You are here: Foswiki>AdaptiveOptics Web>Logs>Log_20111213 (14 Dec 2011, JuanGuerra)Edit Attach

AO Commissioning on 13 December 2011. LEFT UNIT

AO support: Arcetri team, Juan Carlos Guerra(LBTO).

Summary

- We (LBTO team) arrieved late in the afternoon. Road conditions bad. Snowing

- Problem with the offloading procedure.

- Alignment of the W unit with the hexapod.

- Close loop with 400 modes (bin1).

Details

-- JuanGuerra - 14 Dec 2011
Topic revision: r1 - 14 Dec 2011, JuanGuerra
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback