UT 20130917 Technical Observing - TCS and AO Testing

Observer: JHill, DMiller (Tucson)
Telescope Operator: SAllanson (LBTO)
Software Support: Team TCS and DCox (Tucson)
AO Support: DMiller (Tucson)
Telescope Support: (LBTO)
Instrument Support: JPower (LBTO)

Summary

Testing DX Adaptive Optics for 0.5hours at the beginning. Then we closed for humidity and that was the end of it.

Build 2013C has been used on-sky for both sides of LBTI, and for IRTC@RFBG. All other focal stations have been extensively tested with the dome closed.

Preparations

Details

DX AO Tests

Open

ACQUIRE and ACTIVE presets for IRTC @ RFBG

02:40 Close for humidity

TCS Testing of 2013C

We did lots of closed-dome tests of 2013C - especially the numerous combinations of pseudomonocular mode.

-- JohnHill - 17 Sep 2013
Topic revision: r2 - 17 Sep 2013, JohnHill
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback