08:25 Open Chamber

08:38 PresetAO because I had not enabled nobcu47 mode
  • power off
  • power on (wfs_complete_(no_bcu47)). Power off to BCU47, tip/tilt and cameralens
  • % enable_nobcu47_mode.sh

08:38 New preset, runAO: Success rotator at 190

09:05 Closed loop at 121 rotator

09:30 Loop Open, max safe skip

09:45 Closed loop at 121

10:00 Closed loop at 145

10:40 Closed loop at 168

11:00 Closed loop at 168

11:20 Close for Humidity