AO Commissioning: 29 April 2010 UT
Observer: SEsposito (Arcetri), JHill (Tucson)
Telescope Operator: SAllanson, DHuerta (LBTO)
Telescope Support: JUrban (LBTO)
Instrument Support: DOfficer (LBTO)
Adaptive Secondary Operator: MXompero (LBTO)
Summary
Lost to weather - high winds
Preparations
Details
Winds are gusting above 30 m/sec at the start of the night, so we are closed. (The forecast is not encouraging.)
The time is being used for miscellaneous AO tasks plus telescope operator training.
--
JohnHill - 29 Apr 2010