UT 09-Nov-2019
Handover ~00:03
Plan is to conduct 1-2 engineering tests before continuing with ARGOS
- highest priority:
- AGW-1 tests - 1 hour
- LUCI speckle imaging - 1 hour
- ESM tests - 45 min per script
AGW1-Tests: Steve A
Steve hunting for Target/GS/PA to get the X probe position to +/-140mm...
07:24UT ACTIVE preset RA 05:39:24.7 DEC +40:38:43.7 AZ 64.0 EL 60.5 Test
- newpoint AO203 TelM =ACTIVE gs=33 PA=30
- GS is set to SFP(x,y) (mm): -119.449, 22.3345
07:29UT ACTIVE preset RA 05:43:28.6 DEC +43:29:36.1 AZ 58.2 EL 60.3 Test
- newpoint AO198 TelM =ACTIVE gs=31 PA=-80
- GS is set to SFP(x,y) (mm): -152.526, 50.9072
07:32UT ACTIVE preset RA 05:43:28.6 DEC +43:29:36.1 AZ 58.0 EL 60.8 Test
- newpoint AO198 TelM =ACTIVE gs=27 PA=-135
- GS is set to SFP(x,y) (mm): -148.939, 36.2547
07:34UT ACTIVE preset RA 05:43:28.6 DEC +43:29:36.1 AZ 57.9 EL 61.2 Test
- newpoint AO198 TelM =ACTIVE gs=20 PA=-10
- GS is set to SFP(x,y) (mm): 123.653, 44.7596
07:37UT ACTIVE preset RA 05:43:28.6 DEC +43:29:36.1 AZ 57.7 EL 61.7 Test
- newpoint AO198 TelM =ACTIVE gs=20 PA=-160
- GS is set to SFP(x,y) (mm): -129.464, 23.0635
07:40UT ACTIVE preset RA 05:43:28.6 DEC +43:29:36.1 AZ 57.4 EL 62.3 Test
- newpoint AO198 TelM =ACTIVE gs=23 PA=-190
- GS is set to SFP(x,y) (mm): -135.275, 47.0682
Goldilocks config found, proceeding with test:
07:41UT ACTIVE preset RA 05:43:28.6 DEC +43:29:36.1 AZ 57.2 EL 62.7 Test
- newpoint AO198 TelM =ACTIVE gs=23 PA=-200
- GS is set to SFP(x,y) (mm): -141.392, 22.8639
- Z9/10 are unstable, oscillating
07:52UT Setting WFS_probeRotationFactor -1.0 float
- Sat Nov 9 07:52:00.373 2019 Stop GCSL: Success
- Sat Nov 9 07:52:04.380 2019 Start GCSL: GCSL started.
07:53UT ACTIVE preset RA 05:43:28.6 DEC +43:29:36.1 AZ 56.2 EL 64.5 Test
- newpoint AO198 TelM =ACTIVE gs=23 PA=-200
- GS is set to SFP(x,y) (mm): -141.381, 22.8721
- Z9/10 appear to be stable, low
Keeping WFS_probeRotationFactor at -1.0
--
BarryRothberg - 09 Nov 2019