Seifert, M.Juette (@LBT), ARakich (Tucson) Sof...
Com20090109
Telescope/TCS Checkout for LUCIFER Com3 UT 2009 January 09 Observers: D.Thompson (@LBT) with N.Ageorges, W.Seifert, R.Gredel, M.Juette plus A. Rakich and J. Hill...
Com20090110
LUCIFER Com 3, Night 1 UT 2009 January 10 Observers: N.Ageorges, W.Seifert, R.Gredel, M.Juette, D.Thompson (@LBT) and J. Hill in Tucson for part of night. Teles...
Com20090111
LUCIFER Com 3, Night 2 UT 2009 January 11 Observers: N.Ageorges, W.Seifert, M.Juette, V.Knierem, R.Gredel, D.Thompson (@LBT) Telescope Operator: A.Ceranski SW S...
Com20090112
LUCIFER Com 3, Night 3 UT 2009 January 12 Observers: N.Ageorges, W.Seifert, M.Juette, V.Knierem, R.Gredel, D.Thompson (@LBT) Telescope Operator: A.Ceranski SW Su...
Com20090113
LUCIFER Com 3, Night 4 UT 2009 January 13 Observers: N.Ageorges, W.Seifert, M.Juette, V.Knierim; D.Thompson (@LBT), JHill in Tucson at the beginning Telescope Op...
Com20090114
LUCIFER Com 3, Night 5 UT 2009 January 14 Observers: N.Ageorges, W.Seifert, M.Juette, V.Knierim, J.Hill (@LBT) Telescope Operator: D.Gonzalez Huerta SW Support: ...
Com20090115
LUCIFER Com 3, Night 6 UT 2009 January 15 Observers: N.Ageorges, W.Seifert, M.Juette, V.Knierim, J.Hill (@LBT) Telescope Operator: D.Gonzalez Huerta SW Support: ...
Com20090116
LUCIFER Com 3, Night 7 UT 2009 January 16 Observers: N.Ageorges, W.Seifert, M.Juette, V.Knierim, J.Hill (@LBT) Telescope Operator: D.Gonzalez Huerta SW Support: ...
Com20090117
LUCIFER Com 3, Night 8 UT 2009 January 17 Observers: N.Ageorges, W.Seifert, M.Juette, V.Knierim, J.Hill (@LBT) Telescope Operator: D.Gonzalez Huerta SW Support: ...
Com20090118
LUCIFER Com 3, Night 9 UT 2009 January 18 Observers: N.Ageorges, W.Seifert, M.Juette, V.Knierim, J.Hill (@LBT) Telescope Operator: D.Gonzalez Huerta SW Support: ...
Com20090119
LUCIFER Com 3, Night 10 UT 2009 January 19 Observers: N.Ageorges, W.Seifert, M.Juette, V.Knierim, J.Hill (@LBT) Telescope Operator: D.Gonzalez Huerta SW Support:...
Com20090201
BG February Com Night 1, February 1 2009 UT Observers: J. Hill and A. Rakich in Tucson plus O. Guyon (visiting for a while), and J. Storm in Potsdam (second hal...
Com20090202
BG February Com Night 2, UT February 2 2009 Observers: D.Thompson (in Tucson, during Super Bowl), and then J. Hill and A. Rakich (in Tucson, after 9PM), and N. A...
Com20090203
BG February Com Night 3, February 3 2009 Observers: Dave Ashby and MCS team for first part of night, then Andrew Rakich Telescope Operator: David Gonzalez SW Su...
Com20090204
BG February Com Night 4, February 4 2009 Observers: Andrew Rakich Telescope Operator: David Gonzelez SW Support: Name Telescope Support: Name Summary: Got some...
Com20090205
BG February Com Night 5, February 5 2009 Observers: A. Rakich J. Hill Telescope Operator: D. Gonzales Huerta SW Support: Name Telescope Support: Name Summary:...
r4 - 05 Feb 2009 - 12:20 by AndrewRakich
Com20090206
BG February Com Night 6, UT February 6 2009 Observers: J.Hill, A.Rakich, N.Ageorges, V.Kneirim (in Tucson) plus J.Storm (in Potsdam) Telescope Operator: D. Gonza...
Com20090207
Lucifer February Com Night 1, February 7 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson Telescope Operator: DGonzalez Huerta SW Support: ...
Com20090208
Lucifer February Com Night 2, February 8 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson Telescope Operator: DGonzalez Huerta SW Support: ...
Com20090209
Lucifer February Com Night 3 February 8 9 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson Telescope Operator: DGonzalez Huerta (8 9) SW Su...
Com20090210
Lucifer February Com Night 4 February 9 10 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson Telescope Operator: W.Wack SW Support: PGrenz ...
Com20090211
Lucifer February Com Night 5 February 10 11 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson Telescope Operator: W.Wack SW Support: Teles...
Com20090212
Lucifer February Com Night 5 February 10 11 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson (@LBT), JHill (Tucson) Telescope Operator: W.Wa...
Com20090213
Lucifer February Com Night 7 February 12 13 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson (@LBT) Telescope Operator: W.Wack SW Support: ...
Com20090214
Lucifer February Com Night 8 February 13 14 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson (@LBT) Telescope Operator: W.Wack SW Support: ...
Com20090215
Lucifer February Com Night 9 February 14 15 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson (@LBT) Telescope Operator: W.Wack SW Support: ...
Com20090216
Lucifer February Com Night 10 February 15 16 2009 Observers: N.Ageorges, W.Seifert, V.Knierem (LUCIFER), DThompson (@LBT) Telescope Operator: W.Wack SW Support...
r6 - 16 Feb 2009 - 21:51 by TorstenLeibold
Com20090307
March BG Com Night 1, March 6 7 2009 MST Observers: J. Hill (Tucson), A. Rakich (mtn) Lucifer support: M. Juette Telescope Operator: W. Wack SW Support: N. Cush...
Com20090308
March BG Com Night 2, March 7 8 2009 MST Observers: J. Hill, A. Rakich and T. Schmidt (Tucson) Lucifer support: M. Juette (on call) Telescope Operator: W. Wack S...
Com20090309
March BG Com Night 3, March 8 9 2009 MST Observers: J. Hill, A. Rakich, T. Schmidt (Tucson) and J. Storm (Potsdam) Lucifer support: Walter Seifert (on call) Tele...
Com20090310
March BG Com Night 4, March 10 2009 Observers: J. Hill, A. Rakich (Tucson) and J. Storm (Potsdam) Lucifer support: Nancy Ageorges (on call) Telescope Operator: A...
Com20090311
March BG Com Night 5, March 10 11 2009 MST Observers: J. Hill, A. Rakich (Tucson) plus J. Storm (Potsdam) Lucifer support: N. Ageorges (Garching) Telescope Opera...
Com20090312
March BG Com Night 6, March 11 12 2009 MST Observers: John Hill, Andrew Rakich, Richard Green Lucifer support: Volker Knierim Telescope Operator: Aaron Ceranski ...
Com20090313
March BG Com Night 7, March 12 13 2009 MST Observers: Richard Green, Andrew Rakich Telescope Operator: Aaron Ceranski SW Support: Torsten Leibold Telescope Supp...
Com20090314
March BG Com Night 8, UT 2009 March 14 Observers: Dave Thompson (@LBT), Nancy Ageorges, Walter Seifert, Richard Green, Andrew Rakich (in Tucson) Telescope Operat...
r18 - 09 Oct 2009 - 22:33 by NormCushing
Com20090315
March BG Com Night 9, UT 2009 March 15 Observers: Dave Thompson (@LBT) Telescope Operator: Aaron Ceranski SW Support: Tony Edgin Telescope Support: TShih, JRous...
Com20090316
March BG Com Night 10, UT 2009 March 16 Observers: Dave Thompson (@LBT) NAgeorges, MJuette, WSeifert, ARakich in Tucson Telescope Operator: Aaron Ceranski SW Sup...
Com20090317
March BG Com Night 11, UT 2009 March 17 Observers: Dave Thompson (@LBT) Telescope Operator: D Gonzalez Huerta Lucifer support: N Ageorges (@LBT) SW Support: Pa...
Com20090318
March BG Com Night 12, UT 2009 March 18 Observers: Dave Thompson, NAgeorges, MJuette, WSeifert (@LBT) Telescope Operator: DGonzalez Huerta SW Support: TSargent...
Com20090319
March BG Com Night 13, UT 2009 March 19 Observers: Dave Thompson, NAgeorges, MJuette, WSeifert (@LBT) later Andrew Rakich in Tucson Telescope Operator: DGonzalez...
Com20090401
Telescope and AGw Commissioning at LFBG with IRTC March 31 April 1 2009 MST Observers: J. Hill (mtn), A. Rakich (Tucson), J. Storm (Potsdam) Telescope Operato...
Com20090402
Telescope and AGw Commissioning at LFBG with IRTC 1 2 April 2009 MST Observers: J. Hill (mtn), A. Rakich (standby), J. Storm (Potsdam) Telescope Operator: A. Ce...
Com20090403
Telescope and AGw Commissioning at LFBG with IRTC 02 03 April 2009 MST Observers: J. Hill (mtn), A. Rakich (Tucson Safford Tucson), J. Storm (Potsdam) Telescope...
Com20090404
Telescope and AGw Commissioning at LFBG with IRTC 03 04 April 2009 MST Observers: J. Hill, R. Green (mtn) Telescope Operator: A. Ceranski Telescope Support: J. ...
Com20090405
Telescope and AGw Commissioning at LFBG with IRTC 04 05 April 2009 MST Observers: J. Hill (mtn), A. Rakich (standby in Tucson), J. Storm (Potsdam) Telescope Ope...
Com20090406
Telescope and AGw Commissioning at LFBG with IRTC 05 06 April 2009 MST Observers: J. Hill (mtn), D. Thompson (Tucson, first half), J. Storm (Potsdam) Telescope ...
Com20090407
Telescope and AGw Commissioning at LFBG with IRTC 06 07 April 2009 MST Observers: J. Hill (mtn), D. Thompson (Tucson, first half), A. Rakich (Tucson), J. Storm ...
Com20090408
Telescope and AGw Commissioning at LFBG with IRTC 07 08 April 2009 MST Observers: DThompson, MPedani (until 2:00am), ARakich (from midnight) (in Tucson), JHill ...
Com20090409
Telescope and AGw Commissioning at LFBG with IRTC 08 09 April 2009 MST Observers: DThompson (Tucson) Telescope Operator: DGonzalez Huerta Telescope Support: DOf...
Com20090410
Telescope and AGw Commissioning at LFBG with IRTC 09 10 April 2009 MST Observers: A. Rakich (Tucson) with J. Hill (warmup act) Telescope Operator: DGonzalez Hue...
Com20090411
Telescope and AGw Commissioning at LFBG with IRTC 09 10 April 2009 MST Observers: Telescope Operator: DGonzalez Huerta Telescope Support: SW Support: Summa...
Com20090412
UT 20090412 * Lost entire night to snow and winds. Main.DavidThompson 12 Apr 2009
Com20090413
Telescope and AGw Commissioning at LFBG with IRTC 12 13 April 2009 MST Observers: D.Thompson first half, ARakich second half (from Tucson) Telescope Operator: D...
Com20090414
Telescope and AGw Commissioning at LFBG with IRTC 13 14 April 2009 MST Observers: D.Thompson (@LBT) Telescope Operator: W.Wack Telescope Support: Instrument ...
Com20090415
Telescope and AGw Commissioning at LFBG with IRTC 14 15 April 2009 MST Observers: D.Thompson (@LBT) Telescope Operator: W.Wack Telescope Support: JLittle Inst...
Com20090416
Telescope and AGw Commissioning at LFBG with IRTC 15 16 April 2009 MST Observers: D.Thompson, MPedani (@LBT) Telescope Operator: W.Wack Telescope Support: JLi...
Com20090417
Telescope and AGw Commissioning at LFBG with IRTC 16 17 April 2009 MST Observers: J. Hill (Tucson), MPedani (@LBT) Telescope Operator: W.Wack Telescope Suppor...
Com20090424
Telescope and AGw Commissioning at LFBG with IRTC 23 24 April 2009 Observers: A. Rakich, M. Pedani and J. Hill(Tucson), J. Heidt (@LBT) Telescope Operator: A. ...
Com20090425
Telescope and AGw Commissioning at LFBG with IRTC 24 25 April 2009 Observers: A. Rakich, M. Pedani, J. Hill, J. Heidt (Tucson) Telescope Operator: A. Ceranski ...
Com20090426
Telescope and AGw Commissioning at LFBG with IRTC 25 26 April 2009 Observers: A. Rakich, M. Pedani, J. Hill, J. Heidt (Tucson) Telescope Operator: A. Ceranski ...
Com20090427
Telescope and AGw Commissioning at LFBG with IRTC 26 27 April 2009 Observers: D.Thompson, J. Heidt (Tucson) Telescope Operator: A. Ceranski Software Support: ...
Com20090428
Telescope and AGw Commissioning at LFBG with IRTC 27 28 April 2009 Observers: D.Thompson, J. Heidt (Tucson) Telescope Operator: D.Gonzalez Huerta Software Sup...
Com20090429
Telescope and AGw Commissioning at LFBG with IRTC 28 29 April 2009 Observers:: R .Green, J. Heidt, J. Hill (Tucson) Telescope Operator: David Gonzalez Huerta ...
Com20090430
Telescope and AGw Commissioning at LFBG with IRTC 29 30 April 2009 MST Observers:: R .Green, J. Heidt Telescope Operator: David Gonzalez Huerta Software Suppo...
Com20090501
Telescope and AGw Commissioning at LFBG with IRTC 30April 01May 2009 MST Observers:: R .Green, J. Heidt, D.Thompson Telescope Operator: David Gonzalez Huerta ...
Com20090502
Telescope and AGw Commissioning LFBG with IRTC 01 02 May 2009 MST Observers:: J. Heidt, D.Thompson Telescope Operator: David Gonzalez Huerta Software Support...
Com20090503
Telescope and AGw Commissioning at LFBG with IRTC 02 03 May 2009 MST Observers:: D.Thompson Telescope Operator: David Gonzalez Huerta Software Support: (phone...
Com20090504
Telescope and AGw4 Commissioning at LDG 03 04 May 2009 MST Observers:: J. Hill, J. Storm (mtn), A. Rakich (Tucson) Telescope Operator: David Gonzalez Huerta ...
Com20090505
Telescope and AGw4 Commissioning at LDG 04 05 May 2009 MST Observers:: J. Hill, J. Storm (mtn), A. Rakich (Tucson) Telescope Operator: W. Wack Software Suppo...
Com20090506
Telescope and AGw4 Commissioning at LDG 05 06 May 2009 MST Observers:: J. Hill, J. Storm (mtn), A. Rakich (Tucson) , D, Miller (Firenze) Telescope Operator: W....
Com20090507
Telescope and AGw4 Commissioning at LDG 06 07 May 2009 MST Observers:: J. Hill, J. Storm (mtn), A. Rakich (Tucson) , D, Miller (Firenze) Telescope Operator: W....
Com20090508
Technical Observing at Bent Gregorian with IRTC 07 08 May 2009 MST Observers: J. Hill (mtn) Telescope Operator: W. Wack Software Support: We talked to Tom, Dan...
Com20090509
Technical Observing at Bent Gregorian with IRTC 08 09 May 2009 MST Observers: J. Hill (mtn) Telescope Operator: W. Wack Software Support: Telescope Support: J....
Com20090510
Telescope and AGw4 Commissioning at LDG 09 10 May 2009 MST Observers:: J. Hill (mtn), A. Rakich (Tucson) Telescope Operator: W. Wack Software Support: N. Cush...
Com20090511
Telescope and AGw4 Commissioning at LDG 10 11 May 2009 MST Observers:: J. Hill (mtn), A. Rakich (Tucson) Telescope Operator: W. Wack Software Support: Telesco...
Com20090512
Telescope and AGw4 Commissioning at LDG 11 12 May 2009 MST Observers:: J. Hill (mtn) , A. Rakich (Tucson) Telescope Operator: A. Ceranski Software Support: T...
Com20090513
Telescope and AGw4 Commissioning at LDG 12 13 May 2009 MST Observers:: J. Hill (mtn) , A. Rakich (Tucson) Telescope Operator: A. Ceranski Software Support: C...
Com20090514
Telescope Performance Verification with IRTC/LFBG 13 14 May 2009 MST Observers:: D.Thompson, J.Heidt (mtn) Telescope Operator: A. Ceranski Software Support:...
Com20090515
Telescope Performance Verification with IRTC at LFBG 14 15 May 2009 MST Observers:: D.Thompson, J.Heidt (mtn) Telescope Operator: A. Ceranski Software Suppo...
Com20090516
Telescope Performance Verification with IRTC at LFBG 15 16 May 2009 MST Observers:: D.Thompson, J.Heidt (mtn) Telescope Operator: A. Ceranski Software Suppo...
Com20090517
Telescope Performance Verification with IRTC at LFBG 16 17 May 2009 MST Observers:: D.Thompson, J.Heidt (mtn) Telescope Operator: A. Ceranski Software Suppo...
Com20090518
Telescope Performance Verification with IRTC at LFBG 17 18 May 2009 MST Observers:: D.Thompson, J.Heidt (mtn) Telescope Operator: A. Ceranski Software Suppo...
Com20090519
Telescope Performance Verification with IRTC at LFBG 18 19 May 2009 MST Observers:: D.Thompson, J.Heidt (mtn) Telescope Operator: A. Ceranski Software Suppo...
Com20090520
Telescope Performance Verification with IRTC at LFBG 19 20 May 2009 MST Observers:: D.Thompson, J.Heidt (mtn) Telescope Operator: A. Ceranski Software Suppo...
Com20090521
Telescope Performance Verification with IRTC at LFBG 20 21 May 2009 MST Observers: J. Hill (Tucson) Telescope Operator: D. Gonzalez Huerta Software Support:...
Com20090522
Telescope Performance Verification with IRTC at LFBG 21 22 May 2009 MST Observers: J. Hill (Tucson) Telescope Operator: D. Gonzalez Huerta Software Support:...
Com20090523
Telescope Performance Verification with IRTC at LFBG 22 23 May 2009 MST Observers: J. Hill (Tucson) Telescope Operator: D. Gonzalez Huerta Software Support: ...
Com20090607
Telescope Performance Verification with IRTC at LFBG 06 07 June 2009 MST Observers: DThompson, MPedani (LBT), JHill (Tucson) Telescope Operator: ACeranski Sof...
Com20090608
UT20090608 Telescope Performance Verification with IRTC at LFBG Observers: DThompson, MPedani (LBT) Telescope Operator: ACeranski Software Support: MDeLaPena, T...
r7 - 09 Oct 2009 - 22:34 by NormCushing
Com20090609
Telescope Performance Verification with IRTC at LFBG 08 09 June 2009 MST Observers: DThompson, MPedani (LBT), JHill (Tucson) Telescope Operator: DGonzalezHuer...
Com20090610
UT20090610 Telescope Performance Verification with IRTC at LFBG Observers: DThompson, MPedani (LBT) Telescope Operator: DGonzalez Huerta Software Support: MDe...
Com20090611
UT20090611 Telescope Performance Verification with IRTC at LFBG Observers: DThompson, MPedani (LBT) Telescope Operator: DGonzalez Huerta Software Support: TEd...
Com20090612
UT20090612 Telescope Performance Verification with IRTC at LFBG Observers: DThompson, MPedani (LBT) Telescope Operator: DGonzalez Huerta Software Support: MDe...
Com20090613
UT20090613 Telescope Performance Verification with IRTC at LFBG Observers: DThompson, MPedani (LBT) Telescope Operator: DGonzalez Huerta Software Support" TEd...
Com20090614
UT20090614 Telescope Performance Verification with IRTC at LFBG Observers: DThompson, MPedani (LBT) Telescope Operator: DGonzalez Huerta Software Support: MDe...
Com20090623
UT20090623 Telescope Performance Verification with IRTC at LFBG Observers: J. Hill (LBT) Telescope Operator: A. Ceranski Software Support: T. Leibold, C. Bidd...
Com20090624
UT20090624 Telescope Performance Verification with LUCIFER at LFBG Observers: W. Seifert, N. Ageorges, V. Knierim, J. Hill (LBT) Telescope Operator: A. Ceransk...
Com20090625
UT20090625 Telescope Performance Verification with LUCIFER at LFBG Observers: W. Seifert, N. Ageorges, V. Knierim, J. Hill (LBT) Telescope Operator: A. Ceransk...
Com20090626
UT20090626 Telescope Performance Verification with LUCIFER at LFBG Observers: W. Seifert, N. Ageorges, V. Knierim, J. Hill (LBT) Telescope Operator: A. Ceransk...
Com20090627
UT20090627 Telescope Performance Verification with LUCIFER at LFBG Observers: W. Seifert, N. Ageorges, V. Knierim, J. Hill (LBT) Telescope Operator: A. Ceransk...
Com20090628
UT20090628 Telescope Performance Verification with LUCIFER at LFBG Observers: W. Seifert, N. Ageorges, V. Knierim, J. Hill (LBT) Telescope Operator: A. Ceransk...
Com20090629
UT20090629 Telescope Performance Verification with LUCIFER at LFBG Observers: W. Seifert, N. Ageorges, V. Knierim, J. Hill (LBT) Telescope Operator: A. Ceransk...
r4 - 30 Jun 2009 - 02:14 by TonyEdgin
Com20090630
UT20090630 Telescope Performance Verification with LUCIFER at LFBG Observers: W. Seifert, N. Ageorges, V. Knierim (LBT) Telescope Operator: D. Gonzalez Huerta ...
Com20090701
UT20090701 LUCIFER Commissioning Observers: WSeifert, NAgeorges (LBT), DThompson (Tucson) Telescope Operator: D Gonzalez Huerta Software Support: Instrumen...
Com20090702
UT20090702 LUCIFER Commissioning Observers: WSeifert, NAgeorges (LBT), DThompson (Tucson) Telescope Operator: D Gonzalez Huerta Software Support: Instrumen...
Com20090703
UT20090703 LUCIFER Commissioning Observers: WSeifert, NAgeorges (LBT), DThompson (Tucson) Telescope Operator: D Gonzalez Huerta Software Support: Instrumen...
Com20090704
UT20090704 LUCIFER Commissioning Observers: WSeifert, NAgeorges (LBT), DThompson (Tucson) Telescope Operator: D Gonzalez Huerta Software Support: Instrumen...
Com20090705
UT20090705 LUCIFER Commissioning Observers: WSeifert, NAgeorges (LBT), DThompson (Tucson) Telescope Operator: D Gonzalez Huerta Software Support: CBiddick (T...
Com20090706
UT20090706 LUCIFER Commissioning Observers: WSeifert, NAgeorges (LBT), DThompson (Tucson) Telescope Operator: D Gonzalez Huerta Software Support: CBiddick I...
Com20090707
UT20090707 LUCIFER Commissioning Observers: WSeifert, NAgeorges (LBT) Telescope Operator: D Gonzalez Huerta Software Support: Instrument Support: Telescop...
Com20090901
Bent Gregorian Technical Observing Plan: 31 Aug 2009 Observer: Dave T (from Tucson) SW support: Torsten, Michele, Chris, Paul AGw support: Jesper (from Potsdam)...
Com20090906
Bent Gregorian Technical Observing : 06 September 2009 UT Observer: J. Hill (mtn) Telescope Operator: D. Gonzalez Huerta Telescope Support: J. Rousseau SW suppor...
Com20090907
Bent Gregorian Technical Observing : 07 September 2009 UT Observer: J. Hill (mtn) Telescope Operator: D. Gonzalez Huerta SW support: N. Cushing, M. Delapena, C. ...
Com20090908
Bent Gregorian Technical Observing : 08 September 2009 UT Observer: J. Hill (mtn), D. Miller (Tucson) Telescope Operator: W. Wack SW support: N. Cushing Summary...
Com20090909
Bent Gregorian Technical Observing : 09 September 2009 UT Observer: D. Miller (Tucson) Telescope Operator: W. Wack SW support: Summary First 3/4 of the night l...
Com20090910
Bent Gregorian Technical Observing : 10 September 2009 UT Observer: D. Miller, J. Hill (Tucson) Telescope Operator: W. Wack SW support: N. Cushing Summary We op...
Com20090923
Bent Gregorian Technical Observing with IRTC: UT 2009 September 23 Observer: D.Thompson, MPedani (@LBT), DMiller (Tucson) Telescope Operator: David Gonzalez Huer...
Com20090924
Bent Gregorian Technical Observing with LUCIFER: UT 2009 September 24 Observer: DThompson, MPedani, NAgeorges, MJuette, WSeifert (@LBT), DMiller (Tucson) Teles...
Com20091006
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 07 Observer: JHill (LBTO), DMiller (Tucson) Telescope Operator: Aaron Ceranski SW support: (T...
Com20091007
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 07 Observer: JHill (Tucson), DMiller (LBTO) Telescope Operator: Aaron Ceranski SW support: TL...
Com20091008
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 08 Observer: JHill (Tucson), DMiller (LBTO) Telescope Operator: Aaron Ceranski SW support: TL...
Com20091009
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 09 Observer: JHill (Tucson), DMiller (LBTO) Telescope Operator: Aaron Ceranski SW support: TL...
Com20091010
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 10 Observer: JHill(LBTO), DMiller (Tucson) Telescope Operator: Aaron Ceranski Instrument Supp...
Com20091011
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 11 Observer: JHill (LBTO), DMiller (Tucson) Telescope Operator: Aaron Ceranski Instrument Sup...
Com20091012
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 12 Observer: JHill (LBTO), DMiller (Tucson), JEsguerra (LBTO) plus JStorm(Potsdam) Telescope ...
Com20091025
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 25 Observer: JHill (LBTO), DMiller (Tucson), plus JStorm (Potsdam) Telescope Operator: WWack ...
Com20091026
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 26 Observer: JHill (LBTO), DMiller (Tucson), JEsguerra (LBTO) plus JStorm (Potsdam) Telescope...
Com20091027
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 27 Observer: JHill (LBTO), DMiller (Tucson), JEsguerra (LBTO) Telescope Operator: ACeranski I...
Com20091028
Left Direct Gregorian Technical Observing with IRTC: UT 2009 October 28 Observer: JHill (LBTO) Telescope Operator: ACeranski Instrument Support: Telescope Suppor...
Com20091029
Bent Gregorian Technical Observing with LUCIFER: UT 2009 October 29 Observer: DThompson (@LBT) Telescope Operator: ACeranski SW support: CBiddick (on call) Su...
Com20091030
Bent Gregorian Technical Observing with LUCIFER: UT 2009 October 30 Observer: DThompson (@LBT) Telescope Operator: ACeranski SW support: CBiddick (on call) Su...
Com200910AGw
Discussion of AGw Transformation Problem of October 2009 Description of the problem On 9 October 2009 a data set of...error found in 20091012 data file. Hold on....
Com200910Plan
Observing Plan for October 2009 Commissioning Checks before start of commissioning * Hardware installation (Joar) * AGw#4 * IRTC * TCS Buil...
Com200910Plan2
Observing Plan for October 25 28, 2009 Commissioning Checks before start of commissioning * New TCS Build? No! * New oacontrol server (Jesper Thomas) ...
Com20091125
Left Direct Gregorian Technical Observing with IRTC: UT 2009 November 25 Observer: JHill (LBTO) Telescope Operator: ACeranski Instrument Support: Telescope Suppo...
Com20091126
Left Direct Gregorian Technical Observing with IRTC: UT 2009 November 26 Observer: JHill (LBTO) Telescope Operator: ACeranski Instrument Support: Telescope Suppo...
Com20091127
Left Direct Gregorian Technical Observing with IRTC: UT 2009 November 27 Observer: JHill (LBTO) Telescope Operator: ACeranski Instrument Support: Telescope Suppo...
Com20091128
Bent Gregorian Technical Observing with LUCIFER/AGw: UT 2009 November 28 Observer: DThompson (@LBT) Telescope Operator: SW support: Summary Preparations D...
Com20091129
Bent Gregorian Technical Observing with LUCIFER/AGw: UT 2009 November 29 Observer: DThompson (@LBT) Telescope Operator: A.Ceranski SW support: on call LUCIFER...
Com20091205
Bent Gregorian Technical Observing with LUCIFER/AGw: UT 2009 December 05 Observer: DThompson (@LBT), JHill (Tucson, first half) Telescope Operator: ACeranski S...
Com20091227
Left Direct Gregorian Technical Observing with IRTC: UT 2009 December 27 Observer: JHill (LBTO), DMiller (Tucson) Telescope Operator: DHuerta Instrument Support: ...
Com20091228
Left Direct Gregorian Technical Observing with IRTC: UT 2009 December 28 Observer: JHill (LBTO), DMiller (Tucson) Telescope Operator: DHuerta Instrument Support: ...
Com20091229
Left Direct Gregorian Technical Observing with IRTC: UT 2009 December 29 Observer: JHill (LBTO), DMiller (Tucson) Telescope Operator: WWack Instrument Support: DO...
Com20091230
Left Direct Gregorian Technical Observing with IRTC: UT 2009 December 30 Observer: JHill (LBTO), DMiller (Tucson) Telescope Operator: WWack Instrument Support: DO...
Com20091231
Left Direct Gregorian Technical Observing with IRTC: UT 2009 December 31 Observer: JHill (LBTO), DMiller (Tucson) Telescope Operator: WWack Instrument Support: DO...
Com20100101
Left Direct Gregorian Technical Observing with IRTC: UT 2010 January 01Happy New Year! Observer: JHill (LBTO), DMiller (Tucson) Telescope Operator: WWack Instrume...
Com20100102
### Notes for LUCIFER tech obs: restest updatePointingReference functionality, notify LUCIFER Team of results. test guiding rms with application of the guide...
Com20100103
LUCIFER Technical Observing, prep for Partner Science: UT 2010 January 03 Observer: DThompson, MPedani (LBTO) Telescope Operator: WWack Instrument Support: DOffic...
Com20100104
LUCIFER Technical Observing, prep for Partner Science: UT 2010 January 04 Observer: DThompson, MPedani (LBTO) Telescope Operator: WWack Instrument Support: DOffic...
Com20100127
Left Front Bent Gregorian Technical Observing with IRTC: UT 2010 January 27 Observer: DMiller (LBTO) Telescope Operator: JHill Instrument Support: DOfficer Telesc...
Com20100128
Left Direct Gregorian Technical Observing with IRTC: UT 2010 January 28 Observer: JHill (Tucson), DMiller (Tucson) Telescope Operator: Instrument Support: Teles...
Com20100129
Left Direct Gregorian Technical Observing with IRTC: UT 2010 January 29 Observer: JHill (Tucson), DMiller (Tucson) Telescope Operator: Instrument Support: Teles...
Com20100131
LBC LUCIFER Technical Observing, prep for Partner Science: UT 2010 January 31 Observer: DThompson (LBTO), OKuhn, ARakich (Tucson) Telescope Operator: WWack Instru...
Com201001Plan
Observing Plan for January 28 29, 2010 LDG Commissioning Checks before start of commissioning * New TCS Build? Items to Check? * oacontrol server ready...
Com20100201
LUCIFER Technical Observing, prep for Partner Science: UT 2010 February 01 Observer: DThompson (LBTO) Telescope Operator: WWack Instrument Support: JMorris, NAge...
Com20100302
Left Direct Gregorian Technical Observing with IRTC: UT 2010 March 02 Observer: DMiller JHill (Tucson) Telescope Operator: WWack Instrument Support: Telescope Su...
Com20100303
Left Direct Gregorian Technical Observing with IRTC: UT 2010 March 03 Observer: DMiller JHill (Tucson) Telescope Operator: WWack Instrument Support: Telescope Su...
Com20100304
Left Front Bent Gregorian Technical Observing with AGW3: UT 2010 March 04 Observer: DMiller JHill (Tucson) Telescope Operator: WWack Instrument Support: Telescop...
Com20100307
LUCIFER Technical Observing, prep for Partner Science: UT 2010 Mar 07 Observer: D.Thompson, M.Pedani Telescope Operator: W.Wack Instrument Support: D.Officer T...
Com20100308
LUCIFER Technical Observing, prep for Partner Science: UT 2010 Mar 08 Observer: D.Thompson Telescope Operator: W.Wack Instrument Support: D.Officer SW support:...
Com20100320
RFBG Commissioning with Adaptive Secondary 20 March 2010 UT Night 1: Testing TCS Build AO3 Observer: JHill, JStorm (LBTO) Telescope Operator: WWack Software: N...
Com20100321
RFBG Commissioning with Adaptive Secondary 21 March 2010 UT Night 2: Working on the Shell Shape and Active Optics Observer: JHill, JStorm (LBTO) plus ARakich, ...
Com20100322
RFBG Commissioning with Adaptive Secondary 22 March 2010 UT Night 3: Working on the Shell Shape, Collimation and Transformations Observer: JHill, JStorm (LBTO)...
Com20100323
RFBG Commissioning with Adaptive Secondary 23 March 2010 UT Night 4: Investigating Z6 versus Elevation Observer: JHill, JStorm (LBTO) Telescope Operator: DHue...
Com20100324
RFBG Commissioning with Adaptive Secondary 24 March 2010 UT Night 5: Snow Observer: JHill, JStorm, DMiller (LBTO) Telescope Operator: DHuerta Software: Instr...
Com20100325
RFBG Commissioning with Adaptive Secondary 25 March 2010 UT Night 6: Observer: DMiller, JHeidt, JHill, JStorm (LBTO) Telescope Operator: DHuerta Software: Ins...
Com20100326
RFBG Commissioning with Adaptive Secondary 26 March 2010 UT Night 7: Observer: DMiller, JHeidt, FBian (LBTO) Telescope Operator: DHuerta Software: Instrument ...
Com20100327
RFBG Commissioning with Adaptive Secondary 27 March 2010 UT Night 8: Observer: DMiller, JHeidt, FBian (LBTO) Telescope Operator: DHuerta Software: Instrument ...
Com20100328
RFBG Commissioning with Adaptive Secondary 28 March 2010 UT Night 9: Observer: JHeidt, FBian (LBTO) Telescope Operator: DHuerta Software: TEdgin Instrument Sup...
Com20100329
RFBG Commissioning with Adaptive Secondary 29 March 2010 UT Night 10: Observer: JHeidt, FBian (LBTO) Telescope Operator: DHuerta Software: TEdgin Instrument Su...
Com20100330
RFBG Commissioning with Adaptive Secondary 30 March 2010 UT Night 11: Observer: JHeidt, JHill (LBTO) Telescope Operator: WWack Software: TEdgin Instrument Supp...
Com20100331
RFBG Commissioning with Adaptive Secondary 31 March 2010 UT Night 12: Observers: JHeidt, JHill (LBTO) Telescope Operator: JHill (until 9:30) then WWack Softwar...
Com201003AOPlan
Right Front Bent Gregorian Focal Station Commissioning Plan with Adaptive Secondary Prerequisites * Initial guess at pointing model will use same as IRTC ...
Com201003Plan
Observing Plan for March 2 4, 2010 UT LDG Commissioning Checks before start of commissioning * TCS Builds * BP1 build ready? * AO2 test in p...
Com20100401
RFBG Commissioning with Adaptive Secondary 01 April 2010 UT Night 13: Observer: JHill (LBTO) Telescope Operator: WWack (until 03:00 UT) then JHill Software: TE...
Com20100403
RFBG Commissioning with Adaptive Secondary 03 April 2010 UT Night 15: Observer: JHill, DMiller (Tucson) Telescope Operator: JHill (Tucson) Telescope Support: J...
Com20100404
RFBG Commissioning with Adaptive Secondary 04 April 2010 UT Night 16: Observer: JHill, DMiller, FBian(Tucson) Telescope Operator: JHill, DMiller (Tucson) Teles...
Com20100405
RFBG Commissioning with Adaptive Secondary 05 April 2010 UT Night 17: Observer: DMiller FBian JHill (Tucson) Telescope Operator: JHill (Tucson) Telescope Suppo...
Com20100406
RFBG Commissioning with Adaptive Secondary 06 April 2010 UT Night 18: Observer: DMiller JHill (Tucson) Telescope Operator: JHill (Tucson) Telescope Support: MM...
Com20100419
LDG Commissioning: Performance Verification 19 April 2010 UT Night 1: Observer: DMiller (Tucson) Telescope Operator: JHill (LBTO) Telescope Support: MMidkiff I...
Com20100420
LDG Commissioning: Performance Verification 20 April 2010 UT Night 2: Observer: DMiller (Tucson) JHill (LBTO) Telescope Operator: JHill (LBTO) Telescope Suppor...
Com20100421
TCS Testing LDG Commissioning: Performance Verification 21 April 2010 UT Night 3: Observer: DMiller (Tucson) JHill (LBTO) Telescope Operator: JHill (LBTO) Te...
Com20100422
TCS Testing LDG Commissioning: Performance Verification 22 April 2010 UT Night 4: Observer: DMiller (Tucson) JHill (LBTO) Telescope Operator: JHill (LBTO) Te...
Com20100423
TCS Testing LDG Commissioning: Performance Verification 23 April 2010 UT Night 5: Observer: DMiller (Tucson) JHill (LBTO) Telescope Operator: JHill (LBTO) Te...
Com20100424
LDG Commissioning: Performance Verification 24 April 2010 UT Night 6: Observer: JHeidt (LBTO), PHibon (LBTO), JHill (LBTO) Telescope Operator: JHill (LBTO) Tel...
Com20100425
LDG Commissioning: Performance Verification 25 April 2010 UT Night 7: Observer: JHeidt (LBTO), PHibon (LBTO), JHill (LBTO), DMiller (Tucson) Telescope Operator...
Com20100426
LDG Commissioning: Performance Verification 26 April 2010 UT Night 8: Observer: JHeidt (LBTO), PHibon (LBTO), JHill (LBTO), DMiller (Tucson) Telescope Operator...
Com20100427
RFBG Commissioning with Adaptive Secondary 27 April 2010 UT Night 19: Observer: JHeidt (LBTO), PHibon (LBTO), DMiller (Tucson) Telescope Operator: SAllansen (L...
Com20100428
RFBG Commissioning with Adaptive Secondary 28 April 2010 UT Night 20: Observer: JHeidt (LBTO), PHibon (LBTO), DMiller (Tucson) Telescope Operator: SAllansen (L...
Com20100429
AO Commissioning: 29 April 2010 UT Observer: SEsposito (Arcetri), JHill (Tucson) Telescope Operator: SAllanson, DHuerta (LBTO) Telescope Support: JUrban (LBTO) I...
Com201004LDGPlan
LDG Commissioning: April 25 26, 2010 UT Performance Verification Plan General Description There are three types of data set that need to be collected, which ar...
Com201004LDGResults
Left Direct Gregorian Performance Verification * Data were collected on April 25th and 26th, 2010 by JHeidt, PHibbon and DMiller * Date were analyzed by KRu...
Com20100505
LBC Tech Chip IA Commissioning 05 May 2010 UT Night 1: Observer: M.Pedani (LBTO), R.Speziali (LBTO), R.Baruffolo(LBTO) Telescope Operator: SAllansen (LBTO), ...
Com20100519
Commissioning: 19 May 2010 UT Observer: Andrew, Dave T Telescope Operator: SAllanson, WWack (in Tucson) Telescope Support: Brian (LBTO) Instrument Support: TShih ...
Com20100520
Commissioning: 20 May 2010 UT Observer: Andrew (in Tucson), Dave T, Olga K (in Tucson) Telescope Operator: SAllanson, WWack (in Tucson) Telescope Support: Brian (...
NEW - 20 May 2010 - 10:38 by AndrewRakich
Com20100521
Commissioning: 21 May 2010 UT Observer: Andrew R, John H, Doug M Olga K (in Tucson) Telescope Operator: SAllanson, WWack (in Tucson) Telescope Support: Brian (LBT...
Com20100522
Commissioning: 22 May 2010 UT Observer: John H, Doug M, Kate R (in Tucson) Telescope Operator: SAllanson, WWack (in Tucson) Telescope Support: Brian (LBTO) Instru...
Com20100523
Commissioning: 23 May 2010 UT Observer: John H, Doug M, Kate R (in Tucson) Telescope Operator: SAllanson, WWack (in Tucson) Telescope Support: Brian (LBTO) Instru...
Com20100524
Commissioning: 24 May 2010 UT Observer: John H, Doug M, Kate R (in Tucson) Telescope Operator: SAllanson, WWack (in Tucson) Telescope Support: Brian (LBTO) Instru...
Com20100627
Commissioning: 27 June 2010 UT Observer: Pascale H, Kate R, Dave T (LBTO) Telescope Operator: Dave GH (LBTO) Telescope Support: (LBTO) Instrument Support: John ...
r3 - 28 Jun 2010 - 01:18 by PascaleHibon
Com20100628
Commissioning: 28 June 2010 UT Observer: Pascale H, Kate R, Dave T (LBTO) Telescope Operator: Dave H (LBTO) Telescope Support: (LBTO) Instrument Support: John M...
r4 - 28 Jun 2010 - 11:41 by PascaleHibon
Com20100629
Commissioning: 29 June 2010 UT Observer: Pascale H, Kate R, Dave T (LBTO) Telescope Operator: David G (LBTO) Telescope Support: (LBTO) Instrument Support: Tim S...
r7 - 02 Jul 2010 - 11:11 by PascaleHibon
Com20100630
Commissioning: 30 June 2010 UT Observer: Pascale H, Kate R, Dave T (LBTO) Telescope Operator: Steve A (LBTO) Telescope Support: (LBTO) Instrument Support: Tim S...
r3 - 30 Jun 2010 - 11:20 by PascaleHibon
Com201006RFBGPlan
RFBG Commissioning: June 27 July 5, 2010 UT Performance Verification Plan General Description There are three outstanding issues with operation of the RFBG f...
Com20100701
Commissioning: 1 July 2010 UT Observer: Pascale H, Kate R, Dave T (LBTO) Telescope Operator: Steve A (LBTO) Telescope Support: (LBTO) Instrument Support: Tim S ...
Com20100702
Commissioning: 2 July 2010 UT Observer: Pascale H, Kate R (LBTO) Telescope Operator: Steve A (LBTO) Telescope Support: (LBTO) Instrument Support: Tim S (LBTO) A...
Com20100703
Commissioning: 3 July 2010 UT Night Lost due to weather conditions. Observer: Pascale H (LBTO) Doug M (Tucson) Telescope Operator: Steve A (LBTO) Telescope Suppo...
r4 - 03 Jul 2010 - 11:21 by KatherineRueff
Com20100704
Commissioning: 4 July 2010 UT Observer: Pascale H (LBTO), SW Group (Tucson), Doug M (Tucson) Telescope Operator: Steve A (LBTO) Telescope Support: (LBTO) Instrum...
Com20100705
Commissioning: 5 July 2010 UT Observer: Pascale H (LBTO) Doug M (Tucson) Telescope Operator: Steve A (LBTO) Telescope Support: (LBTO) Instrument Support: Tim S ...
r6 - 05 Jul 2010 - 12:12 by PascaleHibon
Com20100706
Commissioning: 6 July 2010 UT Observer: Pascale H (LBTO) SW Group, Doug M (Tucson) Telescope Operator: Steve A (LBTO) Telescope Support: (LBTO) Instrument Suppo...
r4 - 06 Jul 2010 - 12:15 by PascaleHibon
Com20100914
LFBG Re Commissioning with LUCI: 14 September 2010 UT Observer: DThompson, JHill (LBTO) plus some DMiller (home) plus some JStorm (Potsdam) Telescope Operator: DG...
Com20100915
LFBG Re Commissioning with LUCI: 15 September 2010 UT Observer: DThompson, JHill (LBTO) Telescope Operator: SAllanson and GBechetti (LBTO) Telescope Support: JUrb...
Com20100916
LFBG Re Commissioning with LUCI: 16 September 2010 UT Observer: DThompson, JHill (LBTO) Telescope Operator: SAllanson and GBechetti (LBTO) Telescope Support: JUrb...
Com20100921
LFBG Re Commissioning with LUCI: 21 September 2010 UT Observer: DThompson, ARakich, DMiller (Tucson), JHill (LBTO) Telescope Operator: SAllanson and GBechetti (LB...
Com20100922
RFBG Re Commissioning with AGW2: 22 September 2010 UT Observer: JHill (LBTO) Telescope Operator: DHuerta (LBTO) Telescope Support: JLittle (LBTO) Instrument Suppo...
Com20100923
MODS1 AGw Commissioning at LDG: 23 September 2010 UT Observer: J. Hill (LBTO), R. Pogge (OSU), R. Stoll (OSU), M. Pedani (LBTO), B. Atwood (OSU) Telescope Operato...
Com20100924
MODS1 AGw Commissioning at LDG: 24 September 2010 UT Observer: J. Hill (LBTO), R. Pogge (OSU), R. Stoll (OSU), M. Pedani (LBTO), B. Atwood (OSU) Telescope Operato...
Com20100925
MODS1 AGw Commissioning at LDG: 25 September 2010 UT Observers: J. Hill (LBTO), R. Pogge (OSU), R. Stoll (OSU), M. Pedani (LBTO), B. Atwood (OSU) M. Wagner (LBTO)...
Com20100926
MODS1 AGw Commissioning at LDG: 26 September 2010 UTC Observers: J. Hill (LBTO), R. Pogge (OSU), R. Stoll (OSU), M. Pedani (LBTO) Telescope Operator: DHuerta (LBT...
Com20100927
MODS1 AGw Commissioning at LDG: 27 September 2010 UTC Observers: R. Pogge (OSU), R. Stoll (OSU), M. Pedani (LBTO) Telescope Operator: DHuerta (LBTO) Software: Sup...
Com20100928
MODS1 AGw Commissioning at LDG: 28 September 2010 UTC Observers: R. Pogge (OSU), R. Stoll (OSU) Telescope Operator: DHuerta (LBTO) AO Support: D. Miller (LBTO) Te...
Com201009LFBGPlan
Left Front Bent Gregorian Focal Station Re Commissioning Plan Prerequisites * Day time re commissioning of AGW3. Able to position AGw on axis, wfs apert. co...
Com201009MODSplan
Left Direct Gregorian Focal Station Re Commissioning with MODS1 Plan Prerequisites * MODS1 installed on telescope @ LDG (done) * Update hotspot coordinates...
Com20101015
Arizona LBTI Commissioning 15 October 2010 UT This wiki page includes John's notes on the center bent Gregorian focal station commissioning aspects of LBTI Com...
Com20101016
Arizona LBTI Commissioning 16 October 2010 UT This wiki page includes John's notes on the center bent Gregorian focal station commissioning aspects of LBTI Com...
Com20101017
Arizona LBTI Commissioning 17 October 2010 UT This wiki page includes John's notes on the center bent Gregorian focal station commissioning aspects of LBTI Com...
Com20101018
RFBG Re Commissioning with AGW2: 18 October 2010 UT Observer: JHill (LBTO) Telescope Operator: SAllanson, GBechetti (LBTO) Telescope Support: MMidkiff (LBTO) Inst...
Com20101019
Binocular TCS Testing with BP4: 19 October 2010 UT Observer: JHill (LBTO) CBiddick, MDelapena (Tucson) Telescope Operator: SAllanson, GBechetti (LBTO) Telescope S...
Com20101020
RFBG Checkout with AO5 Build: 20 October 2010 UT Observer: DMiller, SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: DHuerta, GBechetti (LBTO) ...
Com20101021
AO Retroreflector Work: 21 October 2010 UT Observer: DMiller, SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: DHuerta, GBechetti (LBTO) Telesc...
Com20101022
AO Retroreflector Work: 22 October 2010 UT Observer: DMiller, SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: DHuerta (LBTO) Telescope Support...
Com20101023
AO Retroreflector Work: 23 October 2010 UT Observer: DMiller, SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: DHuerta (LBTO) Telescope Support...
Com20101024
Ready for Observing: 24 October 2010 UT Observer: DMiller, SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: DHuerta (LBTO) Telescope Support: M...
Com20101025
AO Com Work: 25 October 2010 UT Observer: DMiller, SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: DHuerta (LBTO) Telescope Support: MMidkiff ...
Com20101026
AO Com Work: 26 October 2010 UT Observer: DMiller, SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: DHuerta (LBTO) Telescope Support: JUrban (L...
Com20101027
AO Com Work: 27 October 2010 UT Observer: DMiller SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: SAllanson (LBTO) Telescope Support: MMidkiff...
Com20101028
AO Com Work: 28 October 2010 UT Observer: DMiller SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: SAllanson (LBTO) Telescope Support: MMidkiff...
Com20101029
AO Com Work: 29 October 2010 UT Observer: DMiller SEsposito, MXompero, LBusoni, APuglisi, FQuiros Telescope Operator: SAllanson (LBTO) Telescope Support: JLittle ...
Com20101106
Arizona LBTI Commissioning 06 November 2010 UT This wiki page includes John's notes on the center bent Gregorian focal station commissioning aspects of LBTI Co...
Com20101107
Arizona LBTI Commissioning 07 November 2010 UT This wiki page includes John's notes on the center bent Gregorian focal station commissioning aspects of LBTI Co...
Com20101114
MODS1 AGw Commissioning at LDG: 14 November 2010 UTC Observer(s): R. Pogge (OSU), M. Pedani (LBTO) Telescope Operator: S. Allanson (LBTO) Telescope Support: M. Mi...
Com20101115
MODS1 AGw Commissioning at LDG: 15 November 2010 UTC Observer(s): R. Pogge (OSU) and M. Pedani (LBTO) Telescope Operator: S. Allanson (LBTO) AO Support: T. Leibol...
Com20101116
MODS1 AGw Commissioning at LDG: 16 November 2010 UTC Observer(s): R. Pogge and B. Shappee (OSU), J.Hill and M.Pedani (LBTO) Telescope Operator: S. Allanson (LBTO...
Com20101117
MODS1 AGw Commissioning at LDG: 17 November 2010 UTC Observer(s): R. Pogge and B. Shappee (OSU), M. Pedani and M. Wagner (LBTO) Telescope Operator: G. Bechetti (L...
Com20101118
MODS1 AGw Commissioning at LDG: 18 November 2010 UTC Observer(s): R. Pogge and B. Shappee (OSU), M. Pedani and M. Wagner (LBTO) Telescope Operator: G. Bechetti (L...
Com20101119
MODS1 AGw Commissioning at LDG: 19 November 2010 UTC Observer(s): R. Pogge and B. Shappee (OSU), M. Pedani and M. Wagner (LBTO) Telescope Operator: G. Bechetti (L...
Com20101120
MODS1 AGw Commissioning at LDG: 20 November 2010 UTC Observer(s): R. Pogge and B. Shappee (OSU), M. Thompson (LBTO) Telescope Operator: G. Bechetti (LBTO) AO Supp...
Com20101121
MODS1 AGw Commissioning at LDG: 21 November 2010 UTC Observer(s): R. Pogge and B. Shappee (OSU), D. Thompson (LBTO) Telescope Operator: G. Bechetti (LBTO) AO Supp...
Com20101122
AO Commissioning at RFBG: 22 November 2010 UTC Observer(s): SEsposito, APuglisi, LBusoni, EPinna, DMiller, GBrusa (LBTO) Telescope Operator: G. Bechetti (LBTO), D...
Com20101123
AO Commissioning at RFBG: 23 November 2010 UTC Observer(s): SEsposito, APuglisi, LBusoni, EPinna, DMiller, GBrusa (LBTO) Telescope Operator: G. Bechetti (LBTO), D...
Com20101124
AO Commissioning at RFBG: 24 November 2010 UTC Observer(s): SEsposito, APuglisi, LBusoni, EPinna, DMiller, GBrusa (LBTO) Telescope Operator: DHuerta (LBTO) SW Sup...
Com20101125
AO Commissioning at RFBG: 25 November 2010 UTC Observer(s): SEsposito, APuglisi, LBusoni, EPinna, DMiller, GBrusa (LBTO) Telescope Operator: DHuerta (LBTO) SW Sup...
Com20101126
AO Commissioning at RFBG: 26 November 2010 UTC Observer(s): SEsposito, APuglisi, LBusoni, EPinna, DMiller, GBrusa (LBTO) Telescope Operator: DHuerta (LBTO) SW Sup...
Com20101127
AO Commissioning at RFBG: 27 November 2010 UTC Observer(s): SEsposito, APuglisi, LBusoni, EPinna, DMiller, GBrusa (LBTO) Visitors(s): RGreen, JBrynnel (LBTO) Tele...
Com20101215
Range Balancing LBC: 27 November 2010 UTC Observer(s): John Hill, Andrew Rakich (Tucson) Visitors(s): Telescope Operator: DHuerta (LBTO) SW Support: Chris Biddic...
Com20101216
MODS1 Commissioning Run 3: UTC 2010 December 16 Observer(s): R. Pogge and C. Henderson (OSU), M. Wagner (LBTO) Telescope Operator: D. Gonzalez (LBTO) Telescope Su...
Com20101217
MODS1 Commissioning Run 3: UTC 2010 December 17 Observer(s): R. Pogge and C. Henderson (OSU) Telescope Operator: D. Gonzalez (LBTO) Telescope Support: J. Urban (L...
Com20101218
MODS1 Commissioning Run 3: UTC 2010 December 18 Observer(s): R. Pogge and C. Henderson (OSU), M. Pedani (LBTO) Telescope Operator: D. Gonzalez (LBTO) Telescope S...
Com20101219
MODS1 Commissioning Run 3: UTC 2010 December 19 Observer(s): R. Pogge and C. Henderson (OSU), M. Pedani (LBTO) Telescope Operator: D. Gonzalez (LBTO) Telescope S...
Com20101220
RFBG Commissioning: UTC 2010 December 20 Observer(s): D. Miller Telescope Operator: D. Gonzalez (LBTO) Telescope Support: M. Midkiff (LBTO) Instrument Support: J...
r10 - 22 Dec 2010 - 20:58 by RichardGreen
Com20101221
RFBG Performance Verification: 21 December 2010 UTC Observer(s): DMiller (LBTO) Telescope Operator: DHuerta (LBTO) SW Support: (Tucson) Telescope Support: MMidkif...
Com20101222
RFBG Performance Verification: 22 December 2010 UTC Observer(s): DMiller (LBTO) Telescope Operator: SAllanson (LBTO) SW Support: (Tucson) Telescope Support: MMidk...
Com20101223
RFBG Performance Verification: 23 December 2010 UTC Observer(s): DMiller (Tucson) Telescope Operator: SAllanson (LBTO) SW Support: (Tucson) Telescope Support: MMi...
Com20101224
RFBG Performance Verification: 24 December 2010 UTC Observer(s): DMiller (Tucson) Telescope Operator: SAllanson (LBTO) SW Support: (Tucson) Telescope Support: MMi...
Com20101226
RFBG Performance Verification: 26 December 2010 UTC Observer(s): RGreen(LBTO) DMiller, ARakich (Tucson) Telescope Operator: DHuerta (LBTO) SW Support: (Tucson) Te...
Com20101227
RFBG Performance Verification: 27 December 2010 UTC Observer(s): RGreen, DMiller (LBTO) Telescope Operator: DHuerta (LBTO) SW Support: (Tucson) Telescope Support:...
r9 - 28 Dec 2010 - 11:26 by RichardGreen
Com20101228
RFBG Performance Verification: 28 December, 2010 UTC Observer(s): RGreen, DMiller (LBTO) Telescope Operator: DHuerta (LBTO) SW Support: (Tucson) Telescope Suppor...
r2 - 28 Dec 2010 - 11:34 by RichardGreen
Com201012RFBGPlan
RFBG Commissioning: December 21 24, 2010 UT Performance Verification Plan General Description There are three outstanding issues with operation of the RFBG foc...
Com20110112
MODS1 Commissioning Run 4: UTC 2011 January 12 Observer(s): R. Pogge (OSU), M. Pedani (LBTO) Telescope Operator: S. Allanson (LBTO) AO Support: Remote from Tuc...
Com20110113
MODS1 Commissioning Run 4: UTC 2011 January 13 Observer(s): R. Pogge (OSU), M. Pedani (LBTO) Telescope Operator: S. Allanson (LBTO) AO Support: D. Miller (LBTO),...
Com20110114
MODS1 Commissioning Run 4: UTC 2011 January 14 18 Observer(s): R. Pogge (OSU) Telescope Operator: S. Allanson (LBTO) Telescope Support: J. Little (LBTO) Instrumen...
Com20110120
AO Commissioning at RFBG: 20 26 December 2011 UTC Observer(s): SEsposito, F, LBusoni, EPinna, DMiller, GBrusa, JC (LBTO) Telescope Operator: Geno (LBTO) SW Suppor...
Com20110127
Range Balancing: 27 January 2011 UTC Observer(s): Dave Thompson, Olga Kuhn, Andrew Rakich(LBTO) Telescope Operator: DHuerta (LBTO) SW Support: (Tucson) Telescope ...
r2 - 27 Jan 2011 - 08:19 by AndrewRakich
Com20110212
Range Balancing: 12 February 2011 UTC Observer(s): John Hill, Andrew Rakich(Tucson) Telescope Operator: Geno Bechetti (LBTO) SW Support: (Tucson) Telescope Suppor...
Com20110213
Range Balancing: 13 February 2011 UTC Observer(s): John Hill, Andrew Rakich(Tucson), Doug Miller (home) Telescope Operator: Geno Bechetti (LBTO) SW Support: (Tucs...
Com20110214
MODS1 Commissioning Run 5: UTC 2011 February 14 Observer(s): R. Pogge J. Antognini (OSU), M. Pedani (LBTO) Telescope Operator: G. Bechetti (LBTO) AO Support:...
Com20110215
MODS1 Commissioning Run 5: UTC 2011 February 15 Observer(s): R. Pogge J. Antognini (OSU), M. Pedani (LBTO) Telescope Operator: G. Bechetti (LBTO) AO Support: A...
Com20110216
MODS1 Commissioning Run 5: UTC 2011 February 16 Observer(s): R. Pogge J. Antognini (OSU), M. Pedani (LBTO) Telescope Operator: D. Gonzalez Huerta (LBTO) AO Sup...
Com20110217
MODS1 Commissioning Run 5: UTC 2011 February 17 Observer(s): R. Pogge J. Antognini (OSU), M. Pedani (LBTO) Telescope Operator: D. Gonzalez Huerta (LBTO) AO Sup...
Com20110218
MODS1 Commissioning Run 5: UTC 2011 February 18 Observer(s): R. Pogge J. Antognini (OSU), M. Pedani (LBTO) Telescope Operator: D. Gonzalez Huerta (LBTO) AO Sup...
Com20110219
MODS1 Commissioning Run 5: UTC 2011 February 19 Observer(s): R. Pogge, J. Antognini, P. Martini (OSU) Telescope Operator: D. Gonzalez Huerta (LBTO) AO Support: ...
Com20110220
MODS1 Commissioning Run 5: UTC 2011 February 20 Observer(s): R. Pogge, J. Antognini, P. Martini (OSU) Telescope Operator: D. Gonzalez Huerta (LBTO) AO Support: ...
Com20110221
MODS1 Commissioning Run 5: UTC 2011 February 21 Observer(s): R. Pogge, J. Antognini, P. Martini (OSU), M. Wagner (LBTO) Telescope Operator: D. Gonzalez Huerta (...
Com20110222
MODS1 Commissioning Run 5: UTC 2011 February 22 Observer(s): R. Pogge, J. Antognini, P. Martini (OSU), M. Wagner (LBTO) Telescope Operator: D. Gonzalez Huerta (...
Com20110223
MODS1 Commissioning Run 5: UTC 2011 February 23 Observer(s):J. Hill, A. Rakich (Tucson) Telescope Operator: S. Allanson (LBTO) Telescope Support: (LBTO) Instrume...
Com20110315
RFBG performance verification: UTC 2011 March 15 Observer(s):D. Miller, J. Hill, A. Rakich, K. Boutsia (Tucson) Telescope Operator:D. Huerta (LBTO) Telescope Sup...
Com20110316
RFBG performance verification: UTC 2011 March 16 Observer(s):D. Miller, J. Hill, A. Rakich, K. Boutsia (Tucson) Telescope Operator:S. Allanson (LBTO) Telescope S...
Com20110317
MODS1 Commissioning Run 6: UTC 2011 March 17 Observer(s): R. Pogge (OSU) and P. Garnavich (ND) Telescope Operator: S. Allanson (LBTO) AO Support: A. Rakich, J. H...
Com20110318
MODS1 Commissioning Run 6: UTC 2011 March 18 Observer(s): R. Pogge (OSU), P. Garnavich (ND), M. Pedani (LBTO) Telescope Operator: S. Allanson (LBTO) AO Support: A...
Com20110319
MODS1 Commissioning Run 6: UTC 2011 March 19 Observer(s): R. Pogge (OSU), P. Garnavich (ND), and M. Pedani (LBTO) Telescope Operator: S. Allanson (LBTO) AO Supp...
Com20110320
MODS1 Commissioning Run 6: UTC 2011 March 20 Observer(s): R. Pogge (OSU), P. Garnavich (ND), and M. Pedani (LBTO) Telescope Operator: S. Allanson (LBTO) AO Suppor...
Com20110321
MODS1 Commissioning Run 6: UTC 2011 March 21 Observer(s): R. Pogge (OSU), P. Garnavich (ND), and M. Pedani (LBTO) Telescope Operator: S. Allanson (LBTO) AO Suppo...
Com20110322
MODS1 Commissioning Run 6: UTC 2011 March 22 Observer(s): R. Pogge (OSU) Telescope Operator: S. Allanson (LBTO) AO Support: Remote from Tucson as needed Telescop...
Com20110323
MODS1 Commissioning Run 6: UTC 2011 March 23 Observer(s): R. Pogge (OSU) Telescope Operator: G. Becchetti (LBTO) AO Support: Remote from Tucson as needed Telesc...
Com20110324
RFBG performance verification: UTC 2011 March 24 Observer(s):D. Miller, J. Hill, A. Rakich, K. Boutsia (Tucson) Telescope Operator: G. Becchetti (LBTO) Telescope...
Com20110325
RFBG performance verification: UTC 2011 March 25 Observer(s):D. Miller, K. Boutsia (Tucson) Telescope Operator: G. Becchetti (LBTO) Telescope Support: ? Instrum...
Com201103RFBGPlan
RFBG Commissioning: March 24 25, 2010 UT Performance Verification Plan General Description There are three outstanding issues with operation of the RFBG focal ...
Com201103RFBGResults
Right Front Bent Gregorian Performance Verification * Data were collected on March 15th/16th/24th (half nights) and March 25th (all night), 2011 by DMiller and...
Com20110413
MODS1 Commissioning Run 7: UTC 2011 April 13 Observer(s): R. Pogge, R. Stoll (OSU), E. Skillman (UMinn), M. Fumana (INAF), M. Wagner (OSU/LBTO) Tele...
Com20110414
MODS1 Commissioning Run 7: UTC 2011 April 14 Observer(s): R. Pogge, R. Stoll (OSU), E. Skillman (UMinn), M. Fumana (INAF), M. Wagner (OSU/LBTO) Tel...
Com20110415
MODS1 Commissioning Run 7: UTC 2011 April 15 Observer(s): R. Pogge, R. Stoll (OSU), E. Skillman (UMinn), M. Fumana (INAF), M. Wagner, O. Kuhn (OSU/LB...
Com20110416
MODS1 Commissioning Run 7: UTC 2011 April 16 Observer(s): R. Pogge, R. Stoll (OSU), E. Skillman (UMinn), M. Fumana (INAF), M. Wagner, O. Kuhn, J. Hil...
Com20110417
MODS1 Commissioning Run 7: UTC 2011 April 17 Observer(s): R. Pogge, R. Stoll (OSU), M. Fumana (INAF) Telescope Operator: G. Bechetti (LBTO) AO Support: Remote fro...
Com20110418
Main.AndrewRakich 18 Apr 2011 LBC technical; Mirror temperature modelling: UTC 2011 April 18 Observer(s): A. Rakich, O. Kuhn (LBTO, Tucson) Telescope Operator: G...
r5 - 18 Apr 2011 - 12:02 by AndrewRakich
Com20110516
UTC 2011 May 16 Observer(s): T. Sargent, P. Grenz, A. Rakich, O. Kuhn, J. Hill (Tucson) Telescope Operator: D. Huerta (LBTO) Telescope Support:: M. Midkiff (LBT...
Com20110517
UTC 2011 May 17 Observer(s): T. Sargent, P. Grenz, A. Rakich, J. Hill (LBTO, Tucson) Telescope Operator: D. Huerta (LBTO) Telescope Support: J. Little (LBTO) In...
Com20110518
18 May 2011 UT: BP11, LBC Collimation Model Temperature Dependence Observers: Andrew Rakich, John Hill, Olga Kuhn, Paul Grenz (working on LBC BP11 SW) (Tucson) ...
Com20110521
AO Preset Testing and Range Balancing: UTC 2011 May 21 Observer(s):D. Miller, K. Boutsia, JC. Guerra (LBTO) A. Rakich, J. Hill, O. Kuhn (Tucson) Telescope Operat...
Com20110525
AGW Bias Frames for MODS 1 25 May 2011 UT (at the start of an LBTI/LMIRCam night) Observer: J. Hill Summary Took bias data for MODS1 AGW cameras with (full fra...
Com20110529
MODS1 Dark Commissioning and Spring SV Run: UTC 2011 May 29 Observer(s): R. Pogge (OSU), M. Wagner (OSU/LBTO), M. Pedani (LBTO) Telescope Opera...
Com20110530
MODS1 Dark Commissioning and Spring SV Run: UTC 2011 May 30 Observer(s): R. Pogge (OSU), M. Wagner (OSU/LBTO), M. Pedani (LBTO) Telescope Operator: G...
Com20110531
MODS1 Dark Commissioning and Spring SV Run: UTC 2011 May 31 Observer(s): R. Pogge (OSU), O. Kuhn (LBTO) Telescope Operator: G. Bechetti (LBTO) Telescope Support: ...
Com20110601
MODS1 Dark Commissioning and Spring SV Run: UTC 2011 June 1 Observer(s): R. Pogge (OSU), M. Wagner (OSU/LBTO), O. Kuhn (LBTO) Telescope Operator: D. Gonzalez Hu...
Com20110702
Front Bent Gregorian Binocular Collimation and Pointing OSA: S. Allanson Observers: A. Rakich, O. Kuhn (Tucson) and K. Boutsia (LBTO) ISA: T. Shih Plan: 1) Get...
r3 - 02 Jul 2011 - 11:28 by AndrewRakich
Com20110704
Thermal cycling primarys with LBC FPIA Observer(s): A. Rakich, K. Boutsia and O. Kuhn at start of the night (LBTO) Telescope Operator: S. Allanson (LBTO) Telescop...
r3 - 04 Jul 2011 - 11:27 by AndrewRakich
Com20110903
Software test Open Dome Observer(s): K. Boutsia Telescope Operator: D. Gonzales (LBTO) Telescope Support: Instrument Support: J. Morris Summary CLOSED FOR W...
Com20110904
LBC Verification Collimation model Observer(s): A. Rakich, O.Kuhn (Tucson), J. Hill, K. Boutsia (LBT) Telescope Operator: D. Gonzales (LBTO) Telescope Support: ...
Com20110916
Initial Setup at Front Bent Gregorian 16 September 2011 UT Observer(s): J. Hill (Tucson) Telescope Operator: S. Allanson (LBTO) Telescope Support: K. Newton (LB...
Com20110917
Initial Setup at Front Bent Gregorian 17 September 2011 UT Observer(s): J. Hill (Tucson) Telescope Operator: S. Allanson (LBTO) Telescope Support: K. Newton (LB...
Com20110918
Initial Setup at Front Bent Gregorian 18 September 2011 UT Observer(s): J. Hill (Tucson), O. Kuhn (LBTO) plus Fernando, Mauro, Rick, Rebecca Telescope Operator:...
Com20110919
Initial Setup of MODS1 at Left Direct Gregorian 19 September 2011 UT Observer(s): J. Hill (Tucson), R. Pogge, R. Stoll, O. Kuhn (LBTO) plus Fernando, Mauro Tele...
Com20110920
Initial Setup at Left Direct Gregorian 20 September 2011 UT Observer(s): J. Hill (Tucson), R. Pogge. R. Stoll, O. Kuhn (LBTO) plus Fernando, Mauro Telescope Ope...
Com20111009
Checkout at Right Front Bent Gregorian 09 October 2011 UT Observer(s): J. Hill (LBTO), plus Lorenzo, Alfio, Carmelo at the beginning Telescope Operator: S. Alla...
Com20111010
LBC Collimation and CoPointing 10 October 2011 UT Observer(s): J. Hill (LBTO) Telescope Operator: S. Allanson (LBTO) Telescope Support: B. Bingham (LBTO) Instr...
Com20111011
BP13 testing at LFBG, and with AO at RFBG, plus LBC Pointing 11 October 2011 UT Observer(s): J. Hill (LBTO) plus Alfio, Lorenzo, Carmelo for first half Telescop...
Com20111017
LBC/Gregorian Technical Collimation Updates 17 October 2011 UT Observer(s): D. Thompson,A. Rakich, K. Boutsia, also present: A.DiPaola, F.Pedichini, M.Centrone ...
Com20111018
LBC/Gregorian Technical Collimation Updates 18 October 2011 UT Observer(s): D. Thompson,A.Rakich, K. Boutsia, also present: A.DiPaola, F.Pedichini, M.Centrone ...
Com20111019
Gregorian Technical Collimation Updates 19 October 2011 UT Observer(s): D. Thompson, K. Boutsia, A. Rakich, also present: A.DiPaola, F.Pedichini, M.Centrone Tel...
Com20111027
Collimation and Pointing following re installation of Rigid Secondary on SX. 01:30 Restore old secondary and primary collimation models for SX Gregorian. ...
Com20111029
29 October 2011: Alignment, Collimation and Pointing with Rigid Secondary Problems yesterday afternoon in powering up and communicating with the hexapod. After mu...
Com201110LBBGPlan
Left Back Bent Gregorian Focal Station Commissioning Plan Prerequisites * Day time commissioning of AGW1. Able to position AGw on axis, wfs apert. coinciden...
Com20111101
LBBG Commissioning with AGW1: 01 November 2011 UT Observer: JHill, JHeidt, RPogge (LBTO) with Doug, Mike, Dan, Jesper, Paul assisting remotely Telescope Operator:...
Com20111102
LBBG Commissioning with AGW1: 02 November 2011 UT Observer: JHill, JHeidt, RPogge (LBTO) Telescope Operator: DHuerta (LBTO) Telescope Support: JUrban (LBTO) Ins...
Com20111103
LBBG Commissioning with AGW1: 03 November 2011 UT Observer: JHill, JHeidt, RPogge (LBTO) DMiller (Tucson) JStorm (Potsdam) Telescope Operator: DHuerta (LBTO) Tele...
Com20111104
LBBG Commissioning with AGW1: 04 November 2011 UT Observer: JHill, JHeidt, RPogge (LBTO) Telescope Operator: DHuerta (LBTO) Telescope Support: RHansen (LBTO) In...
Com20111105
LBBG Commissioning with AGW1: 05 November 2011 UT Observer: JHeidt (LBTO) Telescope Operator: DHuerta (LBTO) Telescope Support: RHansen (LBTO) Instrument Suppor...
Com20111210
1st half of night: NON sidereal SW testing: 10 December 2011 UT Observer: JHill (LBTO), CWoodward, KBoutsia (Tucson) Telescope Operator: SAllanson (LBTO) Software...
Com20111211
LBBG Commissioning with AGW1: 11 December 2011 UT Observer: JHill, JHeidt, KBoutsia (LBTO) DMiller (Tucson) Telescope Operator: SAllanson (LBTO) Telescope Suppor...
Com20111212
LBBG Commissioning with AGW1: 12 December 2011 UT Observer: JHill, JHeidt, KBoutsia (LBTO) DMiller (Tucson) JStorm (Potsdam) Telescope Operator: SAllanson (LBTO) ...
Com20111213
LBBG Commissioning with AGW1: 13 December 2011 UT Observer: JHill, JHeidt, KBoutsia (LBTO) DMiller (Tucson) JStorm (Potsdam) Telescope Operator: SAllanson (LBTO) ...
Com20111214
LBBG Commissioning with AGW1: 14 December 2011 UT Observer: JHill, JHeidt, KBoutsia (LBTO) DMiller (Tucson) JStorm (Potsdam) Telescope Operator: DHuerta (LBTO) Te...
Com20111215
LBBG Commissioning with AGW1: 15 December 2011 UT Observer: JHill, JHeidt, KBoutsia (LBTO) DMiller (Tucson) JStorm (Potsdam) Telescope Operator: DHuerta (LBTO) Te...
Com20111216
LBBG Commissioning with AGW1: 16 December 2011 UT Observer: JHill, JHeidt, KBoutsia (LBTO) DMiller (Tucson) JStorm (Potsdam) Telescope Operator: DHuerta (LBTO) Te...
Com201112LBBGPlan
LBBG Commissioning with AGW1 on December 11 16, 2011 UT Performance Verification Plan General Description John's Email of 10 Nov 2011 While we made good progr...
Com20120104
UT 20120104 LBC Technical Observations Observer: ARakich (@LBT), DThompson (Tucson) Telescope Operator: DGonzalez Huerta Instrument Support: JMorris Telescope ...
Com20120105
UT 20120105 LBC Technical Observations Observer: ARakich (@LBT), KBoutsia (Tucson) Telescope Operator: DGonzalez Huerta Instrument Support: JMorris Telescope S...
Com20120106
UT 20120106 LBC Technical Observations Observer: ARakich, KBoutsia (Tucson) Telescope Operator: DGonzalez Huerta Instrument Support: JMorris Telescope Support:...
Com20120107
UT 20120107 LBC Technical Observations Observer: DMiller(@LBTO), KBoutsia (Tucson) Telescope Operator: DGonzalez Huerta Instrument Support: JMorris Telescope S...
Com20120108
UT 20120108 LBC Technical Observations Observer: DMiller(@LBTO), KBoutsia (Tucson) Telescope Operator: DGonzalez Huerta Instrument Support: JMorris Telescope S...
Com20120109
UT 20120109 LBC Technical Observations Observer: DMiller(@LBTO), KBoutsia (Tucson) Telescope Operator: DGonzalez Huerta Instrument Support: JMorris Telescope S...
Com20120110
1st half of night: NON sidereal SW testing: 10 January 2012 UT Observer: CWoodward, KBoutsia (Tucson) Telescope Operator: DGonzalez (LBTO) Software Support: MDela...
Com20120111
1st half of night: NON sidereal SW testing: 11 January 2012 UT Observer: CWoodward, KBoutsia (Tucson) Telescope Operator: GBechetti (LBTO) Software Support: MDela...
Com20120112
UT 201201012 LBBG Technical Observations Observer: JHeidt (@LBTO), DMiller, JCarlos (Tucson) Telescope Operator: GBechetti (LBTO) Telescope Support: JUrban (LBT...
Com20120113
UT 201201013 LBBG Technical Observations Observer: JHeidt (@LBTO), DMiller, JCarlos (Tucson) (1st half) Andrew Rakich, Dave Thompson (Tucson) (second half) Teles...
r9 - 14 Jan 2012 - 13:19 by AndrewRakich
Com20120114
UT 201201014 LBBG Technical Observations Observer: JHeidt (@LBTO), DMiller, JCarlos, ARakich, DThompson (Tucson) Telescope Operator: GBechetti (LBTO) Telescope S...
Com201201LBBGResults
LBBG Focal Station Commissioning and Performance Verification Results Dice5 Results * Data were collected on January 7th/12th (full nights) and 11th/13th (hal...
Com20120201
Main.KonstantinaBoutsia 01 Feb 2012 * 20120101 coma: * first sequence starts with left_wfscimage000226.fits (03:41UT) * Looks Fine ...
Com20120203
UT 20120203 AGw#4 at RFBG Verification Observer: DMiller, JCarlos, JHill (LBTO) Telescope Operator: DHuerta (LBTO) Telescope Support: (LBTO) Instrument Support...
Com20120204
UT 20120204 AGw#3 at LFBG Verification Observer: DMiller, JCarlos, JHill (LBTO) Telescope Operator: DHuerta (LBTO) Telescope Support: JUrban(LBTO) Instrument S...
r10 - 05 Feb 2012 - 03:26 by JuanGuerra
Com20120205
UT 20120205 AO/PISCES technical night Observer: DMiller (tucson), JCarlos (LBTO) Telescope Operator: DHuerta (LBTO) Telescope Support: JUrban(LBTO) Instrument ...
r7 - 10 Feb 2012 - 18:02 by JuanGuerra
Com20120206
UT 20120206 AO/PISCES technical night Observer: DMiller, JHill (Tucson), JCarlos (LBTO) Telescope Operator: DHuerta (LBTO) Additional AO Support: SEsposito, EPi...
Com20120207
UT 20120207 AO2 commissioning @ LBBG Observer: KBoutsia, JHill (Tucson), JCarlos (LBTO) Telescope Operator: DHuerta (LBTO) Additional AO Support: SEsposito, ...
r7 - 10 Feb 2012 - 18:49 by JuanGuerra
Com20120208
UT 20120208 AO2 commissioning Observer: KBoutsia, JCarlos (LBTO) Telescope Operator: Steve Allanson (LBTO) Additional AO Support: SEsposito, EPinna, APuglisi...
Com20120209
UT 20120209 AO2 commissioning Observer: SEsposito, EPinna, APuglisi, MXompero, KBoutsia (LBTO) Telescope Operator: Steve Allanson (LBTO) Additional AO Suppor...
Com20120210
UT 20120210 AO2 commissioning Observer: SEsposito, EPinna, APuglisi, MXompero, KBoutsia (LBTO) Telescope Operator: Steve Allanson (LBTO) Additional AO Suppor...
Com201202AGw4
AGw#3 at LFBG Verfication After mounting of IRTC at LFBG Check Operation of IRTC * Power on and test IRTC (worked on 2 Feb 2012 MST after a reboot of the PC)...
Com20120304
UT 20120304 AGw#3 at LFBG Verification Observer: DMiller (Tucson), DThompson (LBTO), JHill (LBTO) Telescope Operator: SAllanson (LBTO) Telescope Support: JLitt...
Com20120305
UT 20120305 AGw#3 at LFBG Verification Observer: DMiller (Tucson), DThompson (LBTO), JHeidt (LBTB) Telescope Operator: SAllanson (LBTO) Telescope Support: JUrb...
Com20120403
UT 20120403 Laser Tracker Collimation Observer: DThompson (Tucson), ARakich (LBTO) Telescope Operator: DGH (LBTO) Telescope Support: (LBTO) Instrument Support:...
r5 - 03 Apr 2012 - 12:45 by AndrewRakich
Com20120410
AGw3 Calibration at LFBG with LUCI1: 10 April 2012 UT Observer: JHill (LBTO), and eventually DThompson (Tucson), DMiller (Tucson) Telescope Operator: GBechetti (L...
Com20120531
UT 20120531 SX Adsec Astigmatism and AGw#1 Transformaion Observer: DMiller, KBoutsia (LBTO) Telescope Operator: DHuerta (LBTO) Telescope Support: JUrban(LBTO) ...
Com201205Plan
May 31 June 2 Technical Observing Plan Schedule * Good Seeing Plan * 5/30: 1st half SX AdSec Astig LUT, AGw#1 Transformation (DLM, KB) ( AO rested sh...
Com20120601
UT 20120601 AGw#1 Performance Verification (2nd Half) Observer: DMiller, KBoutsia (LBTO) Telescope Operator: DHuerta (LBTO) Telescope Support: MMidkiff(LBTO) I...
Com20120602
UT 20120601 Source Extractor Active Optics, AdSec Rested Collimation and Closed AO Loop on DX Observer: DMiller, KBoutsia (LBTO) JCGuerra (Tucson) Telescope Oper...
Com20120602a
02 June 2012 (until 05:00 UT) Summary: We spent some time testing binorb in the hope of collecting data for a binocular range balanced Gregorian collimation mode...
Com20120907
Telescope Bootstrap Startup: 7 September 2012 UT Observer: JHill (LBTO) Telescope Operator: DHuerta (LBTO) Software Support: CBiddick, MDelaPena (Tucson) SHooper ...
Com20120908
Telescope Bootstrap Startup: 8 September 2012 UT Observer: JHill (LBTO) Telescope Operator: DHuerta (LBTO) Software Support: CBiddick (Tucson) AO Support: DMill...
Com20120909
Telescope Bootstrap Startup: 9 September 2012 UT Observer: JHill (LBTO) Telescope Operator: DHuerta (LBTO) Software Support: CBiddick (Tucson) AO Support: DMill...
Com20120910
Telescope Bootstrap Startup: 10 September 2012 UT Observer: JHill (LBTO) Telescope Operator: DHuerta (LBTO) Software Support: CBiddick (Tucson) AO Support: DMil...
Com20120911
Telescope Bootstrap Startup: 11 September 2012 UT Observer: JHill (LBTO) Telescope Operator: DHuerta (LBTO) Software Support: CBiddick (Tucson) AO Support: DMil...
Com20120912
Telescope Bootstrap Startup: 12 September 2012 UT Observer: JHill (LBTO) Telescope Operator: GBechetti (LBTO) Software Support: CBiddick (Tucson) AO Support: DM...
Com20120913
Telescope Bootstrap Startup: 13 September 2012 UT Observer: JHill (LBTO), OKuhn(Tucson) Telescope Operator: GBechetti (LBTO) Software Support: CBiddick (Tucson) ...
Com20120914
Telescope Bootstrap Startup: 14 September 2012 UT Observer: DMiller (LBTO), OKuhn, MEdwards(Tucson) Telescope Operator: GBechetti (LBTO) Software Support: CBiddi...
Com20120915
Telescope Bootstrap Startup: 15 September 2012 UT Observer: DMiller (LBTO), OKuhn, MEdwards(Tucson) Telescope Operator: GBechetti (LBTO) Software Support: CBiddi...
Com20120916
Telescope Bootstrap Startup: 16 September 2012 UT Observer: SEsposito, LBusoni, ARiccardi, DMiller, JHill (LBTO) Telescope Operator: GBechetti (LBTO) Software Su...
Com201209Plan
Telescope and Instrument Restart Plan for 7 15 September 2012 UT Overview The September 2012 Restart Campaign includes the following items listed here in priorit...
Com20121128
Technical Observing: 28 November 2012 UT Observer: DMiller, JGuerra (LBTO) Telescope Operator: DHuerta (LBTO) Software Support: TLeibold (Tucson) AO Support: DM...
Com20121129
Technical Observing: 29 November 2012 UT Observer: DMiller, JGuerra, JChristou (LBTO) Telescope Operator: DHuerta (LBTO) Software Support: TLeibold (Tucson) AO ...
r4 - 30 Nov 2012 - 02:28 by JuanGuerra
Com20121130
Technical Observing: 30 November 2012 UT Observer: DMiller, JGuerra, JChristou (LBTO) Telescope Operator: DHuerta (LBTO) Software Support: TLeibold (Tucson) AO ...
Com201211Plan
November 28 December 1 (UT) Technical Observing Plan Night Time Tasks * Very Good Seeing * LBC Focal Plane Tilt (John, 3 Hours) * Good Seeing Tasks...
Com20121201
Technical Observing: 01 December 2012 UT Observer: DMiller (Tucson), JGuerra, JChristou (LBTO) Telescope Operator: DHuerta (LBTO) Software Support: TLeibold (Tuc...
Com20121229
Technical Observing: 29 December 2012 UT Observer: DMiller, JHill (LBTO) Telescope Operator: GBechetti (LBTO) Software Support: TSargent (Tucson) AO Support: DM...
Com20121230
Technical Observing: 30 December 2012 UT Observer: JHill (LBTO) Telescope Operator: GBechetti (LBTO) Software Support: TSargent (Tucson) AO Support: JChristou (...
Com201212Plan
2012 December 27 2013 January 1 (UT) Technical Observing Plan Observers * DLM Dec 26 28 MST * JMH Dec 28 31 MST * TBD Dec 30 31 MST Day Time Ta...
Com2013011Plan
PepsiPFU Commissioning Observing Plan for November, 2013 Preparation Set GCS executable to the most recent patch To use the most recent patch of GCS: * login...
r3 - 04 Jan 2014 - 09:30 by TarasGolota
Com20130122
UT 20130122 Technical Observing with AGW2 Observer: DMiller (LBTO) JHill (Tucson) Telescope Operator: GBechetti (LBTO) Additional AO Support: DMiller (LBTO) Teles...
Com20130123
UT 20130123 Technical Observing Observer: DMiller (LBTO) JHill (Tucson) Telescope Operator: SAllanson (LBTO) Additional AO Support: DMiller (LBTO) Telescope Suppo...
Com20130124
UT 20130124 Technical Observing Observer: DMiller (LBTO) JHill (Tucson) Telescope Operator: SAllanson (LBTO) Additional AO Support: DMiller (LBTO) Telescope Suppo...
Com20130131
UT 20130131 Technical Observing Observer: JHill (Tucson) Telescope Operator: DHuerta (LBTO) Additional AO Support: DMiller (LBTO) Telescope Support: JLittle (LBTO...
Com201301Plan
2013 January 22 25 and January 30 February 4 (UT) Technical Observing Plan Observers * DLM JMH 21 Jan MST * JMH software DLM JMH 22 Jan MST * DLM J...
Com20130201
UT 20130201 Technical Observing Observer: JHill, MDeLaPena, CBiddick, DSummers (Tucson) Telescope Operator: DHuerta (LBTO) Additional AO Support: DMiller (LBTO) T...
Com20130202
UT 20130202 Technical Observing Observer: JHill, MDeLaPena, CBiddick, DSummers, DMiller (Tucson) Telescope Operator: DHuerta (LBTO) Additional AO Support: DMiller...
Com20130203
UT 20130203 Technical Observing Observer: JHill (Tucson) Telescope Operator: DHuerta (LBTO) Additional AO Support: DMiller (Tucson) Telescope Support: JLittle (L...
Com20130324
UT 20130324 Technical Observing Observer: DMiller, JGuerra, JChristou (LBTO) Telescope Operator: GBechetti (LBTO) Additional AO Support: DMiller (LBTO) Telescope ...
Com20130325
UT 20130325 Technical Observing Observer: DMiller, JGuerra, JChristou (LBTO) Telescope Operator: GBechetti (LBTO) Additional AO Support: DMiller (LBTO) Telescope ...
Com20130327
UT 20130327 Technical Observing Observer: JHill (Tucson) Telescope Operator: SAllanson (LBTO) Additional AO Support: JChristou (LBTO) Telescope Support: JLittle (...
Com20130328
UT 20130328 Technical Observing TCS Software Tests Active Optics Calibration for MODS1 Observer: JHill, CBiddick, MDeLaPena, TSargent (Tucson) DMiller (home) ...
Com20130329
UT 20130329 Technical Observing Active Optics Calibration Observer: JHill, (Tucson) DMiller (home) Telescope Operator: SAllanson (LBTO) Additional AO Support: J...
Com20130330
UT 20130330 Technical Observing Binocular Testing Observer: JHill, (Tucson) Telescope Operator: SAllanson (LBTO) Additional AO Support: JChristou (LBTO) Telesco...
Com201303Plan
2013 March Technical Observing Plan Observers Daytime Tasks * Make flat fields and/or bad pixel files for AGW1 and AGW2 (JCG) * Make InformationTechno...
Com20130427
UT 20130427 Technical Observing Active Optics Calibration Observer: JHill, (Tucson) DMiller (home) Telescope Operator: DHuerta (LBTO) AO Support: JCGuera (LBTO)...
Com20130428
UT 20130428 Technical Observing Active Optics Calibration Observer: DMiller (Tucson) Telescope Operator: DHuerta (LBTO) AO Support: JCGuera (Home) Telescope Sup...
Com201304Plan
2013 April Technical Observing Plan Observers Daytime Tasks * Make flat fields and/or bad pixel files for AGW1 and AGW2 (JCG) Nighttime Tasks TCS Pre Re...
Com20130513
UT 20130513 Technical Observing Active Optics Calibration Observer: DMiller, JHill, OKuhn (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: JCGuera (Hom...
Com20130516
UT 20130516 Technical Observing Active Optics Calibration Observer: DMiller, JHill, OKuhn (Tucson) Telescope Operator: DHuerta (LBTO) AO Support: JCGuera (Home)...
Com20130521
UT 20130521 Technical Observing SX AdSec Realignment Observer: DMiller, JHill (Tucson) ASkemer, VBailey (LBTO) Telescope Operator: DHuerta (LBTO) AO Support: JC...
Com20130522
UT 20130522 Technical Observing MODS Collimation Issues Observer: DMiller, JHill, OKuhn (Tucson) ASkemer, VBailey (LBTO) Telescope Operator: GBechetti (LBTO) AO...
Com201305Plan
LBTO Focal Station Checkout, 21 22 May 2013 UT These are the tests following the re installation of the SX Adaptive Secondary. * LBTO Staff: * Doug and ...
Com20130620
UT 20130620 Technical Observing LFBG Collimation Tests Observer: DMiller (LBTO) Telescope Operator: SAllanson (LBTO) AO Support: DMiller (LBTO) Telescope Suppor...
Com20130621
UT 20130621 Technical Observing LDG Collimation Tests Observer: DMiller (LBTO) Telescope Operator: SAllanson (LBTO) AO Support: DMiller (LBTO) Telescope Support...
Com20130625
UT 20130625 Technical Observing LDG Collimation Tests Observer: DMiller (LBTO) Telescope Operator: SAllanson (LBTO) AO Support: DMiller (LBTO) Telescope Support...
Com201306Plan
Active Optics Tests at LFBG and LDG, 20 21 June 2013 UT LFBG focal station 1 Initial pointing, alignment and collimate on axis 1 Measure to confirm or co...
Com20130901
UT 20130901 Technical Observing Post Shutdown Wake up Observer: JHill, DThompson (Tucson) Telescope Operator: GBechetti (LBTO) Software Support: DCox, DSummers,...
Com20130902
UT 20130902 Technical Observing AGW1 Alignment and Calibration at LFBG Observer: JHill, DThompson (Tucson) DMiller (LBTO) Telescope Operator: GBechetti (LBTO) S...
r6 - 05 Sep 2013 - 20:32 by TarasGolota
Com20130903
UT 20130903 Technical Observing LUCI1 and AGW1 Alignment at LFBG Observer: JHill, DThompson (Tucson) DMiller (LBTO) Telescope Operator: GBechetti (LBTO) Softwar...
r11 - 05 Sep 2013 - 20:33 by TarasGolota
Com20130904
UT 20130904 Technical Observing AGw Calibration Observer: JHill (Tucson) DMiller (LBTO) Telescope Operator: DGonzalez (LBTO) Software Support: DCox (Tucson) AO ...
Com20130905
20130905 Instrument Initial Night time Checkout Configured for MODS at start of night During the afternoon, John M and Jenny swapped the sequencer card and fiber ...
Com20130906
6 September 2013 Configured for LBC 02:00 Starting with Flat Fields. Skies photometric. Uspec (021016...) and V BESSEL (021013) * in 1 sec 8000 in b and 6000 ...
Com20130907
UT 20130904 Technical Observing AGw Calibration Observer: MEdwards (Tucson) JHill (LBTO) Telescope Operator: DGonzalez (LBTO) Software Support: DCox (Tucson) AO...
Com20130910
UT 20130910 Technical Observing Closed Dome Binocular Collimation Observer: JHill (Tucson) Telescope Operator: DHuerta (LBTO) Software Support: DCox (Tucson) A...
Com20130911
UT 20130911 Technical Observing Observer: DThompson (Tucson) Telescope Operator: Sallanson (LBTO) Software Support: DCox (Tucson) AO Support: (LBTO) Telescope S...
Com20130912
UT 20130912 Technical Observing Observer: DThompson, JHill, DMiller (Tucson) Telescope Operator: Sallanson (LBTO) Software Support: DCox (Tucson) AO Support: DMi...
Com20130913
UT 20130912 Technical Observing Observer: CBiddick, MdlPena, Taras, JHill, DMiller (Tucson) Telescope Operator: Sallanson (LBTO) Software Support: DCox (Tucson) ...
Com20130915
UT 20130915 Technical Observing AGw2 Calibration Observer: JHill, DMiller (Tucson) Telescope Operator: SAllanson (LBTO) Software Support: DCox (Tucson) AO Suppo...
Com20130916
UT 20130916 Technical Observing AGw2 Calibration Observer: JHill, DMiller (Tucson) Telescope Operator: SAllanson (LBTO) Software Support: DCox (Tucson) AO Suppo...
Com20130917
UT 20130917 Technical Observing TCS and AO Testing Observer: JHill, DMiller (Tucson) Telescope Operator: SAllanson (LBTO) Software Support: Team TCS and DCox (T...
Com20130918
UT 20130918 Technical Observing AGw2 Calibration Observer: JHill, DMiller (Tucson) Telescope Operator: GBechetti (LBTO) Software Support: DCox (Tucson) AO Suppo...
Com20130919
UT 20130919 Technical Observing AGw2 Calibration Observer: DMiller (Tucson) Telescope Operator: GBechetti (LBTO) Software Support: DCox (Tucson) AO Support: JGu...
Com20130923
Mixed Bag: Some TCS testing, and the plan is for MODS and LBC checkout and filler science High winds and some humidity wind gusts are keeping the dome closed. T...
Com20130924
UT 20130924 Science Observing ISA: MEdwards (LBTO) OSA: GBechetti (LBTO) ISp: E Solheid Summary High IT (started critical): 4280 LUCI1: Compressor cold head bro...
Com20130928
Parallel Technical Observing with AGW2 20130928 UT Observers: JHill (Tucson remote room) Telescope Operator: (LBTO) AO Support:: (Tucson) Telescope Support::...
Com201309Plan
Telescope and Instrument Restart Plan for 1 8 September 2013 UT Overview Telescope Bootstrap Restart On Sky and Focal Station Check PreRequisites Off sky Engi...
Com20131025
Technical Observing 20131025 UT Observers: JHill, DMiller (Tucson) Telescope Operator: SAllanson (LBTO) AO Support:: DMiller (Tucson) Telescope Support:: MMidk...
Com20131128
PepsiPFU Commissioning Observing 20131128 UT Observers: JStorm, IIlyin, MWeber (LBTO), DMiller, JHill (Tucson) Telescope Operator: DHuerta (LBTO) AO Support:: D...
Com20131130
PepsiPFU Commissioning Observing 20131130 UT Observers: JStorm, IIlyin, MWeber (LBTO), DMiller, JHill (Tucson) Telescope Operator: DHuerta (LBTO) AO Support:: D...
Com20131203
PepsiPFU Commissioning Observing 20131203 UT Observers: JStorm, IIlyin (LBTO), JHill (Tucson) Telescope Operator: SAllanson (LBTO) Summary Details Adjusting ...
Com20131207
PepsiPFU Commissioning Observing 20131207 UT Observers: JStorm, IIlyin, DMiller, JHill (Tucson) Telescope Operator: SAllanson (LBTO) Summary Details 02:13 on ...
Com20131212
Technical Observing AGW1 AGW2 Testing w/LUCI1 LUCI2 20131212 UT Observers: JHill, DMiller (Tucson), DThompson (LBTO) Telescope Operator: GBechetti (LBTO) AO S...
Com20131214
Technical Observing AGW1 AGW2 Testing 20131214 UT Observers: DMiller (Tucson), DThompson (LBTO) Telescope Operator: GBechetti (LBTO) AO Support: DMiller (Tucson...
Com20131216
Technical Observing AGW1 AGW2 Testing 20131216 UT Observers: DMiller (Tucson), MEdwards, TSargent, JHeidt (LBTO) Telescope Operator: GBechetti (LBTO) AO Support...
Com20131218
Technical Observing AGW1 Field Aberration Data for AdSec 20131218 UT Observers: JHill, DMiller (Tucson) Telescope Operator: DHuerta (LBTO) AO Support: DMiller (Tu...
Com20140107
PepsiPFU Commissioning Observing 20140107 UT Observers: JStorm, IIlyin, MWeber, AJarvinen (LBTO), DMiller (Tucson) Telescope Operator: DHuerta (LBTO) AO Support...
Com20140108
PepsiPFU Commissioning Observing 20140108 UT Observers: JStorm, IIlyin, MWeber, AJarvinen (LBTO), DMiller, JHill (Tucson) Telescope Operator: DHuerta (LBTO) AO ...
Com20140109
PepsiPFU Commissioning Observing 20140109 UT Observers: JStorm, IIlyin, MWeber, AJarvinen (LBTO), JHill, DMiller (Tucson) Telescope Operator: DHuerta (LBTO) AO ...
Com20140110
PepsiPFU Commissioning Observing 20140110 UT Observers: JStorm, IIlyin, MWeber, AJarvinen (LBTO), JHill (Tucson) Telescope Operator: DHuerta (LBTO) AO Support::...
Com20140124
Technical Observing 20140124 UT Observers: DThompson (LBTO), JHill (Tucson remote room) DMiller (home under the weather) Telescope Operator: GBechetti (LBTO) ...
r4 - 25 Jan 2014 - 00:26 by TarasGolota
Com20140207
Technical Observing 20140207 UT Observers: JHill (Tucson remote room) Telescope Operator: SAllanson (LBTO) AO Support:: (Tucson) Telescope Support:: MMidkif...
Com20140227
Technical Observing Verification of AGw Non Vignetting 20140227 UT Observers: JHill (Tucson remote room) Telescope Operator: SAllanson (LBTO) Summary These w...
Com20140318
Technical Observing LBC IQ Tests 20140318 UT Observers: JHill, OKuhn, MEdwards (Tucson remote room) Telescope Operator: DHuerta (LBTO) Summary Wind was high ...
Com20140320
Technical Observing ARGOS Dichroic Tests 20140320 UT Observers: JHill (Tucson remote room) MBonaglia, LBusoni and many others on site Telescope Operator: SAll...
Com20140322
Technical Observing LBC IQ Tests 20140322 UT Observers: JHill, OKuhn, MEdwards (Tucson remote room) Telescope Operator: SAllanson (LBTO) Summary First Half ...
Com20140418
DX Field Data 20140418 UT Observers: DMiller, JHill (Tucson) Telescope Operator: GBechetti (LBTO) AO Support:: DMiller (Tucson) Telescope Support:: MMidkiff (L...
Com20140422
DX Field Data 20140422 UT Observers: DMiller (Tucson), JStorm, IIlyn (LBTO) Telescope Operator: GBechetti (LBTO) AO Support:: DMiller (Tucson) Telescope Suppor...
Com20140423
Pepsi PFU 20140423 UT Observers: DMiller (Tucson), JStorm, IIlyn (LBTO) Telescope Operator: GBechetti (LBTO) AO Support:: DMiller (Tucson) Telescope Support:: ...
Com20140424
DX Field Data 20140424 UT Observers: JStorm, IIlyn (LBTO) Telescope Operator: DHuerta (LBTO) AO Support:: DMiller (Tucson) Telescope Support:: JUrban (LBTO) In...
Com20140425
DX Field Data 20140425 UT Observers: JStorm, IIlyn (LBTO) Telescope Operator: DHuerta (LBTO) AO Support:: DMiller (Tucson) Telescope Support:: JUrban (LBTO) In...
Com20140430
MODS2 Commissioning Night 1 20140430 UT Observers: DMiller, RPogge, OKuhn (LBTO), JHill, MWagner (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: DMill...
Com201404MODSPlan
Right Direct Gregorian Focal Station Commissioning with MODS2 Plan Initial Rotator Zeropoint with MODS (open loop) Note: Since MODS is a dual channel instrument...
Com20140501
MODS2 Commissioning Night 2 20140501 UT Observers: D. Miller (LBTO), R. Pogge (OSU), O. Kuhn (LBTO), remote from Tucson: J. Hill M. WagnerTelescope Operator: ...
Com20140502
MODS2 Commissioning Night 3 20140502 UT Observers: D. Miller (LBTO), R. Pogge (OSU), O. Kuhn (LBTO), J. Hill (LBTO, Remote from Tucson)Telescope Operator: S. Al...
Com20140503
MODS2 Commissioning Night 4 20140503 UT Observers: D. Miller (LBTO), R. Pogge (OSU), O. Kuhn (LBTO), J. Hill, M. Wagner (LBTO, Remote from Tucson) Telescope Ope...
Com20140504
MODS2 Commissioning Night 5 20140504 UT Observers: R. Pogge (OSU), O. Kuhn (LBTO), J. Hill, D. Miller (LBTO, Remote from Tucson) Telescope Operator: S. Allanson...
Com20140505
MODS2 Commissioning Night 6 20140505 UT Observers: O. Kuhn (LBTO), J. Hill, D. Miller, R. Pogge, M. Wagner (LBTO, Remote from Tucson) Telescope Operator: S. All...
Com20140610
E and D Time 20140610 UT Observers: O. Kuhn, J. Hill, D. Miller (Remote from Tucson) Telescope Operator: D. Huerta (LBTO) AO Support: D. Miller (LBTO) Telescop...
Com20140614
E and D Time 20140614 UT Observers: O. Kuhn, J. Hill, D. Miller (Remote from Tucson) Telescope Operator: S. Allanson (LBTO) AO Support: D. Miller (LBTO) Telesc...
Com20140830
Startup Night 1 20140830 UT Observers: JHill (LBTO), OKuhn, BRothberg (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: JChristou Telescope Support: KN...
Com20140831
Startup Night 2 20140831 UT Observers: JHill (LBTO), OKuhn, BRothberg (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: JCGuerra, MLefevbre (LBTO) Teles...
Com20140901
Startup Night 3 20140901 UT Observers: JHill (LBTO), OKuhn, BRothberg (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: JCGuerra Telescope Support: KNe...
Com20140902
Startup Night 4 20140902 UT Observers: JHill (LBTO), OKuhn (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: JCGuerra Telescope Support: KNewton Softwa...
Com20140903
Startup Night 5 20140903 UT Observers: JHill, BRothberg (LBTO), OKuhn, TGolota, AConrad (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: JCGuerra Teles...
Com20140904
Startup Night 6 20140904 UT Observers: JHill, BRothberg, DMiller (LBTO) Telescope Operator: GBechetti (LBTO) AO Support: DMiller (LBTO) Telescope Support: JLitt...
Com20140905
Startup Night 6 20140905 UT Observers: JHill, BRothberg, DMiller (LBTO) Telescope Operator: GBechetti (LBTO) AO Support: JCGuerra Telescope Support: JUrban (LBT...
Com20140906
Startup Night 8 20140906 UT Observers: JHill, BRothberg (LBTO) DMiller (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: JCGuerra Telescope Support: JUr...
Com20140907
Startup Night 9 20140907 Observers (well, tonight, observed only the cal lamp): OKuhn (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: JCGuerra Telescope...
Com20140909
Startup Night 20140909 Observers: MEdwards (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: JCGuerra Telescope Support: JUrban (LBTO) Software Support: M...
Com20140911
Startup Night 20140911 Observers: DThompson/MEdwards (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: JCGuerra Telescope Support: JUrban (LBTO) Software ...
Com20140912
Startup Night 14 20140912 UT 02:17 MODS1 LBC R Turn on LBC R (only) I realized that you still have to toggle between pages to see the update. In IIFGUI, pseud...
Com20140913
Startup Night 15 : UT 20140913 02:00 Cloudy at sunset, started to rain. RH98.6% LUCI1 Calibrations luci.20140913.NNNN.fits Darks * 0001 0002 1x 4.0s dark O2DCR...
Com20140914
Startup Night 16 : UT 20140914 Clear at sunset, RH67. Steve opened vent doors early to get things cooled down. LUCI1 Calibrations luci.20140914.NNNN.fits Stone_L1...
Com20140915
Startup Night 17 : UT 20140915 Mostly clear at sunset, RHhigh and variable. We were open briefly but had to close. LUCI1 Calibrations luci.20140915.NNNN.fits Dark...
Com20140916
20140916 UT Startup Night 18 Observers: O. Kuhn (Tucson) Telescope Operator: S. Allanson (LBTO) Instrument Support: J. Morris (LBTO) Science Support: B. Rothberg ...
Com201409plan
Plan for September 2014 Startup Observing Times listed are times on sky without any weather contingency. Decision Tree (under development) Is Instrument Mounted?...
Com201410plan
Plan for October 2014 Technical Observing Adaptive Optics Tests Uses LBTI * (Completed 20140930 UT) Closing LBTI Adaptive Loop on SX and DX (priority=high,...
Com20141117
MODS2 AGw Commissioning 20141117 UT Observers: DMiller, JCGuerra, OKuhn (Tucson) Telescope Operator: DHuerta (LBTO) AO Support: JCGuerra Telescope Support: JLit...
r4 - 17 Nov 2014 - 23:25 by TarasGolota
Com20141118
TCS Build 2014D and other E time tests 20141118 UT Observers: JHill, OKuhn, BRothberg (Tucson) Telescope Operator: DHuerta (LBTO) AO Support: (LBTO) Telescope ...
r10 - 21 Nov 2014 - 23:53 by TarasGolota
Com20141119
MODS2 AGw Commissioning 20141117 UT Observers: DMiller, JCGuerra, OKuhn (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: JCGuerra Telescope Support: JL...
Com20141128
Director's Time / Engineering Observers: B.Rothberg, D.Thompson (Tucson) ISA: B.Rothberg Telescope Operator: G.Benchetti (LBTO) AO Support: JCGuerra Telescope Sup...
Com201411modsreport
MODS2 AGw Commissioning Report *19 November 2014 * Douglas Miller * 1 1/3 nights * 2/3 night on Sunday Night * 2/3 night on Tuesday Summary ...
Com201411plan
Plan for November 2014 Technical Observing Notional Schedule for the Night of 17 Nov 2014 MST Assuming an allocation of time which is approximately this, I've pr...
Com20141224
Director's Time Observers: B.Rothberg, D. Thompson, B.Frye (Tucson) ISA: B.Rothberg (Tucson) Telescope Operator: D.G.Huerta (LBTO) AO Support: JCGuerra Telescope ...
Com20141225
Director's Time Observers: B.Rothberg ISA: B.Rothberg (Tucson) Telescope Operator: D.G.Huerta (LBTO) AO Support: JCGuerra Telescope Support: None Software Support...
Com20141229
Director's Time Observers: B.Rothberg ISA: B.Rothberg (Tucson) Telescope Operator: D.G.Huerta (LBTO) AO Support: JCGuerra Telescope Support: K.Newton Software Su...
Com20141230
E/D Night 20141230 UT Observers: B. Rothberg, D. Miller, (LBTO, Remote from Tucson) Telescope Operator: D. Huerta (LBTO) AO Support: D. Miller (LBTO) Telescope...
Com20150117
Director's Time Observers: B.Rothberg ISA: B.Rothberg Telescope Operator: D.G.Huerta (LBTO) AO Support: JCGuerra Telescope Support: M.Wagner (LBTO) Software Suppo...
Com20150311
20150311 UT Realignment of the Rigid Secondary on SX Technical Observer: JHill Telescope Operator: CBechetti Data Analysis: DLMiller Other Assistance: MGusick, ...
Com20150324
E time for TCS testing 20140324 UT Observers: JHill, DMiller (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: Telescope Support: JUrban (LBTO) Softwar...
Com20150401
E time 20150401 UT Observers: JHill, DMiller (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: DMiller (Tucson) Software Support: (Tucson) Summary Pla...
Com20150402
E time D time 20150402 UT Observers: JHill, DMiller, OKuhn, BRothberg (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: DMiller (Tucson) Software Suppo...
Com20150404
E time 20150404 UT Observers: JHill, DMiller (Tucson) Telescope Operator: DHuerta (LBTO) AO Support: DMiller (Tucson) Software Support: (Tucson) Summary Plan ...
Com20150506
6 May 2015 UT: MODS2 Calibrations LUCI2 Commissioning but weather poor and they are working with telescope at zenith/dome dark. Working toward obtaining a complet...
Com20150511
11 May 2015 MODS2 Commissioning Observers: Doug Miller, Mark Wagner, Olga Kuhn OSA: Steve Allanson InstSp: Jenny Power Photometric Skies. Seeing is good, 0.6" on ...
Com20150512
12 May 2015 UT MODS2 Commissioning Observers: MWagner, BRothberg, OKuhn OSA: SAllanson InstSp: JPower Conditions: Cirrus it was thicker earlier today, but s...
Com20150513
13 May 2015 UT MODS2 Commissioning Completely overcast at sunset, and it looks like it might rain. Will complete running the modsCalib scripts in ~modseng/modsScr...
Com20150907
Startup Night 5 20150907 UT Observers: JHill, (LBTO) BRothberg, OKuhn (Tucson) Telescope Operator: DHuerta (LBTO) AO Support: Telescope Support: MWagner (LBTO)...
Com20150908
08 September 2015 UT (wake up, revisited...) OSA: David Gonzalez Huerta ISp: John Morris Telescope Manager: Jeff Urban ISAs: Olga Kuhn, Barry Rothberg Another try...
Com20150909
Restart UT 09 09 15 OSA: Geno Bechetti ISp: Elliott Shield Telescope Manager: Jeff Urban ISAs: Olga Kuhn, Barry Rothberg, J. Hill, D. Thompson (all from Tucson) U...
Com20150910
2015 09 10 Restart after Summer Shutdown Mountain Manager: J Little (LBT) OSA: G Bechetti (LBT) Isp: E Solheid (LBT) Observers (or, rather, Calibrators): D Thomps...
Com20150911
Restart OSA Geno Bechetti ISp Elliott Shield Manager: Kevin Newton ISAs: B. Rothberg, O. Kuhn (Tucson) UT 09:15 Looks better prepping LBC error on tracker...
Com20150912
Restart OSA: Geno Bechetti Isp: Elliott Shield Manager: Kevin Newton ISA: Olga Kuhn, John Hill, B. Rothberg (Tucson) ======================================== ...
Com20150913
Restart 20150913 UT OSA: Geno Bechetti ZZ ISp: Elliott Shield Manager: Kevin Newton ISAs: John Hill, Olga Kuhn, B. Rothberg (Tucson) Overall Start up Summary MO...
Com20150914
Startup Night 12 20150914 UT Observers: JHill, BRothberg, OKuhn (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: Telescope Support: (LBTO) Software Su...
Com20150925
Commissioning 20150925 Observers: BRothberg, DMiller (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: DMiller Telescope Support: (LBTO) Software Support...
Com201509plan
Plan for September 2015 Startup Observing Times listed are times on sky without any weather contingency. Decision Tree Is Instrument Mounted? N: Check next in...
Com20151023
AGW1 Alignment with LUCI@ARGOS 20151023 UT Observers: JHill, DMiller (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: DMiller Telescope Support: JLittle ...
Com20151025
AGW2 Alignment with LUCI2@RFBG 20151025 UT Observers: JHill, DMiller, GTaylor, DThompson (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: DMiller Telesco...
Com20151027
AGW2 Alignment with LUCI2@RFBG 20151027 UT Observers: JHill, DMiller (Lake Arrowhead), BRothberg, DThompson (Tucson) Telescope Operator: GBechetti (LBTO) AO Suppo...
Com20151117
AGW2 transform test with LUCI2@RFBG 20151117 UT Observers: DMiller (Tucson: Home) Telescope Operator: GBechetti (LBTO) AO Support: DMiller Telescope Support: (LB...
Com20151205
AGW1 field aberration test with LUCI1@LFBG 20151205 UT Observers: DMiller, JHill, APuglisi, GTaylor, XZhang (Tucson) Telescope Operator: GBechetti (LBTO) AO Suppo...
Com20160123
23 January 2016 04:50 MODS1 collection of transform data * prep MODS1 by running transformInit.pro in ~modseng/modsScripts/Support/ * transform_collect usin...
Com20160124
24 January 2016 Mtn Manager: Mike Wagner OSA: D. Gonzalez Huerta InstSp: J. Morris Observers: B. Rothberg, D. Thompson, A. Cardwell, S. Walsh, O. Kuhn (remote)...
Com20160213
E time 20160213 UT Observers: DMiller, JHill (Tucson) Telescope Operator: DHuerta (LBTO) AO Support: DMiller Telescope Support: KNewton (LBTO) Software Support: ...
Com20160214
Title Article text. 04:40 Collimate MODS1 and MODS2 04:43 Binocular preset to BS9122 * was not in binocular mode (I decided to send the script to both sides, b...
Com20160614
LUCI 1 AO Override OA: G. Bechetti ISA: B. Rothberg AO: D.Miller, G. Taylor ========================================== UT 07:52 override called AO agrees ...
Com20160704
LUCI1 AO Comm: 01_Wunit_Transform 06:45 reconfigure from LBCs to LUCI1 07:04 2 2.5 sec darks with LUCI (20160704.0007,8) to check 07:06: Turn off LUCI2 mirror, in...
Com20160708
LUCI 1 AO Override M92 AFC testing (imaging LUCI 1) ================================== UT 05:57 Reconfiguring from MODS 1 to LUCI 1 UT 06:07 collimating o...
Com20160905
Start up Observing Night 1 w/LBC 20160905 UT Observers: JHill (LBTO), OKuhn(Tucson) Telescope Operator: DHuerta (LBTO) AO Support: DMiller Telescope Support: KNe...
Com20160906
Start up Observing Night 2 20160906 UT Observers: JHill (LBTO), DMiller, OKuhn(Tucson) Telescope Operator: DHuerta (LBTO) AO Support: DMiller Telescope Support: K...
Com20160909
Start up Observing Night 3 20160909 UT Observers: JHill, DMiller, BRothberg, AVaz (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: DMiller Telescope Supp...
Com20160910
Start up Observing Night 3 20160910 UT Observers: JHill, DMiller, BRothberg, AVaz (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: DMiller Telescope Su...
Com20160911
Start up Observing Night 4 20160911 UT Observers: JHill, DMiller, BRothberg, AVaz, PHinz (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: DMiller Teles...
Com20160912
Start up Observing Night 5 20160912 UT Observers: JHill, DMiller, OKuhn, XZhang (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: DMiller Telescope Supp...
Com201609plan
Plan for September 2016 Startup Observing Times listed are times on sky without any weather contingency. Decision Tree Is Instrument Mounted? N: Check next in...
Com20161002
E time 20161002 UT Observers: JHill, DMiller, OKuhn (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: DMiller Telescope Support: KNewton (LBTO) Software...
Com20161011
E time 20161011 UT Observers: JHill, DMiller, OKuhn (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: DMiller Telescope Support: MWagner (LBTO) Software...
Com20161018
Determination of LDG/RDG zeropoints for MODS1/MODS2 and further MODS checkout 20161018 UT:OSA: David Gonzalez HuertaISp: John MorrisObservers: Doug Miller, John H...
Com20170205
E time Observing 20170205 UT Observers: JHill, OKuhn (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: GTaylor, DMiller, XZhang, PHinz Telescope Support...
Com201702plan
Plan for 20170205 UT E time Local Mean Sidereal Time at midnight = 8 36 00.1 Sunset ( 1000 m horizon): 17 59 MST; Sunrise: 7 07 MST Evening twilight: 19 ...
Com20170902
Start up Observing Night 1 20170902 UT Observers: JHill, OKuhn, BRothberg, DMiller (Tucson) SWalsh (LBTO) Telescope Operator: SAllanson (LBTO) AO Support: GTayl...
Com20170903
Startup Night 2: 2017 Sep 03 UT Observers: OKuhn, BRothberg (Tucson) SWalsh (LBTO) Telescope Operator: SAllanson (LBTO) AO Support: GTaylor Telescope Support: K...
Com20170904
Startup Night 3: 2017 Sep 04 UT Observers: JHill, OKuhn, BRothberg (Tucson), SWalsh (LBTO) Telescope Operator: SAllanson (LBTO) AO Support: GTaylor Telescope Su...
Com20170905
Startup Night 4 20170905 UT Observers: JHill, BRothberg (Tucson), SWalsh (LBTO) Telescope Operator: SAllanson (LBTO) AO Support: D.Miller Telescope Support: P...
Com20170906
Startup Night 5 20170906 UT Observers: JHill, BRothberg, A.Cardwelll (Tucson) Telescope Operator: G.Bechetti (LBTO) AO Support: D.Miller Telescope Support: P....
Com20170907
Startup Night 6 20170907 UT Observers: JHill, BRothberg, A.Cardwelll (Tucson) Telescope Operator: G.Bechetti (LBTO) AO Support: D.Miller Telescope Support: P....
Com20170908
Startup Night 7 20170908 UT Observers: JHill, BRothberg, A.Cardwelll (Tucson) Telescope Operator: G.Bechetti (LBTO) AO Support: D.Miller Telescope Support: KN...
Com20170909
Night 8 No Log Recorded Imaging Flat tests for LUCI are noted here: https://docs.google.com/spreadsheets/d/1DKJpng97t9dqLpFbfV8r_6rYyrBt8itjF1UQoQRafF8/edit LUCI ...
Com20170910
Startup Night 9 20170910 UT Log transferred from: https://docs.google.com/document/d/1QATuV1rrwet_xMmdMHlxGyHrXPpXnWjAIkf6TEGsJBw/ Tucson: Jenny, Dave, John Hil...
Com20170911
Startup Night 10 20170911 UT Transferred from Google Docs: https://docs.google.com/document/d/1I3Epd407YOg7mzaXCG5rQgBELeVfzqy4Fk2gSmil9gk/edit Tucson: Jenny, O...
Com20170912
Startup NIGHT 11 20170912 UT Tucson: Jenny, Olga, John Hill, Amali Off site: Greg Mountain: Pat Summary: The Poptart worked. Seeing stable and nice, so we were...
Com20170913
Startup NIGHT 12 20170913 UT Tucson: Jenny, Barry, John Mountain: Kevin, David Summary: Tested SX AO bin1, 2, 3, 4 reconstructors. AGw transform verification ...
Com20170920
PEPSIPOL 20170920 UT Summary We had 2 hours of horrible seeing tonight (20170920 UT) so we worked on the list of PEPSIPOL things to do. Status below. On Thu, Sep...
Com20171010
PEPSIPOL 20171010 UT Details mostly using PEPSIPOL SX as DX has the AGW problem. 02:05 8000 Z6 IE=20 CA=10 02:30 12000 Z6 See IT 6832 as this was runaway asti...
Com20171030
MODS1 checkout (2017 October 30, first half) MODS1 was installed on Saturday, 2017 October 21. Two issues arose in starting up the instrument during the week and ...
Com20171129
MODS1 and MODS2 rotator centers (during cloudy LUCI AO night) MODS1 and MODS2 were mounted on 2017 October 21 and 20, respectively, but MODS2 required realignment...
Com20171224
24 Dec 2017 UT: E/D 1st half OSA: G Bechetti Observers: O Kuhn, A Conrad (1st half) and A Rakich (by phone, 1st half) Instrument Support: E Solheid Cloudy at suns...
Com20171228
Nightlog 20171228 UT (E/D \xBD, AZ \xBD) Cast of Characters: OSA: David Gonzalez Huerta (mountain) Isp: Alessandro Cavallaro (mountain) Observer: Olga Kuhn (remot...
Com20180119
TMS testing with binocular LBC science 20180119 UT Summary Here's a short summary of the TMS assisted LBC observations on 20180119 UT. We started about 6 UT, a...
Com20180130
20180130 UT E and D night: OSA: G. BechettiISp: A. CavallaroISA: B. Rothberg MODS1 2 transform data collection with pointing mask and MODS2 RDG correct RZP "Movie...
Com20180331
Engineering Night UT 20180331 Night Plan: * Before Opening: * PCS Patch IT 7084 (Petr) * No further on sky test of this PCS patch is needed ...
Com20180401
Engineering Night UT 20180401 Night Plan: * After Opening: * AO Startup with OSA (Doug, Al, Steve) * Verification of Conditions (Doug, Al, Steve...
Com20180505
Engineering/D Night 20180505 (UT) Night Plan: Before Opening/Twilight: * AO Startup with OSA (Doug, Al, David G.H.) * Verification of Conditions (Doug, A...
Com20180516
Engineering/D Night 20180516 (UT) 2nd half Handover 00:16 AZ time Night Plan: * D time observations at start * Olga Q1330 011 Binocular MODS (MODS1...
Com20180522
Engineering/D Night 20180522 (UT) Night Plan: * Sunset 19:21 * Moon 51% sets 01:22 * Twilight 20:52, 03:40 * Night Center 00:16 * Sunrise 05:11 ...
Com20180603
AGW3 Alignment for LUCI1 20180603 UT Observers: JHill, BRothberg (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: GTaylor (Tucson) Telescope Support: ...
Com20180604
First Half D Night Observers: JHill, BRothberg (Tucson) Telescope Operator: SAllanson (LBTO)AO Support: GTaylor (Tucson)Telescope Support: a href="https://wiki...
Com20180609
AGW3 LUCI1 checkout (20180609 UT first half) Observers: JHill, OKuhn, JPower, JWilliams (Tucson) Telescope Operator: GBechetti (LBTO) AO Support: GTaylor (Tucson...
Com20180611
AGW3 LUCI1 checkout (201806011 UT second half) Observers: JHill (Austin) DThompson, MWagner, JPower (Tucson) OKuhn (LBTO) Telescope Operator: GBechetti (LBTO) AO...
Com20180620
20 Jun 2018 UT Eng Night AGw3 collimation with IDL 03:20 John edited AGW3_WFScam.ini and set the ROI for the WFSC. Default was 260 234 1 1 We needed 512 512 1...
Com20180622
20180622 UT another attempt at AGw3 alignment Observers: JHill, OKuhn, BRothberg (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: DMiller (Tucson) Tel...
Com20180626
20180626 UT finalizing the AGw3 alignment Observers: JHill, OKuhn, DMiller (Tucson) Telescope Operator: SAllanson (LBTO) AO Support: DMiller (Tucson) Telescope...
Com20180902
Restart Night #1 UT 2018 09 02 Observers: J. Hill, B. Rothberg (Tucson) OSA: S. Allanson, assisted by J. Wiliams ISp: E. Solheid Mtn Manager: P. Hartley Before O...
Com20180903
Restart Night #2 UT 2018 09 03 OSA: S. Allanson, J. Williams Observers/ISA: B. Rothberg, J. Hill (Tucson) ISp: E. Solheid Mtn Manager: P. Hartley UT 01:22 Summ...
Com20180904
Restart Night #3 UT 2018 09 04 OSA: S. Allanson, J. Williams Observers/ISA: B. Rothberg, J. Hill (Tucson) ISp: E. Solheid Mtn Manager: P. Hartley UT 00:29 prec...
Com20180905
Restart Night #4 UT 2018 09 05 OSA: D.G. Huerta Observers/ISA: B. Rothberg, J. Hill (Tucson) Software: P. Kubanek ISp: J. Riedl, G. Bechetti Mtn Manager: P. Hartl...
Com20180906
Restart Night #5 UT 2018 09 06 OSA: D.G. Huerta Observers/ISA: B. Rothberg, J. Hill (Tucson) Software: P. Kubanek ISp: J. Riedl, G. Bechetti Mtn Manager: J. Proth...
Com20180907
Restart Night #6 UT 2018 09 07 OSA: D.G. Huerta Observers/ISA: B. Rothberg, J. Hill (Tucson) Software: P. Kubanek ISp: J. Riedl, G. Bechetti Mtn Manager: J. Proth...
Com20180908
Restart Night #7 UT 2018 09 08 OSA: D.G. Huerta (LBTO), J. Williiams (Tucson) Observers/ISA: B. Rothberg, J. Hill (Tucson) Software: S. Hooper/P. Kubanek (on call...
Com20180909
Restart Night #8 UT 2018 09 09 OSA: D.G. Huerta (LBTO) Observers/ISA: B. Rothberg, J. Hill (Tucson) Software: S. Hooper/P. Kubanek (on call) ISp: J. Morris Mtn Ma...
Com20180910
Restart Night #9 UT 2018 09 10 OSA: D.G. Huerta (LBTO) Observers/ISA: B. Rothberg, J. Hill, O.Kuhn (Tucson) Software: S. Hooper/P. Kubanek (on call) ISp: J. Morri...
Com20180911
Restart Night #10 UT 2018 09 11 OSA: D.G. Huerta (LBTO) Observers/ISA: B. Rothberg, (Tucson) Software: S. Hooper/P. Kubanek (on call) ISp: J. Morris Mtn Manager: ...
Com20180912
Restart Night #11 UT 2018 09 12 OSA: J. Williams (LBTO) S. Allanson (Tucson) Observers/ISA: B. Rothberg, J. Hill, (Tucson) Software: S. Hooper/P. Kubanek (on call...
Com20180913
Restart Night #12 UT 2018 09 13 OSA: J. Williams (LBTO) S. Allanson (Tucson) Observers/ISA: B. Rothberg, J. Hill, (Tucson) Software: S. Hooper (on call), P. Kuban...
Com20180921
UT 21 Sep 2018 Observers: B. Rothberg, J. Hill, O. Kuhn ISp: J. Morris OSA: S. Allanson Mtn. Manager: P. Hartley Open UT 06:07 Telesope reopening SOUL work c...
Com20180922
UT 22 Sep 2018 Split D/E with SOUL Commissioning Observers: B. Rothberg, O. Kuhn OSA: S. Allanson ISp: E. Solheaid Mtn Manager: P. Hartley UT 07:04 currentl...
Com20180923
UT 2018 09 23 D/E Split Night w/SOUL Observers: B. Rothberg (Tucson)OSA: S. Allanson ISp: E. Solheid Mtn Manager: P. Hartley OPEN UT 07:17 extra time for SOUL...
Com20180924
D/E Split Night UT 20180925 (first half) Observers/ISA: B. Rothberg, O. Kuhn (Tucson)OSA: S. Allanson ISp: E. Solheid Mtn Manager: M. Wagner AO; G. Taylor UT 02:...
Com201809plan
Plan for September 2018 Startup Observing Times listed are times on sky without any weather contingency. Decision Tree Is Instrument Mounted? N: Check next i...
Com20181003
Daytime aGw4 check 20181003 UT Summary We were unable to locate the light source from the ARGOS cal unit. After much searching and debugging we believe t...
Com20181028
UT OCT 28 No Observations due to LUCI 1 MOS Mask exchange Aux Cryo issue (IT 7459) Main.BarryRothberg 23 Oct 2018
Com20181029
20181029 UT Proposed Schedule (seeing 1.2" on DIMM transparency up to thin clouds): 1 but clouded out LBTI LMIRCAM/NOMIC TOO observations of Comet (3 ...
Com20181030
UT Oct 30 D/E LBTO Night Observers: B. Rothberg, M.Wagner, O.Kuhn OSA: J. Williams ISp: J. Riedl Mtn Manager: C. Bolyard Plan for Night: 1. AO Checkout 2. MOD...
Com20181102
UT Nov 02 2018 Eng Split Night with SOUL Commissioning Observers: O. Kuhn, B. Rothberg OSA:. S. Allanson ISp: J. Riedl Mtn Manager: P. Hartley Plan: 1. AGW tran...
Com20181117
UT November 17 2018 OSA: J. Williams ISA: B. Rothberg (Tucson)AO Support ARGOS: S. Walsh AO Support FLAO: G. Taylor (Tucson) Laser Dude: G. Rahmer Mtn Manager: R....
Com20181118
UT November 18, 2018 OSA: J. Williams ISA: B. Rothberg (Tucson) ISp: G. Bechetti AO Support (FLAO): G. Taylor (Tucson)AO Support (ARGOS): S. Walsh Laser Dude: G. ...
Com20181119
UT November 19 2018 OSA: J. Williams ISA: B. Rothberg (Tucson) AO Support (FLAO): G. Taylor (Tucson) AO Support (ARGOS): S. Walsh Laser Dude: G. Rahmer Software S...
Com20181120
UT 20 November 2018 OSA: J. Williams ISA: B. Rothberg ISp: G. Bechetti Mtn Manager: M. Wagner AO Support (ARGOS): S. Walsh AO Support (FLAO): D. Miller Laser Dude...
Com20181121
UT 21 November 2018 OSA: S. Allanson ISA: B. Rothberg (Tucson)ISp: J. Morris AO (ARGOS): S. Walsh AO (FLAO): D. Miller (Tucson) Laser Dude: G. Rahmer Software Sup...
Com20181127
UT 27 November 2018 Split night with Eng (1st half) / AZ (2nd half) Night Center 00:07 (Local Time) switch will be at 00:02 (local time) to accomodate reconfig...
Com20181128
UT November 28 2018 LBTO Engineering Night OSA:. D.G.Huerta ISp: E. Solheid ISA: B. Rothberg (Tucson) AO Support: G. Taylor Software Support: P. Kubanek Observer...
Com20181129
UT November 29, 2018 ARGOS/Eng LBTO Technical Night OSA: D.G. Huerta ISp: E. Solheid ISA: B. Rothberg (Tucson)ARGOS AO: J. Power, S. Walsh Laser Dude: G. Rahmer ...
Com20181204
UT Dec 04 2018 D Night MODS AGW Transform OSA: D.G. Huerta ISA: D. Thompson (Tucson) ISp: E. Solheid Summary: Barry: HD 216807, NGC 7727 HK zJ ...
Com20181222
Outline of Eng Tests 1 LBC IT 7513 test for jumps in LBC sidereal guiding * Observe field with PA=0 and PARANGLE ~ 90 deg with long ~180 sec exposure...
Com20181223
ARGOS Eng Tests (4:20 MST onwards) Files: luci2.20181223.XXX 0008 1.2, 0.4, 0.3 (Gains) 2.51sec x 10 CUBE have to restart some systems since 45 deg elevatio...
Com20181231
UT Dec 31 2nd Half D time (first half OSURC partner science) OSA: J. Williams ISA: B.Rothberg ISp: G. Bechetti Mtn Manager: M. Wagner Night Center is 00:22 (MST...
Com20190108
D Time UT Jan 08, 2019 OSA: S. Allanson ISA: B. Rothberg ISp: E. Solheid Mtn Manager: P. Hartley Night Center 00:26 Handover to occur at 00:21 from LBTI Plan: ...
Com20190118
PEPSIPOL AGW3/4 alignment UT 20190118 OSA: J. C. Williams (LBTO)Observers/ISA: J. Hill (Tucson) plus team PEPSI on the mountainSoftware: S. Hooper/P. Kubanek (on ...
Com20190119
PEPSIPOL AGW3/4 alignment UT 20190119 OSA: J. C. Williams (LBTO) Observers/ISA: J. Hill (Tucson) plus team PEPSI on the mountain Software: S. Hooper/P. Kubanek (o...
Com20190120
PEPSIPOL AGW3/4 alignment UT 20190120 OSA: J. C. Williams (LBTO) Observers/ISA: J. Hill (Tucson) plus team PEPSI on the mountain Software: S. Hooper/P. Kubanek (o...
Com20190121
PEPSIPOL Observing Night 1: 20190121 UT Observers: JHill (Tucson), KStrassmeier, IIlyin, AJarvinen, MWeber (LBTO) Telescope Operator: JCWilliams (LBTO) AO Supp...
Com20190123
PEPSI Night #3 UT 20190123 OSA: S. Allanson Observers/ISA: J. Hill (Tucson) Software: P. Kubanek ISp: Mtn Manager: Summary The start of the night is a PEPSIPFU ...
Com20190217
17 Feb 2019 UT Plan: Start with LUCI1/LUCI2 Dither test for Bino LUCI and ESM LUCI2. See if the detxy y dithers move up/down along the slit, or is there an offse...
Com20190218
20190218 UT Half E and Half SOUL C Entire night lost to weather. Closed Dome tasks: Check LBC swing arm motion. Steve reconfigured from LBTI to Binocular LBCs wit...
Com20190226
UT 26 Feb 2019 OSA: D.G.Huerta ISp: J. Morris Mtn Manager: M Wagner ISA: B. Rothberg (Tucson) AO: S. Walsh (Tucson) Observers: B. Rothberg, O. Kuhn, G. Rahmer, J...
Com20190315
UT 2019 March 15 "Beware the Ides of ARGOS" OSA: D.G.Huerta ISp: G. Bechetti ISA: B. Rothberg (Tucson) ARGOS AO: S. Walsh (Tucson) ARGOS Commander: G. Rahmer (Tu...
Com20190316
UT March 16 2019 OSA: D.G. Huerta ISp: J. Morris ISA: B. Rothberg (Tucson) AO ARGOS: S. Walsh (Tucson)ARGOS Commander: G. Rahmer (Tucson) Observers: B. Rothberg, ...
Com20190318
UT March 18, 2019 OSA: D.H.Huerta ISp: J. Morris ISA; B. Rothberg (Tucson) Mtn Manager: P. Hartley ARGOS AO: S. Walsh (Tucson) ARGOS Commandant: G. Rahmer (Tucson...
Com20190319
UT March 19, 2019 OSA: D.G. Huerta ISp: J. Morris Mtn Manager: P. Hartley ISA: B. Rothberg (Tucson)ARGOS AO: S. Walsh (Tucson) ARGOS Admiral: G. Rahmer (Tucson) A...
Com20190406
Engineering Tasks for UT 06/07 April 2019 1 LBC: * Guiding issue rotational trail/drift as a function of dither position (or not) https://lbt.issuet...
Com20190407
UT Apr 07 2018 Split Night 1st half SOUL Testing / 2nd half LBTO Technical Engineering OSA: D.G. Huerta ISp: J. Morris Mtn Manager: R.Hansen ISA: B. Rothberg ...
Com20190408
UT 08 Apr 2019 SOUL Commissioing (first half) OSA: D.G. HuertaISp: J. Morris Mtn Manager: R. Hansen ISA: B. Rothberg (Tucson) AO: D.Miller, G. Taylor (Tucson) F...
Com20190409
UT 2019 09 Apr 1st half SOUL / 2nd half TSIP A.Conrad PI OSA: D.G.Huerta ISp: J. Morris Mtn Manager: M. Wagner ISA: B. Rothberg (Tucson) AO: G. Taylor (Tucson) ...
Com20190410
UT 10 Apr 2019 OSA: J. Williams ISp: E. Solheid Mtn. Manager: M. Wagner ISA: B. Rothberg (Tucson) AO: G. Taylor Featured Players: J. Christou and the ARCETRO AO T...
Com20190423
Items to be tested ISA Support: D. Thompson Night Center: 00:18 1 MCSPU/TCS new build Top Priority but transparent to actual observations patches/builds ...
Com20190504
Commissioning PEPSIPOL Active Optics in Parallel with PEPSIPOL science 20190504 UT Details PEPSIPOL/PEPSIPOL 02:19 UT bino ACQUIRE preset Had to collimate ...
Com20190505
E time and D time for 20190505 UT Summary Tried TCS 2019A, but had problems. Switched back to 2018B, but had problems starting up. AO OSCO at the beginning clos...
Com20190521
Service Observer: Jenny Telescope Operator: DGH Plan: Hopefully LBTI (which is not logged here) but iff not, closed dome checkouts. Summary: Issues: Weather: ...
Com20190522
Outline of Night Eng Tasks for UT May 22 May 23 1 TCS2019A build no specific tests needed * switch it on during day (after handover), so we can troub...
Com20190523
UT 23 May 2019 Rollover of tasks from Previous E nights 1 TCS2019A build no specific tests needed * switch it on during day (after handover), so we c...
Com20190526
Eng Half Night Plan UT 26 May 2019 1 TCS2019A build no specific tests needed * switch it on during day (after handover), so we can troubleshoot possibl...
Com20190527
Eng Half Night Plan UT 27 May 2019 * TCS 2019A test (regardless of MODS 2 IMCS status) * MODS 2 IMCS laser repair did not succeed Decision Tree: If MODS 2 I...
Com20190619
UT 19 Jun 2019 Outline of tasks for night 1 switch TCS to 2019A and let it run as long as possible (hopefully full night) * ssh tcs@tcs1 * cd /lbt...
Com20190709
Outline of Engineering Tasks for UT Jul 9 10 11 Tasks to be done in case SOUL engineering work cannot be accomplished 1 LUCI 1 Photometric Zeropoint checks r...
Com20190902
UT Sep 2 (First Night) OSA: DG.Huerta ISp: G. Bechetti ISA: B. Rothberg, O. Kuhn (Tucson) AO: D. Miller (Tucson) Mtn Manager: P. Hartley Accomplished: Co Point...
Com20190903
UT Sep 03 2019 Restart Night#2 OSA: D.G. Huerta ISp: G. Bechetti Mtn Manager: P. Hartley ISA: B. Rothberg, O. Kuhn (Tucson)AO: D. Miller (Tucson) ACCOMPLISHED...
Com20190904
UT Sep 04, 2019 Restart Night #3 OSA: S. Allanson ISp: E. Solheid Mtn Manager: P. Hartley ISA: B. Rothberg (Tucson), O. Kuhn (Tucson) AO: D. Miller (Tucson) Ob...
Com20190905
UT Sep 05, 2019 Restart Night #4 OSA: S. Allanson ISp: E. Solheid Mtn Manager: P. Hartley ISA: B. Rothberg, O. Kuhn (Tucson) Techincal Experts: J. Hill, J. Pow...
Com20190906
UT September 06, 2019 Restart Night #5 OSA: S. Allanson ISp: E. Solheid ISA: B. Rothberg, O. Kuhn (Tucson) Mtn Manager: P. Hartley Technical Expert: J. Hill (T...
Com20190907
UT Sep 07, 2019 Restart Night #6 OSA: S. Allanson ISp: C. Bolyard ISA: O. Kuhn (Tucson) SO: J Power (Tucson) Mtn Manager: P. Hartley Technical Expert: J. Hill...
Com20190908
UT September 08, 2019 Restart Night #7 TELESCOPE CLOSED DUE TO WATER ISSUES/STORM Plan Outline: * LUCI * AGW 1 Transform * No need to upda...
Com20190909
UT September 09, 2019 Restart Night #8 OSA: S Allanson Observer: O Kuhn Summary: * MOS acquisition to check RZP. The old one is fine for L1 and the new one...
Com20190910
UT Sep 10, 2019 Restart Night #9 OSA: S. Allanson ISp: C. Bolyard Mtn Manager: M. Wagner ISA: B. Rothberg, O. Kuhn (Tucson) AO; D. Miller (Tucson) Software: P....
Com20190911
UT Sep 11, 2019 Restart Night #10 OSA: Josh Williams Observers: John, Olga Summary Clouds and fog, and there was no chance of opening. Collected data for LUCI...
Com20190912
UT Sep 12, 2019 Restart Night #11 OSA: J. Williams ISp: G. Bechetti ISA: B. Rothberg, O. Kuhn (Tucson) Mtn Manager: M. Wagner Technical Expert: J. Hill (Tucson...
Com20190913
UT September 13, 2019 Restart Night #12 OSA: Josh Williams ISp: G. Bechetii Mtn Manager: M. Wagner Observers: Greg Taylor, Olga Kuhn, John Hill, Barry Rothberg...
Com20191014
UT 14 October 2019 Contingency Planning Page in case ARGOS operations cannot use some or all of the 2nd half of UT 14 Oct 2019. Night Center 00:06 Handover wil...
Com20191107
Contingency Engineering Plan for UT Nov 07 09, 2019 * Testing whether WFS_probeRotation could be set to the wrong sign for AGW1 . 1 hour any conditions Hi...
Com20191108
UT 08 Nov 2019 * roll over of non ARGOS eng tasks not completed from UT 07 Nov 2019 * highest priority: * AGW 1 tests 1 hour * LUCI speckle im...
Com20191109
UT 09 Nov 2019 Handover ~00:03 Plan is to conduct 1 2 engineering tests before continuing with ARGOS * highest priority: * AGW 1 tests 1 hour * ...
Com20191118
E night UT 18 Nov 2019 Summary There were between 2 4 parallel activities going on for most of the night, so it can be tricky to follow what went on from the wi...
Com20191120
UT 2019 Nov 20 Split night with LBTB * LUCI * Zeropoints (clear any seeing) low priority requires min 2 airmass visits all night * /home...
Com20191203
UT 2019 Dec 03 Eng Half Night Plan: * LUCI 2/AGW 4 confirmatory transform highest priority requires seeing 1.2" on the DIMM * AGW4 Test IDL co...
Com20191206Plan
Engineering Plan for UT 06 Dec 2019 16 Dec 2019 * LUCI * Verify rotator zeropoints using M52 (until 07:30 08:00) and M67 (from ~08:15) masks first 0....
Com20191207
UT 07 Dec 2019 Eng/D Contingency for 2nd half Night Center: 0017 Handover delayed until 01:15 local time due to SHARC VIS testing LUCI 2 / AGW 4 Unavailable u...
Com20191208
20191208 UT OSA: J Williams Observers: D Miller ISA: O Kuhn Clouds and later precipitation The night was to be split between SOUL ESM checkout during the first ...
Com20191209
20191209 UT Like the previous night, this one, too, was to be split between SOUL ESM testing (1st half) and ARGOS (2nd half), with D/E programs filling in when AR...
Com20191211
UT 11 December 2019 Engineering Night (primary goal: ESM) OSA: D.G.Huerta ISp: C. Bolyard Mtn Manager: B. Bingham ISA: B. Rothberg (Tucson) AO: G. Taylor (Tucso...
Com20191212
UT 12 December 2019 OSA: D.H.Huerta ISp: C. Bolyard Mtn Manager. T. Forsyth ISA: B. Rothberg (Tucson)AO: D. Miller (Tucson)Special Guest stars: J. Christou (Tucso...
Com20191213
UT 12 December 2019 OSA: D.G.Huerta ISp: C. Bolyard Mtn Manager: T. Forsyth ISA: B. Rothberg (Tucson)AO: D Miller, G Taylor (Tucson) Special Guest stars: J. Hill,...
Com20191214
UT 14 December 2019 OSA: DG.Huerta ISp: G. Bechetti ISA: B. Rothberg (Tucson) Mtn. Manager: T. Forsyth SOUL UT 00:15 init LUCIs, taking dark test frames L1 00...
Com20191215
UT 15 December 2019 OSA: D.G.Huerta ISp: G. Bechetti Mtn Manager: T. Forsyth ISA: B. Rothberg (Tucson) AO: G. Taylor (Tucson) Special Guest Stars: Team Arcetri (I...
Com20191216
UT 16 December 2019 First Half SOUL Com / 2nd half ARGOS Com or Contingency Engineering OSA: D.G.Huerta ISp: G. Bechetti Mtn Manager: M. Wagner ISA: B. Rothberg (...
Com20191217
UT 17 December 2019 First half TSIP (Chan,LUCI) / Second half ARGOS Com or Contingency Engineering * OSA: D.G.Huerta * ISp: G. Bechetti * Mtn Manager: M....
Com20191230
UT 30 December 2019 Technical time taken out of D time for first half for checkout on AGW3 Night Center 00:22 * AGW 3 Checkout * Send an acquire preset t...
Com20191231
UT 31 December 2019 Technical time taken out of D time for first half for checkout on AGW3@RFBG Plan Night Center 00:22 * AGW 3 Checkout * Send an acqu...
Com2019Restart
2019 September Restart OUTLINE General Scope of Activities * Closed Dome/Daytime Instrument Checks (each instrument must be released before night time work ca...
Com20200101
UT 01 January 2020 OSA: D.G. Huerta ISp: C. Bolyard Mtn Manager: M. Wagner ISA: B. Rothberg (Tucson) Night Center: 00:23 GOALS: continue AGW3 checks UT 00:36 L...
Com20200107
UT 2020 Jan 07 AGW3@RFBG in parallel to TSIP science in 2nd half Summary I (JMH) flipped all the 5 variables individually (WFS_pupil_shift_x,y and WFS_pupil_di...
Com20200108
UT 08 Jan 2020 2nd Half Eng Plan Night Center 00:26 * TCS 2020A testing * Activation: * ssh tcs@tcs1 * cd lbt/tcs * curr...
Com20200109
UT 09 Jan 2020 Night Center 00:26 Plan 2nd half Eng/D time * AGW 1/3 Transform Data collection ~ 1hr LUCI Bino * Either confirmatory or new set dependi...
Com20200127
UT 27 Jan 2020 Engineering Half Night Sunset 17:52 Twilight Ends: 19:12 Moon Sets 19:42 Night Center: 00:32 Handover at 00:22 to accomodate instrument change ...
Com20200130
AGW 2 Checkout and Transform Verification (30 Jan 2020 UT) LUCI 2 Functional Checkout D. Thompson AGW 2 Checkout J. Hill, an ISA to be named later * Send a...
Com20200202
UT 02 Feb 2020 On sky AGW 2/LUCI 2 Checks Goal: verify AGW 2 functionality on sky and that it works with LUCI 2, verify LUCI 2 Rotator ZP OSA: S. Allanson ISp: ...
Com20200204
Night Plan for UT 04 Feb 2020 Night Center: 00:33 Handover: 00:23 (take into account extreme changes between focal stations) ISA: D. Thompson (Remote Room) * C...
Com20200205
Night Center: 00:33 Handover: 00:23 (take into account extreme changes between focal stations) ISA: D. Thompson (Remote Room) * Complete LUCI 2/AGW 2 On Sky Ch...
Com20200206
UT 06 Feb 2020 D/E Night ISA: B. Rothberg * Complete LUCI 2/AGW 2 On Sky Checks high priority J. Hill/B. Rothberg 1 2 hours * See UT 2020 01 30 W...
Com20200207
D/E Night UT 07 Feb 2020 Plan OSA: J. Williams Observers: S. Walsh, J. Hill, D. Miller, A. Conrad ISA: O. Kuhn * Start of night PEPSI faint object mode tes...
Com20200208
UT Feb 08 2020 OSA: J. Williams ISp: E. Solheid Mtn Manager: P. Hartley ISA: B. Rothberg (Tucson) AO: S. Walsh, D. Miller (Tucson) and Arcetri Team Data images ar...
Com20200209
UT 09 Feb 2020 SOUL Commissioning DX (SX backup) * Night Plan * Plan A: * Check out DX AdSec closed dome 1 2 hours (Arcentri team) goal is to ...
Com20200210
UT 10 Feb 2020 Final night of SOUL commissioning run * Night Plan * Checkout of rigid install on DX * If closed SOUL SX data collection with AR...
Com20200303
Plan for E/D Night UT 03 Mar 2020 * Engineering Tasks * SOUL SX AO * General Telescope * PCS patch 20200226 for TCS 2020B (needs to be act...
Com20200308
E/D Night UT 08 Mar 2020 Plan for E/D Night UT 08 Mar 2020 (Rollover from UT 03 Mar 2020) * Engineering Tasks * SOUL SX AO * On sky checkouts o...
Com20200309
09 March 2020 UT SOUL C Night 1 Notes Closed at sunset for clouds and wind Wanting to check pupil and FS alignment once again, I took a pupil image, but it look...
Com20200310
10 March 2020 UT SOUL C Night 2 Closed at sunset for clouds. ~02:00 Checked pupil and FS alignment. Both were slightly misaligned and an adjustment was made to...
Com20200822
UT 22 Aug 2020 Night #1 of Restart OSA: D.G. Huerta ISp: E. Solheid Mtn Manager: R. Hansen ISA: B. Rothberg (Tucson secret bunker) Special Guest star: O. Kuhn...
Com20200823
UT 23 Aug 2020 Night #2 of Restart OSA: D.G. Huerta ISp: E. Solheid Mtn Manager: R. Hansen ISA: B. Rothberg (Tucson secret bunker) Special Guest star: O. Kuhn...
Com20200824
UT 24 Aug 2020 Night #3 of Restart OSA: D.G. Huerta ISp: E. Solheid Mtn Manager: R. Hansen ISA: B. Rothberg (Tucson secret bunker) Special Guest star: O. Kuhn...
Com20200825
UT 25 Aug 2020 Night #4 of Restart OSA: D.G. Huerta ISp: E. Solheid Mtn Manager: R. Hansen ISA: B. Rothberg (Tucson secret bunker) Special Guest stars: O. Kuh...
Com20200826
UT 26 Aug 2020 Night #5 of Restart OSA: S. Allanson ISp: E. Solheid Mtn Manager: L. Durham ISA: O. Kuhn (Tucson) PROBLEMS 1 Lost at least an hour or more d...
Com20200827
UT 27 Aug 2020 Night #6 of Restart OSA: S. Allanson ISp: C. Bolyard Mtn Manager: L. Durham ISA: O. Kuhn (Tucson) Special Guest Stars: B. Rothberg (Tucson), J. P...
Com20200828
Restart Night #7 28 Aug 2020 UT OSA: S. Allanson ISp: C.Boylard Mtn Manager: L. Durham ISA: O. Kuhn (Tucson) Special Guest Stars: J. Hill (Tucson), B. Rothberg (T...
Com20200829
Restart Night #8 29 Aug 2020 UT OSA: S. Allanson ISp: G. Bechetii Mtn Manager: B. Bingham ISA: O. Kuhn Summary: We did not open all night due to clouds, then ...
Com20200830
Restart Night #9 UT 30 Aug 2020 OSA: S. Allanson ISp: G. Bechetii Mtn Manager: B. Bingham ISA: O. Kuhn Summary: We were closed all night due to clouds and rain...
Com20200831
Restart Night #10 UT 31 Aug 2020 OSA: S. Allanson ISp: G. Bechetti Mtn Manager: B. Bingham SO: J. Power Special Guests: D.Thompson on LUCI, S.Ertel on LMIRCam ...
Com20200901
Restart Night #11 UT 01 Sep 2020 OSA: S. Allanson ISp: G. Bechetti Mtn Manager: B. Bingham SO: J. Power Summary: Late to open for threatening clouds. Opened ...
Com20200902
Restart Night #12 UT 02 Sep 2020 OSA: J. Williams ISp: E. Solheid Mtn Manager:Jared SO: J. Power Special Guests: B. Rothberg (Blob analysist), G.Taylor (Adsec W...
Com20200903
Restart Night #13 UT 03 Sep 2020 OSA: J. Williams ISp: E. Solheid Mtn Manager: J. Schuh SO/LBTI: J. Power LBTI: S. Ertel AO: D. Miller, B. Rothberg (scripting a...
Com20200904
Restart Night #14 UT 04 Sep 2020 OSA: J. Williams ISp: E. Solheid Mtn Manager: J. Schuh SO/LBTI: J. Power LBTI: S. Ertel AO: G. Taylor, B. Rothberg (scripting a...
Com20200905
Restart Night #15 UT 05 Sep 2020 OSA: J. Williams ISp: C. Bolyard Mtn Manager: T. Forsyth SO: J. Power AO: G. Taylor, B. Rothberg (scripting and targets) 1st ha...
Com20200906
D Night / Eng Night UT Sep 06 2020 OSA: J. Williams ISp: C. Bolyard Mtn Manager: T. Forsyth SO: J. Power ISA: B. Rothberg, O. Kuhn AO: G. Taylor Summary: Cloud...
Com20200928
Engineering Night UT 28 Sep 2020 OSA; J. Williams ISp: C. Bolyard ISA: B. Rothberg (secret bunker not on the mountai), O. Kuhn (Tucson) Mtn Manager: J. Prothro ...
Com20200929
UT 2020 Sep 29 SOUL SX/LUCI 1 Commissioning OSA: J. Williiams ISp: C. Bolyard Mtn Manager: J. Prothro ISA: B. Rothberg (undisclosed secret location), R. Rothber...
Com20200930
Night #2 Soul Com UT 30 Sep 2020 OSA: D.G. Huerta ISp: G. Bechetti Mtn Manager: B. Bingham ISA: B. Rothberg (Secret Bunker) AO: J. Power, G. Taylor (Tucson) ...
Com20201001
SOUL COM Night #2 UT 01 Oct 2020 OSA: D.G. Huerta ISp: G. Bechetti Mtn. Manager: B. Bingham ISA. B. Rothberg (secret bunker) AO: G. Taylor, J. Power NightPla...
Com20201002
SOUL COM Night #4 UT 02 Oct 2020 OSA: D.G. Huerta ISp: G. Bechetti Mtn Manager: B. Bingham ISA: B. Rothberg (Secret bunker) AO: J. Power, D. Mller (Tucson) N...
Com20201026
E/D Night UT 26 October 2020 1st half LBTO/Eng 2nd half LBTI Science Night Center 00:004 Mars observations will run 45 min over Handover: 00:50 Night Plan...
Com20201027
E/D Night UT 27 October 2020 1st half LBTO/Eng 2nd half LBTI Science Night Center 00:004 handover to LBTI @23:59 (10 min instrument switch, split the differen...
Com20201028
E/D Night UT 28 October 2020 1st half LBTO/Eng 2nd half LBTI Science Night Center 00:004 handover to LBTI @23:59 (10 min instrument switch, split the differen...
Com20201029
E/D Night UT 29 October 2020 1st half LBTO/Eng 2nd half LBTI Science Night Center 00:004 handover to LBTI @23:59 (10 min instrument switch, split the differen...
Com20201030
E/D Night UT 30 October 2020 1st half LBTO/Eng 2nd half LBTI Science Night Center 00:004 handover to LBTI @23:59 (10 min instrument switch, split the differen...
Com20201031
E/D Night UT 31 October 2020 1st half LBTO/Eng PEPSI starts @19:30 local time 2nd half LBTI Science Night Center 00:003 handover to LBTI @23:58 Night Plan:...
Com20201101
E/D Night UT 01 Nov 2020 1st half LBTO/Eng/D 2nd half LBTI Science Night Center 00:003 handover to LBTI @23:58 Night Plan * Configuration at start MODS ...
Com20201130
Night Plan UT Dec 01 2020 1st half PEPSi / 2nd half D/E time Night Center 00:08 (local time) Handover: 00:03 (split reconfiguration time) * Reset SX AdSec to 30...
Com20201201
Night Plan UT 01 Dec 2020 * Starting Configuration LUCI Bino in the beam, LUCI 1 authorized * AO Science and Technical * OSCO Checkout LUCI 1 AO at T...
Com20201202
Night Plan UT 02 Dec 2020 Sunset: 17:19 Twilight Ends 18:40 * Starting Configuration is Bino PEPSI * PEPSI Pol Checkout * AGW3/AGW4 checkout and align...
Com20201203
Night Plan UT 03 Dec 2020 Sunset: 17:19 End of Twilight: 18:40 Night Center: 00:09 Handover from E/D to PEPSI at 00:04 Schedule * Starting Configuration is B...
Com20201227
20201227 UT Engineering plus PEPSI LUCI transit Summary: 1 The MODS AGw alignment checks were performed and no adjustments; neither to the hotspot nor the o...
Com20201228
Night Plan UT 28 Dec 2020 Split Night: 1st half LBTI, 2nd half D/E (this plan) Night Center 00:21 Handover 00:16 Morning Astronomical Twilight: 05:52 CLOSED BEFO...
Com20201229
Night Plan UT 29 Dec 2020 Split Night: 1st half LBTI, 2nd half D/E (this plan) Night Center 00:21 Handover 00:16 Morning Astronomical Twilight: 05:52 Night calle...
Com20201230
Night Plan UT 30 Dec 2020 Split Night: 1st half LBTI, 2nd half D/E (this plan) Night Center 00:22 Handover 00:16 Morning Astronomical Twilight: 05:53 NO chance t...
Com20201231
Night Plan UT 31 Dec 2020 Split Night: 1st half LBTI, 2nd half D/E (this plan) Night Center 00:22 Handover 02:17 Morning Astronomical Twilight: 05:54 Non photome...
Com2020602
UT 02 Jun 2020 Restart Night Log for C19 Restart OSA: J. Hill (Tucson) ISA: B. Rothberg (undisclosed bunker Tucson) Mtn Manager: R. Hansen Night Plan * Tel...
Com2020603
UT 03 Jun 2020 Restart Night Log for C19 Restart OSA: D. Gonzalez Huerta (LBTO Remote Room), J. Hill (Tucson) ISA: O. Kuhn (Tucson) Nighttime Mtn Assistant: T. Fo...
Com2020Feb_E_D_NightPlan
Plan for E/D Nights 04 07 Feb 2020 UT * Engineering * IRTC on SX AO data collection (pending install) high priority * Instructions for Runni...
Com2020Restart
2020 August/September Restart OUTLINE August 24 September 4, 2020 Engineering On Sky Restart Block General Scope of Activities * Closed Dome/Daytime Instrum...
Com2020_Dec_2021_Jan_Plan
Plan for E/D Nights UT Dec 28 Dec 31, Jan02 UT Dec 28, 29, 30, 31 2nd half of the night, Jan 02 full night Tasks to be done: Engineering Tasks * (done 2...
Com2020_Nov_Dec_Plan
Planning Page for E/D Nights UT Nov 30 Dec 3 Critical Dates/Times: * PEPSI Observations 1st half UT Dec 01 (Nov 30 local time) handover 00:00hr * PEPS...
Com2020_Oct_Plan
Plans for UT 26 Oct 01 Nov 2020 E/D Nights Engineering Tasks 1 AO Engineering test observations entire half night 1 Mars 1 2020 Oct 26 06...
Com20210102
Night Plan UT 02 Jan 2021 Sunset: 17:30 Twilight Ends: 18:53 Night Center: 00:24 Twlight Stars 05:54 Sunrise 07:17 Tasks/Programs * LUCI 1 OSCO * UDS z...
Com20210203
UT Feb 03 2021 Night Center: 00:33 handover from PEPSI 23:45 Twilight Morning 05:49 Night Plan (second half) * Reconfigure for LUCI Bino at 23:45 authoriz...
Com20210204
UT Feb 04 2021 Night Partition D/E Time twilight until 21hr handover to PEPSI (local) PEPSI 21hr 03:30hr (local) D/E Time 03:30 to twilght (local) Sc...
Com20210209
UT Feb 09 2021 Night Partition D/E Time twilight until 20:30 handover to PEPSI (local) PEPSI 20:30hr 03:30hr (local) D/E Time 03:30 to twilght (local) ...
Com20210214
UT Feb 14 2021 Night Partition D/E Time twilight until 21:30 handover to PEPSI (local) PEPSI 21:30hr 04:05hr (local) D/E Time 04:15 to twilght (local) ...
Com20210225
UT Feb 25 2021 Night Partition * Night split 50/50 w/PEPSI science D/E time 2nd half * Night Center 00:33 handover 00:28 * Moon 94% effectively up...
Com20210226
UT Feb 26 2021 Night Partition * Night split with LBTI night center 00:32 handover 00:27 to LBTI * Moon is up effectively all night (98.4%) * 1st ...
Com20210227
UT Feb 27 2021 Night Partition * Night split with LBTI night center 00:32 handover 00:27 to LBTI * Moon is up effectively all night (98.4%) * 1st ...
Com20210228
UT Feb 28 2021 Night Partition * Night split with LBTI night center 00:32 handover 00:27 to LBTI * Moon is up effectively all night (98.4%) * 1st ...
Com20210301
UT Mar 01 2021 Night Partition * Night split with LBTI night center 00:32 handover 00:27 to LBTO Eng LUCI SOUL AO * Moon is up effectively all night ...
Com20210302
UT Mar 02 2021 Night Partition * Night split with LBTI night center 00:32 handover 00:27 to LBTO Eng LUCI SOUL AO * Moon is up effectively all night ...
Com20210303
UT Mar 03 2021 Night Partition * Night split with PEPSI/PETS handover 23:30 to LBTO Eng LUCI SOUL AO * Moon rises 23:22 through twilght (79%) * 1s...
Com20210304
UT Mar 04 2021 Night Partition * Night split with PEPSI/PETS * Moon rises 23:22 through twilght (79%) * D/E time: twilight 20:40 (30min early to rec...
Com20210305
UT Mar 05 2021 Night Partition * Night split with LBTI * Moon rises 00:31 through twilight (58%) * Night Center 00:31 * HANDOVER 00:26 * D/E...
Com2021_Feb_Plan
Outline for E/D Nights UT February March 2021 Nights shared with PETS * UT Feb 3 (local Feb 2) handover from PEPSI/PETS at 23:45 until morning twilight...
Com21040318
Title Article text. Comments
ComApr2009
April 2009 Nightly Log files Observing Plan Details, April May 2009 02 03 May 2009 BG Technical observing night 10 Pointing data in partly cloudy weather 01 ...
ComApril2008
April 208 Nightly Log files 26 27 Apr 2008 SX Bent Gregorian Commissioning 25 26 Apr 2008 Software Activities SX Bent Gregorian Commissioning 25 26 Apr 2008 SX Be...
ComAugSep2008
August September 2008 Nightly Log files 19th 20th September 2008 Day 22 LUCIFER/AGw Commissioning 18th 19th September 2008 Day 21 LUCIFER/AGw Commissioning 17...
ComCovid19_20A_Restart
Restart Plan for COVID 19 20A This is the plan for bringing the telescope, MODS, and LBCs back on sky with checks. LUCI verification checks TBD when instruments ...
ComDec2008
December 2008 Nightly Log files 15 16 December 2008 LUCIFER Com2, night 12 Lost to weather 14 15 December 2008 LUCIFER Com2, night 11 Lost to weather 13 14 De...
ComDec2009
December 2009 Nightly Log files 01 January 2010 UT LDG with IRTC: Good weather lots of data. 31 December 2009 UT LDG with IRTC: Lost to weather clouds and snow ...
ComFeb2009
February 2009 Nightly Log files 16 17 February 2009 Lucifer Feb Commissioning Night 11 Lost to wind and humidity 15 16 February 2009 Lucifer Feb Commissioning N...
ComJan2009
January 2009 Nightly Log files 18 19 January 2009 LUCIFER Com3, night 10 17 18 January 2009 LUCIFER Com3, night 9 16 17 January 2009 LUCIFER Com3, night 8 15 1...
ComJul2009
July 2009 Nightly Log files Observing Plan Details, Jun 2009 07 08 Jul 2009 LUCIFER Lost to weather 06 07 Jul 2009 LUCIFER Open all night spectroscopic ...
ComJun2009
June 2009 Nightly Log files 29 30 Jun 2009 LUCIFER Lost to weather 28 29 Jun 2009 LUCIFER Mostly lost to clouds, pointing checks for 1.5 hours at end 27 28 ...
ComJune2008
June Nightly Log files 24th 25th June 2008 Day 16 Measuring Focus between IRTC and AGw guide camera. 23th 24th June 2008 Day 15 Guiding with the probe off the...
ComMar2009
March 2009 Nightly Log files 18 19 March 2009 BG Technical observing night 13 More AGw data and Field data 17 18 March 2009 BG Technical observing night 12 Tr...
ComMay2008
May 2008 Nightly Log files 21 24 May 2008 Fire, Wind, and approaching storm! 20 21 May 2008 Continue measurements for WFS off axis. 19 20 May 2008 Measure and cha...
ComMay2009
May 2009 Nightly Log files 22 23 May 2009 LFBG/IRTC Tech Obs 10 Lost to weather Closed dome testing of TCS B27 under CentOS5 and CentOS4 21 22 May 2009 LFBG/I...
ComNov2008
October November Nightly Log files 17 18 November 2008 Day 21 BG performance verification observing with IRTC 16 17 November 2008 Day 20 BG performance verifi...
ComNov2009
November 2009 Nightly Log files UT 2009 Nov 29 LUCIFER/AGw Technical Obs Lost to weather UT 2009 Nov 28 LUCIFER/AGw Technical Obs Lost to weather 27 Novembe...
ComOct2008
September October Nightly Log files 18 19 October 2008 Day 20 Telescope Commissioning with IRTC 17 18 October 2008 Day 19 Telescope Commissioning with Luc...
ComOct2009
October 2009 Nightly Log files LFBG/LUCIFER TechObs UT October 30 2009 DThompson LFBG/LUCIFER TechObs UT October 29 2009 DThompson LDG Observing Plan for UT Octob...
ComSep2009
September 2009 Nightly Log files 23 24 Sept 2009 LFBG checkout with LUCIFER 22 23 Sept 2009 LFBG checkout with IRTC 9 10 Sept 2009 LFBG re commissioning IRTC ...
ComTools
Focal Station Commissioning Tools #BinocCommands Binocular Operation Preset Both Sides Sync Preset The following steps will preset the telescope in fully binoc...
Comm20140319
Technical Observing AO Commissioning 20140319 UT Observers: JGuerra, JChristou (LBTO) JHill (Tucson remote room) Telescope Operator: SAllanson (LBTO) Outline...
DThompsonNotes
Advanced Planning: Explicit Build17 TCS checkout tests, closed dome: * GCS AGw oacserver transforms? Execute TCS startup checklist (complete @ sunset 1hr):...
FieldAberrationMeasurementDetails
Field Aberration measurements with AGw and IRTC WARNING IDL COMMAND NAMES HAVE CHANGED See AOwithIDL Summary Two separate tests for field aberration measurem...
GenericLuciferTechNightsPlan
LUCIFER Technical Observing, prep for Partner Science: UT 2010 MMM DD Observer: Telescope Operator: Instrument Support: Telescope Support: SW support: Su...
GregorianCommissioning
Technical Requirements Technical Requirements for Lucifer Commissioning Telescope Bent Gregorian Performance Verification Gregorian SX Pointing and Collimation...
IACE2011
New IE CA data with Telemetry OSU/RC Run SX side dateUT MJD TAI (sec) IE CA AZ Elev RX sx prim RY sx prim X sx prim Y sx prim...
IDLLicenseManager
Restarting the IDL License Manager Currently we have the IDL license manager, now running on the DNS named server idl license where you can ssh in as telescope. ...
IDLTools
IDL Commands for presets and offsets HINT If ever a routine returns an error, type the command IDL retall This command clears IDL back to its original state. #B...
ImportantParameters
LBTtools Important Parameters Main.DavidThompson reminds us of the following important parameters when switching between LFBG and RFBG observing with LBTtoolsIRTC...
JohnSpecial
John's Special Python Scripts Updates On 20150207, the name_hdfextract.py scripts have learned the path to older telemetry downtown. For telemetry from current ...
LBTOStarCatalogs
LBTO Star Catalogs File Location The star catalogs used by both IDL and IRAF live in /lbt/catalogs. In this directory there are many subdirectories that group t...
LBTtoolsIRTC
LBTtools.IRTC IRAF package Observing Interface This is the documentation for Dave Thompson's LBTtools.IRTC IRAF package which is the observing interface for the ...
r14 - 03 Jun 2010 - 03:35 by KatherineRueff
LbcPage
Large Binocular Cameras EF Analysis 2009 09 04 Tests of EF analysis of LBCR/B images LBC/EF Comparison for 2009 09 04 Comparison of EF and LBCFPIA results FPIA Z...
MODS2Comm0
MODS2 Commissioning Night 0 29 December 2014 UT Because of problems with SX and clouds, some DDT observations could not be done. An LBC R observation was tried, ...
MODS2Comm1
MODS2 Commissioning: Night 2 Telescope Manager: Michael Wagner Telescope Operator: David Gonzalez Huerta Instrument Specialist: Jenny Power Observers: Mark Wagner...
MODS2Comm3
MODS2 Commissioning Night 3 Blue channel sequencer board is not working properly. Last night, from 1/4 to 1/3 of the images were bad and it seemed that the noise ...
MODS2Comm4
MODS2 Closed Dome Commissioning OSA: D Gonzalez Huerta ISp: J Morris TM: K Newton ISA: O Kuhn (Dome and Cal Unit) Observers: R Pogge, O Kuhn While doing inve...
MODSCheckout
MODS Startup Tasks Closed Dome Tasks (in sequential order) 1 Insert startup masks: 1 astrometric masks (for measuring/checking rotator zeropoints) ...
NightPlanOct28_30
Outline of Nightime Operations (UT Oct 28 30 and Nov 1 2) Updated to highlight, in red, the tasks which remain to be done and are priorities for any E time that m...
NonSiderealGuiding
Non Sidereal Guiding Instructions for LBT Details for sending a hijacked Gregorian Non Sidereal preset in GUIDE or ACTIVE mode This section assumes that you want...
PointingModel
Instructions for Collecting Pointing Data and Building a Pointing Model Prerequisites: * TELESCOPE IN THERMAL EQUILIBRIUM! * Re measure mechanical rotato...
RFBGAstig2010
Astigmatism Plots for RFBG focal Station from Spring 2010 Main.DougMiller 21 Jul 2010 * Astigmatism Plot 27 April 2010: * Astigmatism Plot 28 A...
RfbgCom
Right Front Bent Gregorian Documents Focal Station Commissioning March 2010 RFBG Commissioning Plan for 20 March 2010 UT JHill RFBG Performance Verification Pl...
RotatorAngle
Rotator Angle, Position Angle, Parallactic Angle and Doug's Angle Here are some accumulated facts and issues about angles and rotators on LBT........(perhaps more...
RunningDirtI
Simple Instructions for running the IR Test Camera The IRAF package LBTtoolsIRTC communicates with the IIF and the IRS for the IRTC. See document 609g012 for the...
RunningEF
Data Assembly Data taken by irs are stored directly into the repository. Typically you will take one frame that way to get the full header information from the t...
RunningGCS
Simple Instructions for Running the GCS Subsystem for Off Axis Guiding and Wavefront Sensing Background information for the GCS Subsystem GCS Config Files Locati...
RunningOSS
Simple User's Guide to running the OSS subsystem The OSS GUI is not normally needed by observers since the PSF GUI shows the M2 hexpod position information. The M...
RunningPCS
Simple Instructions for Running the PCS Subsystem command line commands Command Line Functions for Binocular PCS (perhaps not a complete list) ptlist Usage: ...
RunningPSF
Simple Instructions for Running the PSF Subsystem for Adjusting Collimation General PSF Description (from observer's point of view) These instructions have been ...
RunningTheIRTC
Instructions for Operating the IRTC at the Telescope by J. Hill, I. Foppiani, and R. Green Shortcut/Summary: * Open xterm; issue startirtc2 command (or starti...
Sci20110301
LBCR IQ test after Remounting w/o Chip #3: UTC 2011 March 01 Observer(s):M. Pedani, O. Kuhn (Tucson) Telescope Operator: S. Allanson (LBTO) Telescope Support: J....
StartupTools
Scripts for Instrument Startup MODS: adjust left and right rotator zeropoints (not yet on the obs computers) * obtain a series of star images with detxy Y of...
SummaryApril2008
Summary of the State of Bent Gregorian Focus April 2008 The following is a summary of the state of performance of Bent Gregorian F/15 operation at the end of th...
TransformationData
Procedure for taking AGw Transformation Data This is the procedure for collection of AGw Transformation Data with IRTC in order to calibrate the AGw probe coordin...
VNCforDummies
Instructions to mirror a mountain display downtown with VNC 2017 Instructions /lbt/observer/bin/scry then select the machine you want to mirror. Old instruction...
Vibrate2008
Vibration Data from 2008 IRTC Data, 3 September 2008 Raw Data Only IRTC Data, 6 September 2008 Raw Data Only IRTC Data, 9 November 2008 Raw Data Only Download In...
Vibrate2009
Vibration Data from 2009 IRTC Data, 27 April 2009 Raw Data Only IRTC Data, 9 May 2009 Raw Data Only IRTC Data, 11 May 2009 Raw Data Only Download Instructions So...
WFSCstatusApril2008
Status of WFSC Data Acquisition and Analysis On Axis Data Collected * Able to acquire WFSC Images * Acquired WFSC data with know amount of aberration bent...
WebAtom
Foswiki's Commissioning web
WebLeftBarExample
" warn="off"}% * ** * * * * * * %IF{"istopic ''" then=" * $percntICON{\"statistics\"}$percnt $percntMAKETEXT{\"Statist...
WebNotify
* .WikiGuest * .BarryRothberg: Com20181029
WebPreferences
Commissioning Web Preferences Appearance * Set WEBBGCOLOR = #FFEFA6 * web specific background color, current color * Set SITEMAPLIST = on * Set ...
WebRss
" else="Foswiki's Commissioning web"}% /Commissioning
WhatIsTheSeeing
What is the Seeing at LBT? The frequently asked question: "What is the seeing at LBT?" can refer to either "What is the seeing right now?" or "What is the histori...
WhereIsIt
Where Is That Data File, Log File, Parameter File Located A guide to finding your way around the disks at LBTO J. M. Hill Where is the data? Instrument and IR...
Number of topics: 961
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback