Summary

Details.

10:40

Telescope release for soulDX checkout

10:57

Power on SoulDX.

Bayside stage timeout.
  • Power cycle 24V.
  • Home stages.
  • Operate.
Argos swing arm deployed using the argos interface, the OSS reported errors for the other Arms swing arms...The arms reached the working positions and the OSS reported moving.

OSS_deploy_error_20230909.png

Retract Argos arms using the Argos interface.

argos-swingarms_retracted-20230909.png

Stop the test. The OSS with the errors. Call Paul Grenz.

11:21 Power off WFS.

Paul grenz back OSS. and it back in Operations.

-- JuanCarlosGuerra - 09 Sep 2023
Topic revision: r2 - 10 Sep 2023, JuanCarlosGuerra
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback