Plan:

Start with LBTI for SOUL verification with Amali driving followed by LUCI ESM target for Barry

LBTI Verification overview:
  • Verifiy LBTI AO is delivering what is needed for Science run at end of May with M3 aligned on coldstop - 400modes
  • Test updated 500 mode table (M3 aligned to WFS Moving in tip to -200, tilt 90)
  • Test 576 modes
LUCI ESM overview:
  • AO Ref star is R=11.2 (12.4 applying the Barry correction factor). This is Bin 1 ESM, however, it is ~2' from the dwarf galaxy.
  • Collecting "free" SL data with LUCI2
  • Master diagnostic patch has been activated
Doug powered up and checked out LUCI WFS in the afternoon and will log on for running the LUCI ESM show ~ 3:45UT

Overview:

-- JenniferPower - 01 May 2021
Topic revision: r1 - 01 May 2021, JenniferPower
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback