You are here:
Foswiki
>
Commissioning Web
>
Com20201030
(30 Oct 2020,
BarryRothberg
)
Edit
Attach
E/D Night - UT 30 October-2020
1st half LBTO/Eng
2nd half LBTI Science
Night Center 00:004 - handover to LBTI @23:59
(10 min instrument switch, split the difference)
Sunset 17:37
Twlight Ends 18:55
Night Plan
If LBCs unavailable
if LBCs available
Closed Dome
Log:
Night Plan
If LBCs unavailable
OSCO at Twilight
Speckle test (1.5hr) - D. Thompson
M 56 19:16:35.57 +30:11:00.50
M 15 21:29:58.00 +12:10:01.00
Neptune Observations (Triton as AO Ref star) - optimal 8-10pm local time
/home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/Planet_Scripts
GRB 200826A - H-band Imaging with Bin 4 AO - (2hr) - if seeing is 1.2" or better
/home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/GRB_200826A
Observe the PSF star first
ESM tests as time permits - executed in any conditions
Located in: /home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/ESM (OBS-N)
M52 (sets 2nd half) AORef=10.7 and 15.2 - highest priority
M34 (rises above elevation 19:30hr) AORef = 12.4
Poor Weather Backup
If conditions are too poor to start with Speckle-test after OSCO
ESM M52 AORef R=10 (all 3 bands)
Neptune - regardless of conditions - want to improve and document technique
ICRF3
Science Backup Targets
/home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/Poor_Weather
H-band Library (LUCI) - only if super poor seeing AND thick clouds (only brightest stars left)
ICRF3 Followup (LUCI)
Order of observations (priority/time)
:
IERS_0017+200 - visible 1st half
IERS_2320+689 - visible 1st half
IERS_0426+273 - visible 10pm onwards
IERS_0141+268 - visible 7:30pm onwards
if LBCs available
LBC Twilight flats (if skies clear enough)
LBC Pointing Model (2hrs)
Reconfig to LUCI-Bino, authorize LUCI-1
Neptune observations - regardless of seeing conditions
GRB 200826A - H-band Imaging with Bin 4 AO - (2hr) - if seeing is 1.2" or better
/home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/GRB_200826A
Observe PSF star first
ESM as time permits - or poor seeing
Closed Dome
LUCI-SOUL
LUCI cals
G200 zJ(L1) HK(L2) 1" longslit flats (ICRF3 cals directory) - for backup poor weather programs
G200 zJ(L1) and zJ(L2) 1" longslit flats (ICRF3 cals directory) - taken in case either LUCI becomes unavailable at night - low priority
Finish off any N30 flats missed
Log:
A.Cardwell's google sheet
--
BarryRothberg
- 29 Oct 2020
Attachments
1
Attachments
1
Topic attachments
I
Attachment
Action
Size
Date
Who
Comment
JPG
Triton_1030_UT.JPG
manage
36 K
30 Oct 2020 - 00:46
ChristianVeillet
E
dit
|
A
ttach
|
P
rint version
|
H
istory
: r4
<
r3
<
r2
<
r1
|
B
acklinks
|
V
iew wiki text
|
Edit
w
iki text
|
M
ore topic actions
Topic revision: r4 - 30 Oct 2020,
BarryRothberg
Commissioning
Log In
Toolbox
Create New Topic
Index
Search
Changes
Notifications
RSS Feed
Preferences
Users
Groups
Webs
ARGOS
AdaptiveOptics
Commissioning
Engineering
FLAO
Instrumentation
LBTI
Main
MountainOperations
Operators
PartnerObserving
Safety
Sandbox
Software
System
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki?
Send feedback