Commissioning: 24 May 2010 UT
Observer: John H, Doug M, Kate R (in Tucson)
Telescope Operator: SAllanson, WWack (in Tucson)
Telescope Support: Brian (LBTO)
Instrument Support: TShih (LBTO)
Adaptive Secondary Operator: Runa (LBTO)
Summary
Closed due to very high winds all night
Kate practiced driving the telescope (pointto, offset, field_BS9177.cl, gopoint, tran_StoneM_mix1.cl) to prepare for the late June commissioning run.
Preparations
Details
--
DougMiller - 24 May 2010