AO Commissioning on 29 March 2012

Observer(s):C. Arcidiacono, L. Busoni, A.Riccardi,F. Quiros JC. Guerra (LBTO)

Telescope Operator: D. Huerta (LBTO)

SW Support: T. Sargent (Tucson)

Telescope Support: J. Urban (LBTO)

Instrument Support: J. Morris (LBTO)

Summary

Close dome calibrations using the retroreflector.

The awake up of the left system gave problems during the power on and this prIt was impossible to identify the spots of the artifial light, differetn search using

Details

8:00 Power on of the system, this procedure has failed after a time out of one of the process that was down. This process was the bayside stages.

The prower on procedure were sent several times with the same failure states; the stages didn't move.

It was necessary to power on/off different devices till we found the right way to perform the power on in the right device configurations.

10:00 Alignment the hexapod.

After setting the previous values of the hexapod's positions, the spot couldn't be seen in the IRTC field, and only it was possible to see some reflexions.

-- JuanGuerra - 31 Mar 2012