AO Commissioning: 29 April 2010 UT

Observer: SEsposito (Arcetri), JHill (Tucson)
Telescope Operator: SAllanson, DHuerta (LBTO)
Telescope Support: JUrban (LBTO)
Instrument Support: DOfficer (LBTO)
Adaptive Secondary Operator: MXompero (LBTO)

Summary

Lost to weather - high winds

Preparations

Details

Winds are gusting above 30 m/sec at the start of the night, so we are closed. (The forecast is not encouraging.)

The time is being used for miscellaneous AO tasks plus telescope operator training.

-- JohnHill - 29 Apr 2010
Topic revision: r1 - 29 Apr 2010, JohnHill