You are here:
Foswiki
>
Commissioning Web
>
Com201305Plan
(21 May 2013,
JohnHill
)
Edit
Attach
LBTO Focal Station Checkout, 21-22 May 2013 UT
These are the tests following the re-installation of the SX Adaptive Secondary.
LBTO Staff:
Doug and John in Remote observing room at Steward will be performing Focal Station checkout.
Juan Carlos online at home
LBTI Staff:
Andy and Vanessa at LBTO
Anybody in the Remote Observing room?
LFBG focal station: Seeing Limited Mode
Initial pointing and alignment (1 hour)
See details in
BGTechProcedures
Collimate with Active Optics to make sure hexapod motions are correct (30 minutes)
Collect field data set (8 stars) to check binodal astigmatism (Seeing < 1.0" or postpone) (1 hour)
Analyze LFBG field data set
< 1 hour required to determine if secondary position motion required
Switch to LCBG
LBTI spend this hour aligning the LCBG focal station and start diffraction limited testing
There are some internal alignments of LBTI, performed by LBTI people
If a motion > 15" (on-sky) of secondary required then back to LFBG
Switch back to LFBG
Make secondary TT motion correction
Measure field data set (8 stars) to check binodal astigmatism has improved (1 hour)
If a motion of < 15" then make no changes
Propagate the M2 TT values to other focal stations
LDG focal station
Revert pointing and collimation files back to SX
AdSec
values determined on 20130202 (daytime)
Switch to LDG focal station (15 minutes)
Initial pointing and alignment (1 hour, but not needed if LFBG is adjusted)
Collimate with Active Optics (15 minutes)
Collect field data set (8 stars) to check binodal astigmatism (Seeing < 1.0" or postpone) (1 hour)
Analyze LDG field data set
< 1 hour required to determine if secondary position motion required
If motion required, will make change tomorrow and start with LDG tomorrow night
LCBG focal station: Diffraction Limited Mode
LBTI Team will make Plan, LBTO people will support
AdSec
operation
Start with low order reconstructors, move to higher order to see if lost actuators have an effect
--
DougMiller
- 20 May 2013
E
dit
|
A
ttach
|
P
rint version
|
H
istory
: r5
<
r4
<
r3
<
r2
|
B
acklinks
|
V
iew wiki text
|
Edit
w
iki text
|
M
ore topic actions
Topic revision: r5 - 21 May 2013,
JohnHill
Commissioning
Log In
Toolbox
Create New Topic
Index
Search
Changes
Notifications
RSS Feed
Preferences
Users
Groups
Webs
ARGOS
AdaptiveOptics
Commissioning
Engineering
FLAO
Instrumentation
LBTI
Main
MountainOperations
Operators
PartnerObserving
Safety
Sandbox
Software
System
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki?
Send feedback