Pre-requisits:
Organize telescope access with Telescope Manager and mail to telescopework
ARGOS chiller must be running (
HowToStartChiller
)
ARGOS power must on (
HowToEnableMainPower
)
ARGOS software must be running (
HowToStartSoftware
)
Procedure
Open AArb (ARGOS Arbitrator) GUI
Command line: argos_?x_arbitrator_engineering_gui
On Desktop: Go Application -> Argos ?X -> arbitrator
Tab 'Main': Press 'Power up'
All controllers should be in "UNKNOWN", in state "POWERED_OFF" do "Restart" first
This will take a while. End state will be
Sources taking the most time are:
LAS: Warming up lasers (end status: Standby 1 shutter closed)
LGSW: Cooling down the CCD (end temperature -20deg)
Tab 'Main': Press 'Set up'
This will initialize motors and
BCU
. Important step in case of recovery!
Tab 'Main': Press 'Start up'
Lasers should be minimum in class 1 to succeed
Lasers will emit light within the laser box
Tab 'Main': Press 'Prepare'
This state change will check the connection to the AOS and FLAO.
Notes:
Yellow transition states can not be interrupted and do not accept command!
Overall system can be monitored in a status GUI:
Command line: argos_?x_status_gui
On Desktop: Go Application -> Argos ?X -> argos all ?x status gui
--
MarcoBonaglia
- 21 Feb 2018
E
dit
|
A
ttach
|
P
rint version
|
H
istory
: r2
<
r1
|
B
acklinks
|
V
iew wiki text
|
Edit
w
iki text
|
M
ore topic actions
Topic revision: r2 - 27 Jun 2018,
WolfgangGaessler
ARGOS
Log In
Toolbox
Create New Topic
Index
Search
Changes
Notifications
RSS Feed
Statistics
Preferences
Webs
ARGOS
AdaptiveOptics
Commissioning
Engineering
FLAO
Instrumentation
LBTI
Main
MountainOperations
Operators
PartnerObserving
ProjectManagement
Safety
Sandbox
Software
SummerShutdown
System
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki?
Send feedback