E/D Night - UT 30 October-2020
1st half LBTO/Eng
2nd half LBTI Science
Night Center 00:004 - handover to LBTI @23:59
(10 min instrument switch, split the difference)
Sunset 17:37
Twlight Ends 18:55
Night Plan
If LBCs unavailable
if LBCs available
Closed Dome
Log:
Night Plan
If LBCs unavailable
OSCO at Twilight
Speckle test (1.5hr) - D. Thompson
M 56 19:16:35.57 +30:11:00.50
M 15 21:29:58.00 +12:10:01.00
Neptune Observations (Triton as AO Ref star) - optimal 8-10pm local time
/home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/Planet_Scripts
GRB 200826A - H-band Imaging with Bin 4 AO - (2hr) - if seeing is 1.2" or better
/home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/GRB_200826A
Observe the PSF star first
ESM tests as time permits - executed in any conditions
Located in: /home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/ESM (OBS-N)
M52 (sets 2nd half) AORef=10.7 and 15.2 - highest priority
M34 (rises above elevation 19:30hr) AORef = 12.4
Poor Weather Backup
If conditions are too poor to start with Speckle-test after OSCO
ESM M52 AORef R=10 (all 3 bands)
Neptune - regardless of conditions - want to improve and document technique
ICRF3
Science Backup Targets
/home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/Poor_Weather
H-band Library (LUCI) - only if super poor seeing AND thick clouds (only brightest stars left)
ICRF3 Followup (LUCI)
Order of observations (priority/time)
:
IERS_0017+200 - visible 1st half
IERS_2320+689 - visible 1st half
IERS_0426+273 - visible 10pm onwards
IERS_0141+268 - visible 7:30pm onwards
if LBCs available
LBC Twilight flats (if skies clear enough)
LBC Pointing Model (2hrs)
Reconfig to LUCI-Bino, authorize LUCI-1
Neptune observations - regardless of seeing conditions
GRB 200826A - H-band Imaging with Bin 4 AO - (2hr) - if seeing is 1.2" or better
/home/lbto/Service_Observing/Eng_D_Oct_25_31_2020/GRB_200826A
Observe PSF star first
ESM as time permits - or poor seeing
Closed Dome
LUCI-SOUL
LUCI cals
G200 zJ(L1) HK(L2) 1" longslit flats (ICRF3 cals directory) - for backup poor weather programs
G200 zJ(L1) and zJ(L2) 1" longslit flats (ICRF3 cals directory) - taken in case either LUCI becomes unavailable at night - low priority
Finish off any N30 flats missed
Log:
A.Cardwell's google sheet
--
BarryRothberg
- 29 Oct 2020
Attachments
1
Attachments
1
Topic attachments
I
Attachment
Action
Size
Date
Who
Comment
JPG
Triton_1030_UT.JPG
manage
36 K
30 Oct 2020 - 00:46
ChristianVeillet
This topic: Commissioning
>
Main
>
WebHome
>
Com20201030
Topic revision:
30 Oct 2020,
BarryRothberg
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki?
Send feedback